Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

Gas Main Installation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Georgia → City of BufordView Agency

NAICS

237120 - Oil and Gas Pipeline and Related Structures ConstructionView NAICS

Place of Performance

GA, USA

Set-Aside

NONE

Documents

This scope was carved out of 250308.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Buford Highway Natural Gas Main Replacement Project - 2023 PHMSA Grant

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyGeorgia → City of Buford
ContactsNo contacts available
OfficeN/A
Organization / Agency
Georgia → City of Buford
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs the installation of high-pressure steel gas mains for prime contractors on City of Buford PHMSA grant projects. Executes trenched and untrenched installation of 16,500 linear feet of 6-inch high pressure steel gas main, including line valves and connections. Requires trenchless boring equipment and compliance with Build America, Buy America Act. Must be an SRCS Operator Qualification subscriber and hold a Georgia State Contractor's License. Delivers installed gas main.

Similar Contracts

Same NAICS industry code

NAICS: 237120
New
Federal
Joint Base Langley Eustis Tank Repairs
Solicitation # W9128F27RA018
Solicitation W9128F27RA018 is a total small business set-aside design-build contract for the repair and maintenance of Tank 2186 at Joint Base Langley-Eustis, Virginia, supporting the Defense Logistics Agency. The project scope is divided into repair and maintenance phases. Repair activities include replacing the tank roof, repairing issue, receipt, and low suction piping, removing the mechanical tape gauge, replacing spiral stairs, repairing the stilling well, re-installing the tank ATG system, repairing shell manholes, replacing chime sealant, and addressing containment area, grounding, and weld spacing issues. Maintenance requirements involve replacing tank and piping coatings, providing strapping charts, and performing a final API 653 inspection. The contract is managed by the Department of Defense through the W071 Endist Omaha office, with a construction magnitude estimated between 4 million and 8 million dollars. The procurement includes specific CLINs for repair, maintenance, and ATG equipment, as well as an option for asbestos-containing material disposal. Compliance requirements include adherence to Division 01 specifications regarding quality control, safety, and cybersecurity, as well as prevailing wage rates for Virginia heavy construction as defined in wage determination VA20260198. Proposals are submitted via PIEE, and the selection process incorporates past performance evaluations through standard USACE questionnaires.
W071 Endist Omaha

POSTED

2 days ago

DEADLINE

in about 1 month
View Details
NAICS: 237120
New
Federal
Los Alamitos AASF Tank Repair Maintenance
Solicitation # W9128F26RA060
Solicitation W9128F26RA060 is a firm-fixed-price, design-build contract issued by the U.S. Army Corps of Engineers, Omaha District, for the repair and maintenance of vertical aboveground storage Tank 922 at the Los Alamitos AASF in California. The project is a total small business set-aside with an estimated value between 1 million and 5 million dollars. The scope of work includes comprehensive repairs and maintenance performed to API 653 standards, encompassing piping repairs, the replacement of thermal relief lines, spiral stairs, and the water draw-off system, as well as the installation of a new automatic tank gauge system and secondary containment liner. To minimize disruption to fueling operations, the contractor must phase work accordingly and may utilize temporary storage tanks as detailed in the construction plans. The project requires a performance period of approximately 410 to 420 calendar days, with liquidated damages set at 1,000 dollars per day for delays. Key personnel requirements include a project superintendent with at least 8 years of construction experience and 5 years of experience in similar projects. Proposals are evaluated based on a low-price technically acceptable source selection process, focusing on the technical approach and a detailed Gantt chart schedule. Following several amendments, the final proposal due date is September 22, 2026. The contractor is responsible for adhering to Davis-Bacon Act wage determinations for Orange County, California, and must comply with EM 385-1-1 safety standards and Buy American regulations.
W071 Endist Omaha

POSTED

2 days ago

DEADLINE

in 12 days
View Details
NAICS: 237120
New
Federal
NITROGEN-ARGON PIPING INSTALLATION at the Watervliet Arsenal (WVA)
Solicitation # W911PT-26-Q-A122
Solicitation W911PT-26-Q-A122 is a total small business set-aside for the installation and removal of nitrogen and argon piping at the Watervliet Arsenal Building 35A in New York. The project involves removing existing piping above floor level and installing new 316/316L stainless steel piping and Swagelok fittings in Rooms 0010 and 0012, including the installation of a control manifold and shut-off loops. All work must adhere to ANSI B16, B31.3, and B31.12 standards, with pipe supports conforming to MSS SP-58. The estimated project magnitude is between 100,000 and 250,000 dollars, with a performance period running from October 1, 2026, to December 31, 2026, or 90 calendar days from the receipt of the Notice to Proceed. The contractor is required to provide 100 percent payment and performance bonds and must comply with Davis-Bacon Act wage determinations under General Decision NY20260002. Technical requirements include strict labeling standards per ASME A13.1, featuring green backgrounds with white lettering and directional arrows. Acceptance is contingent upon visual inspections and a pneumatic pressure test held for at least two hours at 25 percent of the rated operational pressure. Eligible offerors must demonstrate a minimum 10-year history of successful performance and provide three references for similar cryogenic piping projects. Invoicing and payment will be processed electronically through the Wide Area WorkFlow system.
W6QK Acc Wva

POSTED

6 days ago

DEADLINE

in about 22 hours
View Details

More opportunities from Georgia → City of Buford

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS