Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

Geospatial Surveying and As-Built Documentation

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract opportunity involves providing specialized geospatial surveying and as-built documentation services for prime contractors operating at Luke Air Force Base. The scope of work requires the recording of GPS coordinates for cable routes at 25-foot intervals as well as manhole and handhole lids. All geospatial data must be delivered as ESRI Shape files that are compatible with the Cyberspace Infrastructure Planning System and adhere to FGDC-STD-007.3-1998 standards. Managed by the Department of Defense under the 56 Cons Cc agency, this project is designated as a total Small Business Set Aside under NAICS code 541370. The contract was posted on October 7, 2026, with a response deadline of November 9, 2026. Final deliverables for the project include comprehensive as-built drawings and the required geospatial data files.

General Info

Geospatial surveying and as-built documentation for cable routes at Luke Air Force Base.

NAICS

541370 - Surveying and Mapping (except Geophysical) Services

Place of Performance

Luke Air Force Base, AZ, 85309, USA

Set-Aside

SBA

Documents

This scope was carved out of F3YCFA6173AC01.

The full solicitation package (6 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

56 CS FOC to Flightline and Wx Equipment, Luke AFB

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA4887 56 Cons Cc
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs geospatial surveying for prime contractors on Air Force base projects at Luke AFB. Records GPS coordinates for manhole/handhole lids and cable routes at 25-foot intervals. Creates ESRI Shape files compatible with the Cyberspace Infrastructure Planning System (CIPS) per FGDC-STD-007.3-1998. Delivers as-built drawings and geospatial data files.

Similar Contracts

Same NAICS industry code

More opportunities from Department Of Defense → FA4887 56 Cons Cc

Same awarding agency

NAICS: 335921
New
Federal
56 CS FOC to Flightline and Wx Equipment, Luke AFB
Solicitation # F3YCFA6173AC01
Solicitation F3YCFA6173AC01 is a firm-fixed-price contract set aside for small businesses under NAICS 335921. The project requires a contractor to engineer, furnish, install, and test new 12-strand single-mode fiber optic cable at Luke Air Force Base, Arizona. The installation will connect Radar Approach Control to several critical sites, including the Air Traffic Control Tower, Command Post, Base Operations, and various flightline equipment such as Localizers, Glide Slopes, TACAN, and GATR, as well as meteorological stations. The work involves utilizing both existing manhole/handhole duct systems and direct burial methods. The contractor must provide all new, rust-proof, and corrosion-resistant materials, labor, and equipment, as the government will provide no supplies. The period of performance is not to exceed 180 calendar days. Award will be based on the lowest priced, technically acceptable quote, with evaluations focusing on the installation design, a quality control plan, and past performance via the Supplier Performance Risk System. Key deliverables include as-built drawings, meeting minutes, and an OPSEC plan. Technical acceptance requires rigorous testing using Optical Time Domain Reflectometer and Optical Power Meter tests in accordance with TIA 526-7. Contractors must adhere to strict base access protocols, environmental guidelines regarding lead-based paint and hazardous materials, and utilize the Wide Area WorkFlow system for all invoicing and payments.
Fiber Optic Cable Manufacturing

POSTED

about 10 hours ago

DEADLINE

in about 1 month
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS