Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Sources Sought opportunity was posted on August 26, 2011. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

General Construction Contractor (Task Orders)

Closed
24590-NP-FSR-UA11-00003Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236210
New
Federal
F-15EX 8-Bay Maintenance Hangar Complex-Industry Day
Solicitation # W50S8527H1CU0
The National Guard Bureau is seeking market intelligence for the construction of an aircraft maintenance hangar complex at Selfridge Air National Guard Base in Harrison Township, Michigan. This project supports 21 Primary Aircraft Authorization F-15 EX aircraft and is estimated to have a magnitude between 150 million and 200 million dollars. The scope includes the demolition of buildings 3, 5, 117, and 120, with new parking constructed in the footprints of buildings 117 and 120. The construction may be executed in three phases: Hangar 1, a 2-bay corrosion control and fuel cell hangar; Hangar 2, a 4-bay maintenance hangar; and Hangar 6, a 2-bay munitions and training facility. The project also requires necessary utility and infrastructure upgrades. The government is considering a fixed-price agreement utilizing an Other Transaction Agreement under the authority of 10 U.S.C. 2808a, with funding potentially provided in annual phases of approximately one-third of the total cost. Technical requirements include compliance with DoD antiterrorism and force protection standards, adherence to Air Force and base design standards, and specialized foundations to meet flood plain requirements. Design is anticipated to be 100 percent complete by early 2027. This notice is for planning purposes only and is not a formal solicitation. Interested firms under NAICS code 236210 must provide company details, bonding capacity, and evidence of experience with aviation facilities and constrained-site construction to the designated points of contact by the response deadline of December 1, 2026.
W7NF Uspfo Activity Miang 127

POSTED

1 day ago

DEADLINE

in about 1 month
NAICS: 236210
New
SLED
Facilities & Parks New Supply Warehouse Building
Solicitation # ITB FM 04-27
The Board of County Commissioners of Okaloosa County, Florida, is soliciting bids under ITB FM 04-27 for the construction of a new 9,000 square foot metal supply warehouse for the Facilities and Parks Department located at 5489 Old Bethel Road in Crestview. The project involves comprehensive site preparation and construction, including the installation of energy-efficient HVAC systems, electrical and plumbing work, and telecommunications wiring. All work must comply with the 2023 8th Edition Florida Building Code, ADA standards, and OSHA regulations, with specific structural requirements to withstand 160 MPH ultimate wind speeds. A fire alarm system is explicitly not required for this project. Bids must be submitted electronically via OpenGov by November 4, 2026, at 3:00 pm CST. The contract will be awarded to the responsive and responsible vendor with the lowest bid, though the County reserves the right to negotiate the most advantageous agreement. The selected contractor must provide a dedicated project manager and furnish both bid and performance bonds. The project timeline is 12 months from the notice to proceed. Payment will be processed through the County Finance Office in accordance with the State of Florida Local Government Prompt Payment Act, contingent upon annual appropriation. For projects involving federal grant funding, contractors must be registered in SAM.gov and comply with Buy America and Trafficking Victims Protection Act requirements.
Facilities & Parks

POSTED

6 days ago

DEADLINE

in 6 days

AI Contract Overview

Show more

This firm fixed price subcontract is for general construction services at the Hanford Tank Waste Treatment and Immobilization Plant in Richland, Washington. With an estimated budget between 100,000 and 300,000 dollars, the contract operates on a task order basis to provide labor, materials, and equipment for both permanent and non-permanent plant facilities. The project timeline began with a notice to proceed on October 26, 2011, with all work scheduled for completion by November 13, 2012. The scope of work includes architectural, structural, mechanical, and electrical installations, specifically focusing on the delivery, assembly, and commissioning of pre-engineered buildings. Key tasks involve installing catwalk steel grating on buildings T-01 and T-52, installing fall arrest tie-off points and repairing flashing on building T-15, and managing HVAC relocation and moisture control room installation. The subcontractor is responsible for engineering design, foundation work, and utility connections, adhering to commercial quality levels and various international building and safety codes.

General Info

Fixed price construction subcontract for Hanford plant facilities, budgeted $100k-$300k, 2011 to 2012.

Agency

N/A

NAICS

236210 - Industrial Building Construction

Place of Performance

The Project site is located in the 200 East Area of the Hanford Reservation near Richland, Washington, along the Columbia River, RICHLAND, WA, 99354, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

1 update
PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Notice updated

Notice details unchanged. Attachments may have changed.

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyN/A
Contacts1 person available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A

Full Description

Show more
GENERAL CONSTRUCTION CONTRACTOR Temporary Building Facility to Replace Existing T-14 Subcontract Requisition Number: 24590-NP-FSR-UA11-00003 Submit Interest and Prequalification Documents By: August 24, 2011 Estimated Budget: >$100,000.00 < $300,000.00 Schedule: Issue Request for Proposal: August 31, 2011 Award and Notice to Proceed: October 26, 2011 Start Work: November 14, 2011 All Work Complete: November 13, 2012 Safety Classification: NON-ITS Additional Characteristic: NONE Quality Level: CM Type of Subcontract: FIRM FIXED PRICE (per task order) PROJECT DESCRIPTION AND LOCATION The Hanford Tank Waste Treatment and Immobilization Plant (WTP) is a complex of radioactive waste treatment processing facilities designed and constructed by Bechtel National, Inc. for the Department of Energy (DOE). The facility will process the Hanford Site tank waste and convert the waste into a stable glass form. The Project site is located in the 200 East Area of the Hanford Reservation near Richland, Washington, along the Columbia River. The site elevation varies from 662 to 684 feet above mean sea level. Ambient temperature range is -23 degrees F minimum to 113 degrees F maximum, with relative humidity of 5% minimum to 100% maximum. The project design life is 40 years. SCOPE OF WORK This Subcontract is for general contractor services to perform work on the WTP Construction Site and be will be authorized on a task order basis. Each task order will describe the specific scope of the work to be performed. SUBCONTRACTOR shall provide all labor, materials, equipment, tools, transportation, permits, design and supplies necessary to install architectural, structural, mechanical, electrical commodities for permanent plant and non-permanent plant Civil Materials Testing Facility T-14A Subcontractor shall be responsible for all work required to install "cat walk" steel grating for the purpose of access to roof mounted HVAC units on T-01 and T-52 building located at the WTP Construction Site including but not limited to the supply of required building materials, tools and scaffolding. Subcontractor shall be responsible for all work required to install permanent personal fall arrest tie off points at the North and the South ends of the upper roof section of building T-15 located at the WTP Construction Site. Subcontractor shall be responsible for all work required to repair flashing on the lower East and West roof sections at the T-15 building. Work is to include but not limited to maintenance, and supply of components and deliverables for temporary construction offices and permanent plant facilities to include LAW, LAB, PT, HLW, and BOF per the requirements defined in the Task Orders. Subcontractor shall determine all preservation maintenance requirements for equipment provided under this subcontract and perform preservation maintenance per equipment manufacturer's requirements. Performance of preservation maintenance shall be documented and records shall be provided to the CONTRACTOR at subcontract close out. Subcontractor shall be responsible for the means and methods to be used in the construction execution of the Task Order Scope of Work in accordance with the contract documents. All Tasks to be performed by the Subcontractor shall be authorized by a written Task Orders. Subcontractor shall provide the engineering design, fabrication, all labor and materials for the delivery, assembly, construction, and commissioning of the pre-engineered buildings and interior finishes. This included but not limited to the following tasks: Preliminary and detailed engineering design Procurement of building components, materials and equipment Excavation and backfill for foundations and under ground utilities Foundation placement Deliveries to site and off loading Construction and commissioning Facility internal office construction Supply concrete labor and materials HVAC, Relocate unit from T-14 Reuse duct work if possible Purchase and install Moisture Control Room Installation of utility services in an under buildings to a pre defined connection point 5 foot outside of building line Subcontractor shall be responsible for the procurement of all materials necessary for performing the work as identified per each task order Subcontractor shall perform the work professionally, in accordance with the manufacturers written and published installation instructions and in accordance with all requirements of the subcontract and recognized industry standards QUALITY ASSURANCE (QA) REQUIREMENTS Programmatic Quality Assurance requirements for subcontracts performed in the WTP Jobsite will be "NP" (non permanent or temporary work, generally no QA Program required), "CM" (commercial quality based the requirements in DOE Order 414.1C), or "QL" (nuclear level quality based on the requirements in ASME NQA-1 2000). Bechtel may require, as an element of bidder pre-qualification, submission of a representative sample QA Program or Table of Contents copy. For QL subcontracts, the successful bidder's QA Program must be approved prior to award of the subcontract. CODES (SAMPLE) - International Code Council (ICC), Uniform Building Code (UBC - International Code Council (ICC), International Building Code (IBC) - National Fire Protection Association (NFPA) 101, Life Safety Code - NFPA 30, Flammable and Combustible Liquids Code - NFPA 70, National Electrical Code - Uniform Mechanical Code (UMC) - Uniform Plumbing Code (UPC) - US Department of Energy (DOE) Orders STANDARDS (SAMPLE) BIDDER REGISTRATION AND PRE-QUALIFICATION American National Standards Institute (ANSI) American Society for Testing and Materials (ASTM) Builders Hardware Manufacturers Association (BHMA) Door and Hardware Institute (DHI) Gypsum Association (GA) Factory Mutual (FM) Hollow Metal Manufacturers Association (HMMA) International Firestop Council (IFC) Painting and Decorating Contractors of America (PDCA) Standards for Safety Laboratory Hoods and Cabinets (UL 1805) Scientific Equipment and Furniture Association (SEFA) Steel Door Institute (SDI) Underwriters Laboratories, Inc (UL) National Electrical Manufacturers Association (NEMA) Standards American Society of Heating, Refrigerating and Air-Conditioning Engineers (ASHRAE) Handbooks, Fundamentals, Application, Systems and Equipment BIDDER REGISTRATION AND PRE-QUALIFICATION Preliminary Pre-Qualification Requirements The BNI Acquisition Services Subcontracts group, is responsible for collection, evaluation, and internal publication of potential bidders' information for the purpose of pre-qualifying them to bid on any particular subcontract. As part of this process, BNI requires all potential offerors to register at the Supplier and Contractor Portal at: https://supplier.bechtel.com Prior to being considered for bidding on a Request For Proposal (RFP) for this WTP web posting opportunity, potential bidders must complete and submit the required forms located at http://www.hanfordvitplant.com/supplier_resources/qualification_process/ All information provided shall be strictly confidential. Registration All bidders must register with Bechtel National, Inc. for Work on the WTP Project. If your company has registered previously, then only supplemental information should be sent to the Bechtel National, Inc. representative noted below. Information to be provided by potential bidders must include: Dun and Bradstreet #: Company Name: Company Address: Contact Phone #: Contact Fax #: Contact Person: E-mail Address: Safety data and information Applicable work experience and Projects WTP BACKGROUND Information about the WTP Project can be found on http://www.hanfordvitplant.com CONTACT Bechtel National, Inc. 2435 Stevens Center Place Richland, WA 99354 Attn: Ousman Kinteh Tel. No. +1 (555) 000-0000 Email address: contact@example.gov Mailstop: MS14-3A

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS