Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Agriculture was posted on September 1, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

GAOA LDV Crystal Lakes Water & Septic Resuscitation, PSICC, Colorado

Awarded
1240LT26Q0107Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia, identified by solicitation number 2027-027. This opportunity is open to various small business designations, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by the deadline of December 4, 2026. The scope of work involves comprehensive sewer installation and site development, including the open cut installation of PVC pipes ranging from 6 to 30 inches and Ductile Iron Pipe from 18 to 24 inches. Key structural requirements include the installation of standard and doghouse manholes, interior drop assemblies, and a CSO regulator fit out. Specialized tasks include 24-inch DIP trenchless crossings with associated launch and receiving shafts, as well as the abandonment of existing pipes and manholes. Site work entails clearing and grubbing of 5,130 square yards of wooded areas, seeding, fine grading, and the implementation and maintenance of a Stormwater Pollution Prevention Plan (SWPPP). Critical project deliverables include the maintenance of flows and bypass for all pipes and manholes to ensure operational continuity, along with geotechnical instrumentation and monitoring. Additionally, the project requires specific railroad insurance. The bid schedule outlines various general and contingent items, including mobilization and extra depth excavation, though the total estimated contract value is not specified.
Cleary Construction, Inc.

POSTED

about 2 hours ago

DEADLINE

in about 1 month
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont in North Carolina with a project estimate of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station. Key infrastructure improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The final deliverables comprise a fully operational pumping station featuring mechanical and electrical systems, a generator, odor control equipment, and new gravity sewer connections. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on responsiveness regarding the submission of MWBE documents, including the Good Faith Efforts Form and Table A. Performance is governed by EJCDC standard forms, including the C-700 General Conditions and C-800 Supplementary Conditions. The contractor is required to provide performance and payment bonds, as well as proof of insurance. Project timelines are triggered by a Notice to Proceed, and failure to achieve substantial completion will result in liquidated damages of 1,000 dollars per day. Payment is processed via applications for payment submitted to the Engineer, with terms due thirty days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 2 hours ago

DEADLINE

in 11 days
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including the installation of platforms and access improvements. Mechanical and piping requirements include the relining, modification, or replacement of small and large diameter steel and ductile iron pipes, pipe supports, valves, and piping appurtenances, as well as the installation and operation of a temporary 11 MGD pumped bypass. Additionally, the project entails the rehabilitation of reactor mixers and aerators, replacement of motor control center components, modifications to sluice and slide gates, rerouting of sump pump discharge lines, excavation, trench work, and surveying. This solicitation is open to various small business set-asides, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. Subcontractors are specifically requested for lead abatement, metals fabrication, painting, coatings, FRP reinforcing systems, and access hatches. All subcontractors must utilize union labor and be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates provided at the time of bid for reimbursement. Quotes are due by November 17, 2026, and the final bid date is November 18, 2026. Contracts will be based on Garney Standard Purchase Order and Subcontract forms, and any exceptions must be submitted as redlines with the quote.
Garney Pacific, Inc.

POSTED

about 2 hours ago

DEADLINE

in 19 days

AI Contract Overview

Show more

Solicitation 1240LT26Q0107 is a total small business set-aside for the GAOA LDV Crystal Lakes Water and Septic Resuscitation project, managed by the USDA Forest Service at the Pike-San Isabel National Forests in Leadville, Colorado. The project involves comprehensive infrastructure upgrades, including the installation of a 2-inch HDPE waterline beneath Colorado Highway 24, which requires CDOT permitting and subsurface utility engineering. Additional work includes replacing well pumps to achieve a 15 GPM supply, installing dual-stage booster pumps and water storage, upgrading electrical panels and meters, and replacing multiple septic systems and dosing infrastructure for the Blue House, Brown House, Bunkhouse, and Shop. The scope also encompasses asphalt removal and the installation of new roads and gates. The contract is a firm fixed-price award based on the lowest price technically acceptable criteria, with an estimated magnitude between 250,000 and 500,000 dollars. Awardees must commence work within 10 calendar days of the notice to proceed and complete all activities, including final cleanup, within 90 calendar days. Performance and payment bonds are required, and the project is subject to Davis-Bacon prevailing wage determinations. Proposals must be submitted by September 15, 2026, and include a signed SF1442, a priced schedule of items, a technical proposal detailing the approach and past performance, and a bid guarantee.

General Info

Install 2-inch HDPE waterline, upgrade septic and electrical systems, replace pumps, and reconstruct road and gate in Leadville, Colorado.

NAICS

237110 - Water and Sewer Line and Related Structures Construction

Place of Performance

Leadville, CO, 80461, USA

Set-Aside

SBA

Documents

15

1240LT26Q0107 RFI #1 Q&A – GAOA LDV Crystal Lakes Water & Septic

DOCX, High priority: read this first2 pages · q-and-a
High

Amendment 0001 - 1240LT26Q0107 GAOA LDV Crystal Lakes

PDF, High priority: read this first1 page · amendment
High

Crystal Lakes Water and Septic Resuscitation Project Manual 1240LT26Q0107

PDF, High priority: read this first173 pages · project-manual
High

Crystal Lakes Water and Septic Systems Resuscitation - Engineering Drawings

PDF, High priority: read this first19 pages · drawings
High

General Decision Wage Determination CO20260003 for Colorado Heavy Construction

PDF, High priority: read this firstwage-determination
High

Pre-Bid Site Visit Plan for Crystal Lakes Water & Sewer Resuscitation

DOCX, High priority: read this first1 page · site-visit-plan
High

Schedule of Items for GAOA Crystal Lakes Water and Septic Resuscitation

XLSX, High priority: read this first1 page · schedule-of-items
High

Solicitation 1240LT26Q0107 GAOA LDV Crystal Lakes Water & Septic Resuscitation

PDF, High priority: read this first34 pages · ifb
High

SOW 1240LT26Q0107 Crystal Lakes Water and Septic Systems Resuscitation

DOCX, High priority: read this first5 pages · sow
High

Well Permit Number 117217 Affidavit and Completion Report

PDF, High priority: read this first10 pages · permit-application
High

1240LT26Q0107 GAOA LDV Crystal Lakes Water & Septic Resuscitation RFI Form

DOCX, Low priority1 page · rfi
Low

Attachment 6 Test Pits Report for 1240LT26Q0107

PDF, Low priority12 pages · other
Low

Crystal Lakes Work Center Site Map

PDF, Low priority4 pages · site-map
Low

GAO LDU Crystal Lakes Water & Septic Resuscitation Site Visit

PDF, Low priorityindustry-day
Low

Well Permit Number 268119 for US Forest Service, Lake County CO

PDF, Low priority1 page · permit
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseAwarded
Posted

Combined Synopsis

Notice updated

The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → USDA Forest Service
Contacts1 person available
OfficeWASHINGTON, DC, 20250, USA
Office AddressWASHINGTON, DC, 20250, USA
Contacts
James Edington

Full Description

Show more

On September 1, 2026, amendment 0001 to solicitation 1240LT26Q0107 - GAOA LDV Crystal Lakes Water & Septic Resuscitation at Pikes National Forest has been posted to SAM.gov and accomplished the following:


1. Post RFI questions and answers labeled C05a RFI QA 1240LT26Q0107.


2. Post pre-bid sign in sheet labeled C05b Site Visit 2026.08.19.


This SF30 must be acknowledged and submitted with your proposal.


******************************************************************************************************************************************************


This project involves installing a new 2-inch HDPE waterline beneath Colorado Highway 24, including completing all Subsurface Utility Engineering required for CDOT permitting. Work includes connecting the new waterline from Dwelling 1 to the existing distribution system, replacing the well pump to provide a 15 GPM supply, installing a dual‑stage booster pump and basement water storage, and performing associated electrical upgrades such as relocating meters, burying service lines, upgrading panels, and supporting septic and booster pump systems. The project also replaces multiple septic systems serving the Blue House, Brown House, Bunkhouse, and Shop, installs new sewer and dosing infrastructure, and includes asphalt removal along with new road and gate installation.

More opportunities from Department Of Agriculture → USDA Forest Service

Same awarding agency

NAICS: 621111
New
Federal
Jacobs Creek JCC Medical Services
Solicitation # 1282A727Q0002
Solicitation 1282A727Q0002 is a Request for Quotation issued by the USDA Forest Service for on-site medical services at the Jacobs Creek Job Corps Center in Bristol, Tennessee. This firm-fixed-price contract is 100% set aside for small businesses under NAICS code 621111. The scope of work requires licensed medical professionals, such as Physicians, Nurse Practitioners, or Physician Assistants, to provide basic health services including examinations, assessments, treatment, immunizations, and prescription issuance. Services are typically required one to two days per week, Monday through Friday, from 8 am to 5 pm, totaling 400 hours per year. The contract structure consists of a base year running from January 11, 2027, to January 10, 2028, with four one-year options and a final six-month extension. Award will be based on best value, with technical capability and past performance weighted more heavily than price. To be considered responsive, offerors must submit a completed Quoter’s Questionnaire, current resumes for key personnel, unrestricted medical licenses, DEA registrations, and proof of medical liability insurance of at least 1 million dollars. All services must comply with OSHA, HIPAA, and American Medical Association guidelines. Invoices are to be submitted monthly via the Invoicing Processing Platform. Quotations must be submitted in Word or PDF format to the designated point of contact by 5:00 PM Eastern Time on November 17, 2026.
Offices of Physicians (except Mental Health Specialists)

POSTED

about 12 hours ago

DEADLINE

in 19 days
View Details
NAICS: 237310
New
Federal
GAOA Brainard Lake Recreation Area Deferred Maintenance
Solicitation # 1240LT27Q0004
Solicitation 1240LT27Q0004 is a Request for Quotation issued by the USDA Forest Service for deferred maintenance and accessibility improvements at the Niwot Picnic Trailhead within the Brainard Lake Recreation Area near Ward, Colorado. This project, estimated between $100,000 and $250,000, is a 100% Total Small Business Set-Aside under NAICS 237310. The scope of work includes demolishing existing timber parking barriers and retaining walls, constructing new rock retaining walls and timber steps, creating accessible compacted aggregate trails, renovating and constructing picnic sites, and revegetating disturbed areas. The contractor must commence work within 10 calendar days of the notice to proceed and complete all tasks, including final cleanup, within 120 calendar days. The contract is awarded based on the lowest price technically acceptable criteria, evaluating the offeror's technical approach and past performance on at least three similar projects completed within the last three years. Required submissions include a signed SF1442, a priced Schedule of Items, a technical proposal, and bid guarantees. Key compliance requirements include adherence to Davis-Bacon wage determinations, OSHA safety regulations, and MUTCD standards for signage. Performance and payment bonds are required, and the contractor must submit a company-approved accident prevention plan and evidence of insurance before beginning on-site work. Inspection and final acceptance are governed by FAR 52.246-12.
Highway, Street, and Bridge Construction

POSTED

1 day ago

DEADLINE

in about 2 months
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS