Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from Louisiana was posted on March 11, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

General Excavation and Site Preparation

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
20083
Solicitation # 20083
The City of Grand Rapids Department of Engineering is soliciting bids for improvements to the Richmond Park Playground in Michigan. The scope of work involves the removal of existing playground equipment and parking stops, and the installation of new site amenities. Key deliverables include the installation of specific playground equipment from Penchura, LLC (Design Number# PEN1185689-03), including a 2-5 structure, 5-12 structure, Folio Balance Climber, Footprint Stepper, and Footprint Wobble Bouncer. The project also requires the use of tamper-proof hardware for site furnishings and the use of Granular Material Class III to fill voids created during removal. All work must adhere to the City of Grand Rapids Standard Construction Specifications and ADA Standards for accessible design. The contract will be awarded based on the Engineer's estimate of quantities, with the City reserving the right to select a bidder other than the lowest if it is in the City's best interest. Bidders must provide a bid bond or cashier's check for at least 5% of the bid amount and submit a completed list of subcontractors and suppliers. Construction must begin within seven calendar days of contract execution, with a substantial completion date of August 1, 2027, and final completion by September 15, 2027. Final acceptance is contingent upon the closure of the LUDS permit, Water Department approval of curb stop boxes, and the completion of all punchlist items. A one-year warranty period follows final completion. There is no specified set-aside status for this solicitation.
City of Grand Rapids Department of Engineering

POSTED

about 4 hours ago

DEADLINE

in 22 days
NAICS: 237990
New
SLED
Shoreline stabilization, Twin Lakes, Calhoun County
Solicitation # 27-02-13-01
The Iowa Department of Natural Resources is soliciting bids for shoreline stabilization at Twin Lakes State Park in Calhoun County, Iowa, under contract number 27-02-13-01. The scope of work involves clearing and grubbing trees, shrubs, and brush, with tree removal specifically required between October 1 and March 31. Key deliverables include the placement of 398 tons of Class E Revetment field stone and 8 tons of beach armoring along 550 feet of shoreline, the installation of 132 linear feet of 8-inch corrugated HDPE pipe with two rodent guards, the placement of 50 boulders measuring at least 3'x3'x3', and the construction of a 50'x20' stabilized construction entrance. The project must adhere to current Iowa DOT Standard Specifications for Highway and Bridge Construction. This is a competitive quotation for a minor public improvement contract awarded to the lowest responsive and responsible bidder on a unit price basis. Bids must be submitted electronically to [email hidden] by 3:00 PM on December 10, 2026. The contractor is responsible for all labor, materials, equipment, and insurance, including a certificate of liability and property damage insurance. Performance bonds are required for contracts totaling $20,000 or more. Payment terms are set at 30 days from the receipt of an approved payment request, with the Department reserving the right to withhold up to 3% per Iowa Code Chapter 573. There is no set-aside status specified for this solicitation.
Department of Natural Resources

POSTED

about 6 hours ago

DEADLINE

in 17 days

AI Contract Overview

Show more

The St. Tammany Parish Government in Louisiana is seeking a subcontractor for general excavation and site preparation. The project focuses on general earthwork, grading, and site preparation to support drainage improvements along Cody Ln. The solicitation was posted on March 11, 2026, with a response deadline of March 31, 2026. This opportunity falls under NAICS code 237990 and there is no specified set-aside status for this contract.

Documents

This scope was carved out of 923456-26-7-1.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Cody Ln Drainage

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • ADVANCE NOTICE: Rail Modernization ProgramOpen now, due in 311 days
  • Imperial Irrigation District – East Highline ReservoirOpen now, due in 15 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyLouisiana → St. Tammany Parish Government
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
General earthwork, grading, and site preparation in support of drainage improvements along Cody Ln.

More opportunities from Louisiana → St. Tammany Parish Government

Same awarding agency

NAICS: 562219
SLED
Biosolids Transport and Disposal
Solicitation # 923456-26-35-1
The St. Tammany Parish Government is soliciting quotes for the transport and disposal of non-hazardous biosolids from the Cross Gates Sewage Treatment Facility and the Westwood Regional Wastewater Treatment Plant in Louisiana. The selected provider will be responsible for providing roll-off containers with liners, placing them adjacent to belt presses, and hauling the materials for disposal in Kiln, Mississippi. The estimated annual volume is approximately 1,500 tons for the Westwood plant and 500 tons for the Cross Gates facility, with hauling typically occurring weekly or as needed. The contract term is for one year, beginning January 1, 2027, through December 31, 2027, with an option to renew for two additional one-year terms. The contract will be awarded to the lowest monetary quote that is compliant with the request. Proposals must be submitted via certified mail, hand-delivery, or courier by December 8, 2026, at 2:00 p.m. Required documentation includes a pricing sheet, affidavits, and a corporate resolution for juridical entities. The provider must maintain comprehensive insurance, including business automobile liability, workers' compensation, and pollution and environmental liability. Compliance with LDEQ permits, the paint filter test, and various federal environmental and civil rights laws is mandatory. Invoices are submitted monthly and are payable within thirty days of approval.
Other Nonhazardous Waste Treatment and Disposal

POSTED

15 days ago

DEADLINE

in 15 days
View Details
NAICS: 237310
SLED
Mulberry Ave Drainage
Solicitation # 923456-26-36-1
The St. Tammany Parish Government is soliciting quotes for the Mulberry Ave Drainage project in Mandeville, Louisiana, with a response deadline of December 3, 2026, at 2:00 PM. The project requires a contractor with a Highway, Street, and Bridge Construction classification to provide all labor, equipment, and materials to improve drainage along Mulberry Ave. The scope of work includes removing and replacing subsurface drainage pipes, concrete driveways, and sod, as well as the installation of catch basins. All work must adhere to the latest Louisiana Standard Specifications for Roads and Bridges and the Manual on Uniform Traffic Control Devices. The project must be completed within 30 calendar days from the Notice to Proceed, and the contractor must maintain two-way traffic using flaggers and temporary signage during construction. The contract will be awarded to the lowest monetary quote that is in compliance with the request. Required submissions must be delivered via certified mail, hand-delivery, or courier in a sealed package. Key requirements include a performance and payment bond for projects costing $25,000 or more, adherence to ADA and Civil Rights Act compliance, and a sworn affidavit verifying the legal employment status of all employees. Final acceptance of the work is contingent upon the Parish's approval of the final estimate and the submission of accurate record drawings of the storm water drainage collection system.
Highway, Street, and Bridge Construction

POSTED

18 days ago

DEADLINE

in 10 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS