GAOA South Park Office Rehab Pike National Forest
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The contractor is responsible for a comprehensive rehabilitation of the GAOA South Park Office located in Fairplay, Colorado, under the USDA Forest Service. Scope of work includes full removal and replacement of the existing roof with a new standing seam metal system, encompassing all associated components such as underlayment, ridge vent, flashing, drip edge, roof curbs, crickets, gutters, and downspouts. Additionally, an ice and snow melt system must be installed across the roof, valleys, gutters, and downspouts, complete with integrated electrical circuits. Interior work involves removing old carpet and installing carpet tiles, replacing damaged acoustical panels and ceiling tiles, sealing windows, and adding new insulation in dropped ceiling areas. The project also requires installation of additional communication outlets and electrical infrastructure to support telecommunications needs. Exterior work includes constructing a chain link fence with both personnel and motorized gates, along with all necessary electrical connections and safety features. The contract is a Total Small Business Set-Aside under NAICS code 236220, with responses due by August 11, 2026, and the primary point of contact is James Edington of the USDA Forest Service in Washington, D.C.
General Info
Agency
NAICS
Place of Performance
Fairplay, CO, 80440, USASet-Aside
Timeline
Response Deadline
Organization & Contact Information
Full Description
On July 27, 2026, amendment 0001 to solicitation 1240BH26Q0028 - GAOA South Park Office Rehab in Pike National Forest has been posted to SAM.gov and accomplished the following:
1. Post responses to the questions received labeled "A7 RFI QA 127EAX26Q0029."
2. Post site visit sign in sheet labeled “C05b Site Visit Sign In Sheet 1240BH26Q0028.”
This SF30 must be acknowledged and submitted with quotes.
**************************************************************************************************************************************************
Work for this project requires the contractor to be responsible for supplying all labor, materials, equipment, utilities, miscellaneous items, freight and delivery for the following:
1. Remove and install new standing seam metal roof; including underlayment, ridge vent, flashing, drip edge, roof curbs, crickets, gutters, and downspouts.
2. Install roof, valley, gutter, and downspout ice/snow melt system including electrical circuits.
3. Interior and exterior modifications including remove carpet and install carpet tiles, replace stained and damaged acoustical panels and ceiling tiles, and seal windows. Also, install new insulation in the areas where the ceiling is dropped.
4. Install additional communication outlets and electrical for telecom.
5. Install chain link fence, personnel gate, motorized gate, and associated electrical and safeties.