This Solicitation opportunity from Texas was posted on February 24, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Gatesville ISD Synthetic Track Removal & Replacement
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The Gatesville Independent School District has issued a Request for Proposal (RFP 2026-0225) for the removal and replacement of the synthetic track surfacing at its high school stadium. The project scope includes the removal and off-site disposal of the existing surfacing on the track oval D-zone and a single long jump runway. Subsequently, approximately 5,800 square yards of black 13mm permeable paved mat (epiQ Tracks S200 or an equivalent product) will be installed with a structural spray polyurethane surfacing system. The installation will include basic striping but will exclude lettering, logos, or distance tick marks. Work must be performed under environmental conditions of at least 50°F and minimal wind, with cleanup conducted as necessary. Deliveries and performance will occur at a Gatesville ISD location under FOB destination terms, with a requirement to complete deliveries within specified time frames. The solicitation emphasizes a comprehensive evaluation process that goes beyond pricing, considering factors such as vendor reputation, quality of goods and services, compliance with district needs, and delivery promptness under a best-value award approach. Proposal submissions must be sealed and physically delivered by March 18, 2026, with no opportunity for electronic submission or late bids. Required proposal components include multiple certifications (e.g., anti-collusion, Senate Bill 252, House Bill 89, Certificate of Interested Parties), a resident/nonresident vendor certification, and other compliance documents. The contract includes standard requirements for packaging, marking, and invoicing but lacks formal federal acquisition clauses and defense-oriented specifications, reflecting its nature as a public school district procurement. Inspection and acceptance will be conducted upon delivery by the district, which retains the right to reject defective workmanship or materials. Overall, the solicitation is tightly regulated with mandatory transparency and ethical compliance certifications tailored to Texas state statutes.
General Info
Agency
Place of Performance
Set-Aside
Documents
1AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownThis one is closed. Find the next one like it.
Open contracts like this one, right now:
- MAIN WASTEWATER TREATMENT PLANT SECONDARY REACTORS REHABILITATION,PHASE 2, SPECIFICATION SD-462Open now, due in 8 days
- EBMUD – SD-462 – Secondary Reactors Rehab. – Phase 2Open now, due in 8 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Solicitation
Response deadline time changed from 8:00 PM UTC to 7:00 PM UTC on Mar 18, 2026.
Deadline has passed
Submission Closed
Organization & Contact Information
Full Description
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.
Join 900+ contractors already using CLEATUS
