Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from Texas was posted on January 29, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

General Construction or Installation Services

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238990
New
EBMUD – SD-462 – Secondary Reactors Rehab. – Phase 2
Solicitation # SD-462
The EBMUD Secondary Reactors Rehabilitation Phase 2 project, solicitation SD-462, is a comprehensive infrastructure project located at the Main Wastewater Treatment Plant in California. With an estimated contract value between 18.5 million and 19.5 million dollars, the scope of work involves the rehabilitation of open and covered concrete structures, the relining or replacement of small and large diameter steel and ductile iron pipes, and the installation of valves and piping appurtenances. Additional requirements include the operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, upgrades to instrumentation and electrical systems, replacement of motor control center components, and the installation of new slide gates and access platforms. The project also encompasses excavation, trench work, and surveying of reactor areas. This solicitation is issued by Ranger Pipelines Incorporated and is designated as a Small Business set-aside, encompassing SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone Small Businesses. The project seeks certified DBE, DVBE, and SBE subcontractors for specialized services including coating, concrete rehabilitation, electrical work, welding, and crane services. All subcontractors must comply with applicable state, county, and federal regulations. The bid opening is scheduled for December 2, 2026, at 2:00 PM.
Ranger Pipelines Incorporated

POSTED

about 7 hours ago

DEADLINE

in 12 days

AI Contract Overview

Show more

This subcontract agreement with the Dallas Area Rapid Transit in Texas involves the provision of general construction or installation services. The scope of work focuses on the execution of construction and installation tasks performed in strict accordance with provided technical drawings and specifications, contingent upon the activation of the construction component under a specific task order. The opportunity is categorized under NAICS code 238990 and was posted on January 29, 2026. Interested parties must submit their responses by the deadline of February 5, 2026.

General Info

Subcontract for Dallas Area Rapid Transit construction services; responses due February 5, 2026.

Documents

This scope was carved out of 2097765.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

MOTOR, WINDSHIELD WIPER, 12V, | 2097765

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • MAIN WASTEWATER TREATMENT PLANT SECONDARY REACTORS REHABILITATION,PHASE 2, SPECIFICATION SD-462Open now, due in 12 days
  • EBMUD – SD-462 – Secondary Reactors Rehab. – Phase 2Open now, due in 12 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyTexas → Dallas Area Rapid Transit
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Execution of construction or installation work in accordance with technical drawings and specifications if the 'construction' component of the SOW is activated under a task order.

More opportunities from Texas → Dallas Area Rapid Transit

Same awarding agency

NAICS: 541330
SLED
Trinity Railway Express (TRE) 2MT IH-35E Design
Solicitation # P-2096182
Dallas Area Rapid Transit is soliciting professional engineering design services for the Trinity Railway Express (TRE) Second Main Track (2MT) project in Dallas, Texas. The scope of work involves preparing construction documents for a 1.95-mile double track expansion from I-35E to the Mockingbird Lane grade separation. Key technical requirements include the replacement of the DART Rail bridge east of the former Mockingbird Bridge, the relocation of the historic Tresse Bridge, and the construction of new bridges over Inwood Boulevard and the Knights Branch and Noble Branch stream crossings. The design must adhere to specific rail parameters, including a 18.5-foot vertical clearance for the I-35E freight corridor and design speeds of 60 mph for freight and 79 mph for passenger rail. The project also integrates with the Harry Hines Boulevard Transportation Master Plan, involving various intersection layout alternatives to improve connectivity and safety for multimodal users. Deliverables include detailed design schematics, conceptual phasing plans, and technical specifications for steel and concrete materials. The winning bidder must sign a confidentiality agreement and ensure all personnel complete training on new bridge design and construction methods. This solicitation, numbered P-2096182, is not set aside for any specific small business category.
Engineering Services

POSTED

about 1 month ago

DEADLINE

in 19 days
View Details
NAICS: 333517
SLED
Wheel Press Machine Supply and Installation
Solicitation # 2099248
Dallas Area Rapid Transit (DART) is soliciting offers for the design, manufacture, delivery, installation, and testing of a turnkey computer-controlled, double-ended, horizontal-acting wheel press system with a minimum 600-ton pressing capacity. This equipment is intended for the maintenance of Kinkisharyo Light Rail Vehicles, specifically for mounting and demounting wheel hubs, journal bearings, and gearboxes onto axles. The system must be 100% nonproprietary, provide a minimum service life of 40 years, and be capable of at least five mount or demount operations per seven-hour shift by a single operator. The scope of work includes all necessary software, tooling, and training for DART employees. The procurement is a non-set-aside solicitation evaluated on a combination of technical acceptability (700 points) and cost/price (300 points). Proposals must be submitted electronically via the DART portal and are subject to a 100-page limit. Key requirements include compliance with Buy America/Build America (BABA) for offers exceeding $150,000, adherence to the Davis-Bacon Act, and the provision of performance and payment bonds. The contractor is responsible for all shipping costs and must ensure the equipment is delivered FOB DART Specified Destination. Acceptance is contingent upon successful Factory Acceptance Testing (FAT) and Site Acceptance Testing (SAT) and commissioning.
Machine Tool Manufacturing

POSTED

about 2 months ago

DEADLINE

in about 14 hours
View Details

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS