Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Nevada was posted on May 28, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Garnet Valley Mountain View Waterline (Segment C

Closed
012472 & Mountain View Waterline )State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
SLED
El Rancho Drive, La Madrona Drive Guardrail Project, Federal Project No. HSIPL-5936(135)
Solicitation # 40579
The El Rancho Drive and La Madrona Drive Guardrail Project, Federal Project No. HSIPL-5936(135), is a public infrastructure safety initiative managed by the County of Santa Cruz Department of Public Works. The project involves the installation of the Midwest Guardrail System and associated infrastructure repairs across 16 total locations, specifically 6 locations along El Rancho Drive and 10 locations along La Madrona Drive. The scope of work includes the removal of existing guardrails and AC dikes, cold planing AC pavement to a depth of 2 inches, constructing new AC dikes, and building earth retaining structures. The estimated cost of the project is 812,997 USD, with a required completion timeframe of 70 working days. The project is subject to strict federal and state regulations, including Buy America requirements for iron, steel, and manufactured products, and adherence to the Davis-Bacon and Related Act. It is a prevailing wage project governed by the Department of Industrial Relations. Contractors must provide a bid bond or security, as well as faithful performance and payment bonds upon award. Compliance requires rigorous documentation, including mill tags for steel products, certificates of compliance, and a clear chain of custody record verified by the Engineer. Proposals must be submitted electronically via the OpenGov portal and include mandatory certifications regarding debarment, non-collusion, and equal employment opportunity.
Public Works

POSTED

about 9 hours ago

DEADLINE

in 23 days

AI Contract Overview

Show more

The Southern Nevada Water Authority is seeking bids from qualified firms to undertake the construction of the Mountain View Waterline project, which includes two segments—Segment A and Segment C—located in Nevada. Segment C involves the installation of approximately 9,819 linear feet of 24-inch ductile iron waterline, fiber optic conduit, and associated appurtenances, along with the installation of steel casings, a PRV vault assembly, electrical components, and NV Energy conduits. This segment also encompasses pavement work, traffic control, soil stabilization, construction of maintenance access paths and shoulders, rip rap, and other related infrastructure improvements. Segment A covers roughly 7,500 linear feet of similar waterline installation, steel casings, fiber optic conduit, and associated work, including pavement removal and replacement, grading, soil stabilization, and traffic control measures. The project has an estimated cost of approximately $22.58 million, with a response deadline of June 24, 2025. The work site spans key intersections along Apex Power Parkway, Garnet Valley Boulevard, and U.S. Highway 93, with detailed specifications provided in the contract documents. Interested bidders are encouraged to direct questions to the designated purchasing contact, Andrea Corsey, via email or phone. The contract is managed under NAICS code 237310, and the project is administered by the Las Vegas Valley Water District in Nevada.

General Info

Documents

0

No documents available

No documents were posted with this contract.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Opportunity to quote asphalt repairs_Laura Street Sewer Improvements ProjectOpen now, due in 10 days
  • Terrace Drive Sewer System Improvements, Chimney RockOpen now, due in 14 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyNevada → Las Vegas Valley Water District
Contacts1 person available
OfficeN/A

Full Description

Show more
Southern Nevada Water Authority invites qualified firms to submit Bids for the following Work, see Contract Documents for full details:     The Site of the Work for Mountain View Waterline (Segment C) begins near the intersection of Apex Power Parkway and Garnet Valley Boulevard, terminating approximately 9,800 linear feet southeast along Apex Power Parkway to Grand Valley Parkway. The Site of Work for Mountain View Waterline (Segment A) begins near the midpoint of APN 103-10-099-003 Public Right-of- Way, traveling northeast towards the intersection of Grand Valley Parkway and U.S. Highway 93, and terminating approximately 6,200 linear feet southeast along the U.S. Highway 93 Frontage Road.   The Work for Mountain View Waterline (Segment C) consists of installation of approximately 9,819 linear feet of 24-inch diameter ductile iron waterline, fiber optic conduit, and associated appurtenances. Additionally, it includes 735 linear feet of 42-inch steel casing, 39 linear feet of 48-inch steel casing, and a 12-inch by 8-inch by 2-inch PRV vault assembly, complete with associated appurtenances, electrical, and piping. NV Energy 4-inch conduit, and pull boxes will also be installed as part of this Contract. Other components of the Work include pavement, traffic control signage, and striping removal and replacement, final soil stabilization, construction of a maintenance access path, construction of maintenance access shoulders, concrete cut off walls, rip rap, traffic and dust control measures, and all other appurtenant work.   The Work for Mountain View Waterline (Segment A) consists of installation of approximately 7,500 linear feet of 24-inch diameter ductile iron waterline, fiber optic conduit, and associated appurtenances. Additionally, it includes 78 linear feet of 42-inch steel casing, 403 linear feet of 48-inch steel casing. NV Energy 6-inch conduit and pull boxes will also be installed as part of this Contract. Other components of the Work include pavement, traffic control signage, and striping removal and replacement, grading, final soil stabilization, construction of maintenance access shoulders, rip rap, traffic and dust control measures, and all other appurtenant work   Engineer's estimate: $22,580,520   Questions regarding this bid must be directed to the Bid Contact listed in this Bid.  

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS