Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Garvanza Pump Station Replacement Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California Los Angeles Department of Water and Power

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

North Avenue 62, North Avenue 63, Los Angeles, CA, 90042

Set-Aside

NONE

Documents

(6)

Garvanza Pump Station Replacement Project - Environmental Summary

PDFenvironmental-summary

Garvanza Pump Station Replacement Project - ISMND Appendices

PDF

Garvanza Pump Station Replacement Project - Initial Study/Mitigated Negative Declaration

PDFismnd

Garvanza Pump Station Replacement Project - Notice of Completion

PDFnotice-of-completion

Garvanza Pump Station Replacement Project - Notice of Intent to Adopt Mitigated Negative Declaration

PDFnotice-of-intent

Garvanza Pump Station Replacement Project - Notice of Intent (Spanish)

PDFspecial-notice

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Los Angeles Department of Water and Power
Contacts1 person available
OfficeN/A
Organization / Agency
California Los Angeles Department of Water and Power
Office AddressN/A
Contacts
Jazmin MartinEnvironmental Specialist

Full Description

Show more
The Los Angeles Department of Water and Power (LADWP) is proposing the Garvanza Pump Station Replacement Project (proposed project), which consists of the construction of a new Garvanza Pump Station to meet increased backup potable water supply demands and building standards; replacement of the Highland Reservoir Regulator Station to provide operational redundancy and increase backup supply; upsizing of existing trunk lines to replace older piping and improve pressure; installation of a new residual control system to monitor and manage water quality; and replacement of the existing electrical substation to support the new facilities. The overall purpose of the proposed project is to improve the resiliency and operational flexibility of the LADWP Water System by replacing and upgrading aging and deteriorating infrastructure and increasing vital backup supply. The proposed project is located in the Highland Park neighborhood of the City of Los Angeles at 420 North Avenue 62. The project site is situated in the southern half of a 7.4-acre site that was the former site of the Highland Reservoir, and currently includes the Garvanza Pump Station, Meridian Tank, Highland Reservoir Regulator Station, Meridian Regulator Station, and an electrical substation. The northern half of the former Highland Reservoir site is occupied by Garvanza Park. The proposed project also includes installation of a power line for the electrical substation and fiber optic line for the communications equipment along North Avenue 63, Garvanza Avenue, and Figueroa Street. Built in 1907, the existing Garvanza Pump Station is a dual zone facility capable of providing potable water to Highland Park Tank (778 Service Zone) and Eagle Rock Reservoir (950 Service Zone) with suction from the Meridian Tank (619 Service Zone). Due to mainline leaks in the distribution system caused by high discharge pressures, the Garvanza water pumps no longer serve as the primary supply but remain on standby and serve as emergency backup in case of an outage at the Metropolitan Water District of Southern California’s LA-17 connection. The existing Highland Reservoir Regulator Station serves as backup supply to the 778 Service Zone from the 950 Service Zone and is currently the only LADWP-owned backup supply in the eastern 778 Service Zone. The existing Garvanza Pump Station building has severe structural deficiencies and does not meet the current building code. Several sizeable horizontal and vertical wall cracks have developed over time making building collapse a possibility in the event of a major earthquake. The project site has experienced historical settlement and is located in the Alquist-Priolo Earthquake Fault Zone, making it a seismic safety concern. In 1989, the City of Los Angeles Cultural Heritage Commission adopted Garvanza Pumping Station and Site of Highland Reservoir as a historic-cultural monument based on its age, history, and architectural design. The site was listed as Los Angeles Historic-Cultural Monument No. 412 prior to the decommissioning of the Highland Reservoir. Due to the extensive structural damage, current building code deficiencies, and based on the pump station’s operational requirements to serve as an essential and critical emergency backup facility, a new pump station is proposed, and the existing pump station would be decommissioned and remain in-place. Construction of the proposed project is expected to commence in mid-2027 with completion anticipated in late 2030.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Biola CSD - Wastewater Treatment Plant Improvements (C-06-8155-210), Kerman, CA
Solicitation # biola-csd-wastewater-treatment-plant-improvements-c-06-8155-210-kerman-ca
GSE Construction Co., Inc. is seeking quotes from qualified subcontractors and suppliers for the Biola Community Services District Wastewater Treatment Plant Improvements (Redesign) Project in Kerman, California. This comprehensive infrastructure project involves the demolition of existing facilities and the draining of multiple lagoons and ponds. Key construction elements include a new headworks facility with mechanical screening and compaction units, a new influent eccentric manhole, a flow meter vault, and the replacement of influent pumps and surface aerators. Additionally, the scope covers the installation of a sludge dewatering pipeline and ponds, a reinforced concrete pad for an emergency generator, and a new CMU operations and electrical building equipped with HVAC and plumbing. The project also requires the implementation of a facility-wide PLC/SCADA monitoring system and various civil improvements such as asphalt resurfacing, grading, and piping. This opportunity is open to small businesses and certified disadvantaged, minority, and women-owned business enterprises across a wide range of NAICS codes related to heavy and civil engineering construction. Interested parties must submit their responses by October 21, 2026, and can coordinate with the primary point of contact, Christina Pauls.
GSE Construction Co., Inc.

POSTED

about 7 hours ago

DEADLINE

in 29 days
View Details
NAICS: 237110
New
JCSD Intervalley Pipeline Project; PN C155003
Solicitation # PN C155003
The Jurupa Community Services District Intervalley Pipeline Project, solicitation number PN C155003, involves the installation of 3.3 miles of potable water transmission pipeline located on Country Village Road in Jurupa, California. Managed by Filanc, the project has an engineer's estimate of 36,000,000 dollars and is subject to American Iron and Steel (AIS) and Build America, Buy America (BABA) requirements. The scope of work is comprehensive, encompassing pipeline infrastructure such as valves, welding, cathodic protection, jack and bore, and precast vaults, as well as civil works including paving, striping, flatwork, fencing, and potholing. Technical services required include videography, testing and inspections, settlement monitoring, survey, and E&IC, alongside compliance tasks such as SWPPP, traffic control, and asbestos pipe demolition and removal. The solicitation is open to a wide range of small business set-asides, including SDB, WOSB, HUBZone, and Veteran-owned businesses, with a strong emphasis on the participation of SBE, MBE, and WBE firms. Filanc has committed to providing assistance to qualified small businesses regarding bonding, insurance, credit lines, and equipment to encourage diverse subcontracting. Bids for the various project scopes are due by September 23, 2026. Interested parties can obtain plans and specifications through the primary point of contact, Julia Masaitis.
Filanc

POSTED

about 7 hours ago

DEADLINE

in 1 day
View Details
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project in Highland, California, is a solicitation issued by James W. Fowler Co. on behalf of the Metropolitan Water District of Southern California. The scope of work involves the furnishing and installation of approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project includes the installation of various contractor-furnished and Metropolitan-furnished valves ranging from 54 to 132 inches, as well as tie-ins measuring 54 and 145.5 inches. Additional infrastructure requirements include the construction of four surge tanks, two valve vaults, an air compressor yard structure, drainage improvements, electrical upgrades, instrumentation and controls, and piping systems. The project requires specialized civil works, including the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. This opportunity is open to small businesses, including SBA-certified service-disabled veteran-owned small businesses, minority business enterprises, and women business enterprises. James W. Fowler Co. is actively encouraging M/W/DBE participation and offers assistance with bonding, insurance, and lines of credit to eligible subcontractors. Bids and subcontractor pricing must be submitted by September 29, 2026, with all negotiations finalized 24 hours prior to the bid opening.
James W. Fowler Co.

POSTED

about 7 hours ago

DEADLINE

in 7 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS