Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Texas was posted on February 24, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Gatesville ISD Synthetic Track Removal & Replacement

Closed
RFP 2026-0225State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238990
New
EBMUD – SD-462 – Secondary Reactors Rehab. – Phase 2
Solicitation # SD-462
The EBMUD Secondary Reactors Rehabilitation Phase 2 project, solicitation number SD-462, is a comprehensive infrastructure project located at the Main Wastewater Treatment Plant in California. The scope of work involves the rehabilitation of covered and open concrete structures, relining and replacement of steel and ductile iron pipes and supports, and the installation of valves and piping appurtenances. Key technical requirements include the installation and operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, improvements to instrumentation and electrical systems, replacement of motor control center components, and the modification of sluice and slide gates. Additionally, the project encompasses the installation of platforms, rerouting of sump pump discharge lines, excavation, trench work, and surveying of reactor areas. The estimated contract value for this project ranges between 18.5 million and 19.5 million dollars. This solicitation is designated as a Small Business set-aside, including SBA certified Veteran Owned Small Business, Service-Disabled Veteran Owned Small Business, Women-Owned Small Business, and HUBZone Small Business. The bid opening is scheduled for December 2, 2026. Ranger Pipelines Incorporated is seeking quotes from certified DBE, DVBE, and SBE subcontractors for specialized services such as coating, lining, concrete rehabilitation, and welding. All subcontractors must comply with applicable state, county, and federal regulations.
Ranger Pipelines Incorporated

POSTED

about 1 hour ago

DEADLINE

in 8 days

AI Contract Overview

Show more

The Gatesville Independent School District has issued a Request for Proposal (RFP 2026-0225) for the removal and replacement of the synthetic track surfacing at its high school stadium. The project scope includes the removal and off-site disposal of the existing surfacing on the track oval D-zone and a single long jump runway. Subsequently, approximately 5,800 square yards of black 13mm permeable paved mat (epiQ Tracks S200 or an equivalent product) will be installed with a structural spray polyurethane surfacing system. The installation will include basic striping but will exclude lettering, logos, or distance tick marks. Work must be performed under environmental conditions of at least 50°F and minimal wind, with cleanup conducted as necessary. Deliveries and performance will occur at a Gatesville ISD location under FOB destination terms, with a requirement to complete deliveries within specified time frames. The solicitation emphasizes a comprehensive evaluation process that goes beyond pricing, considering factors such as vendor reputation, quality of goods and services, compliance with district needs, and delivery promptness under a best-value award approach. Proposal submissions must be sealed and physically delivered by March 18, 2026, with no opportunity for electronic submission or late bids. Required proposal components include multiple certifications (e.g., anti-collusion, Senate Bill 252, House Bill 89, Certificate of Interested Parties), a resident/nonresident vendor certification, and other compliance documents. The contract includes standard requirements for packaging, marking, and invoicing but lacks formal federal acquisition clauses and defense-oriented specifications, reflecting its nature as a public school district procurement. Inspection and acceptance will be conducted upon delivery by the district, which retains the right to reject defective workmanship or materials. Overall, the solicitation is tightly regulated with mandatory transparency and ethical compliance certifications tailored to Texas state statutes.

General Info

Gatesville ISD requests sealed bids by March 18, 2026, for synthetic track surfacing replacement.

Agency

Texas → GATESVILLE ISD

Place of Performance

TX, USA

Set-Aside

NONE

Documents

1
PDF, High priority: read this first24 pages · rfp
High

Read the document

Every page of every file, in your free workspace.

Read the document

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • MAIN WASTEWATER TREATMENT PLANT SECONDARY REACTORS REHABILITATION,PHASE 2, SPECIFICATION SD-462Open now, due in 8 days
  • EBMUD – SD-462 – Secondary Reactors Rehab. – Phase 2Open now, due in 8 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Deadline changed

Response deadline time changed from 8:00 PM UTC to 7:00 PM UTC on Mar 18, 2026.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyTexas → GATESVILLE ISD
Contacts3 people available
OfficeGATESVILLE, TX, 76528, USA

Full Description

Show more
● Remove existingtrack surfacing system from track oval D-zone and one long jump runway anddispose of off site● Provide andinstall approximately 5,800 SY of epiQ Tracks S200 black 13mm permeable pavedmat, or equivalent, and structural spray polyurethane surfacing system on thetrack oval and events● Basic stripingnot to include lettering, logos, or distance tick marks● Clean up asnecessary Thetemperature must be 50 degrees or rising, with minimal wind, for any surfaceactivities

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS