This Combined Synopsis/Solicitation opportunity from Department Of Agriculture was posted on July 28, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
GAOA South Park Office Rehab Pike National Forest
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The USDA Forest Service, through its South Park Ranger District, is soliciting quotes for the GAOA South Park Office Rehab project located at 320 US Hwy 285 in Fairplay, Colorado, within the Pike National Forest at an elevation of approximately 9,953 feet. This acquisition, identified as solicitation 1240BH26Q0028, is a Total Small Business Set-Aside under FAR 19.5 using NAICS code 236220, with a small business size standard of $45 million. The contract requires the selected contractor to furnish all labor, materials, equipment, and services for comprehensive rehabilitation work, including removal and installation of a new standing seam metal roof with all associated components such as underlayment, flashing, gutters, and downspouts; installation of an electrical ice and snow melt system on the roof, valleys, gutters, and downspouts; interior upgrades involving replacement of carpet with carpet tiles, acoustical ceiling panels, and ceiling tiles; sealing of windows; installation of new insulation in dropped ceiling areas; addition of communication outlets and telecom electrical circuits; and construction of a chain link fence with personnel and motorized gates including associated electrical and safety systems. All work must comply with approved drawings, specifications, and standards including TIA/EIA-606-A for labeling, ANSI A13.1 for color coding, and UL 969 for labeling materials. Roofing work is restricted to the months of May through October, with no work permitted on weekends or federal holidays, and building operations must continue uninterrupted. The contractor must begin performance within 10 calendar days of the Notice to Proceed and complete all work within 120 days of NTP or by June 30, 2027, whichever comes first, with performance bound by the 395-day contract duration stated in SF1442. The solicitation mandates submission of four separate PDF documents: a completed and signed SF1442 form with all required blocks filled, a detailed price proposal with offeror details, a technical proposal demonstrating capability to meet all SOW requirements including sequencing of work, resource availability, and subcontractor details, and a bid guarantee in the form of Standard Form 24 and accompanying Power of Attorney. Offerors must maintain an active SAM.gov registration. Technical proposals must address how all scope elements will be fulfilled, identify subcontractors with their experience, and detail work
General Info
Agency
NAICS
Place of Performance
Fairplay, CO, 80440, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
On July 28, 2026, amendment 0002 to solicitation 1240BH26Q0028 - GAOA South Park Office Rehab in Pike National Forest has been posted to SAM.gov and accomplished the following:
1. Post responses to the questions received labeled "C05a RFI QA 1240BH26Q0028 07282026."
This SF30 must be acknowledged and submitted with quotes.
**************************************************************************************************************************************************
On July 27, 2026, amendment 0001 to solicitation 1240BH26Q0028 - GAOA South Park Office Rehab in Pike National Forest has been posted to SAM.gov and accomplished the following:
1. Post responses to the questions received labeled "C05a RFI QA 1240BH26Q0028."
2. Post site visit sign in sheet labeled “C05b Site Visit Sign In Sheet 1240BH26Q0028.”
This SF30 must be acknowledged and submitted with quotes.
**************************************************************************************************************************************************
Work for this project requires the contractor to be responsible for supplying all labor, materials, equipment, utilities, miscellaneous items, freight and delivery for the following:
1. Remove and install new standing seam metal roof; including underlayment, ridge vent, flashing, drip edge, roof curbs, crickets, gutters, and downspouts.
2. Install roof, valley, gutter, and downspout ice/snow melt system including electrical circuits.
3. Interior and exterior modifications including remove carpet and install carpet tiles, replace stained and damaged acoustical panels and ceiling tiles, and seal windows. Also, install new insulation in the areas where the ceiling is dropped.
4. Install additional communication outlets and electrical for telecom.
5. Install chain link fence, personnel gate, motorized gate, and associated electrical and safeties.
More opportunities from Department Of Agriculture → USDA Forest Service
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 650+ contractors already using CLEATUS