Geotechnical Borings by San Diego Unified Port District for Tenth Avenue Marine Terminal Redevelopment at Tenth Avenue Marine Terminal

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The San Diego Unified Port District is seeking geotechnical services at the Tenth Avenue Marine Terminal in San Diego, California, to support future redevelopment efforts. Scheduled for mid-2026, the project involves a 30-day operational period consisting of drilling five mud rotary borings (60-150 feet deep), ten hollow stem auger borings (10-30 feet deep), and 25 cone penetration tests (60-150 feet deep). All boring holes must be backfilled with cement-bentonite grout and patched to match existing site conditions. Equipment required for the project includes a CPT truck and a truck-mounted hollow stem auger drill rig with mud rotary capabilities. The project is categorized as exempt under CEQA Guidelines Section 15306 for information collection. Operational requirements include the temporary storage of soil cuttings and drilling mud in 55-gallon drums at the Harborside delivery waiting area for approximately 60 days. The contractor is responsible for compliance with all federal, state, and local laws regarding stormwater, hazardous materials, and construction demolition debris. Primary points of contact for the project are Capital Project Manager Damon Braden and Planner Justin Huitema.

General Info

Geotechnical investigations at Tenth Avenue Marine Terminal in 2026 using borings and CPTs, soil sampling, and restoration.

Agency

California → San Diego Unified Port District

Place of Performance

San Diego, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → San Diego Unified Port District
Contacts2 people available
OfficeN/A
Organization / Agency
California → San Diego Unified Port District
Office AddressN/A
Contacts
Damon BradenCapital Project Manager

Full Description

Show more
The proposed project would involve drilling, logging and sampling of geotechnical borings and cone penetration tests (CPT) by the San Diego Unified Port District (District) in the city of San Diego, California. The purpose of the proposed project is to perform tests and exploratory borings in support of the proposed future redevelopment of Tenth Avenue Marine Terminal (TAMT). Work to specifically complete the proposed project would involve drilling approximately five (5) mud rotary borings to a depth between 60-150 feet below ground surface with a 3–8-inch diameter, approximately ten (10) hollow stem auger borings to a depth between 10-30 feet below ground surface with an 8 inch diameter, and approximately 25 CPT throughout TAMT at a depth between 60-150 feet below ground surface with a 3 inch diameter. Soil cuttings and drilling mud generated during the work would be temporarily stored in 55-gallon drums for future sampling, screening and disposal, with drums being stored for approximately 60 days at a staging area at the Harborside delivery waiting area on the east end of TAMT. The boring samples would be transported to laboratories for analysis and testing offsite. The boring holes would be backfilled with cement-bentonite grout and patched at ground surface to match existing site conditions. At select boring locations, drilling duration would extend multiple days and steel plates would be used to cover the boring holes in between work. Overnight equipment would be staged temporarily at each boring location where it wouldn’t interfere with facility operations. Construction of the proposed project is anticipated to occur in mid-2026 and take approximately 30 days to complete geotechnical work, with drums being stored up to approximately 60 days at the staging area. Equipment to complete the proposed project would include a truck-mounted, hollow stem auger drill rig with mud rotary capabilities, CPT truck, support vehicles and associated geotechnical equipment. Due to its nature and limited scope, construction of the proposed project would generate a minor amount of vehicle trips and would require limited use of equipment. Therefore, impacts related to air quality, greenhouse gas emissions, and transportation and traffic are not anticipated to occur. Furthermore, the Applicant would be responsible for complying with all applicable federal, state, and local laws regarding construction demolition debris, hazards and hazardous materials, and stormwater.

Similar Contracts

Same NAICS industry code

NAICS: 541360
SLED
City of Norco 2050 General Plan Update Project
Solicitation # 2024110840
The City of Norco is undertaking the 2050 General Plan Update Project to establish a long-term vision for land use, development patterns, infrastructure planning, and resource conservation within the city's incorporated limits. The project focuses on preserving the rural, equestrian-oriented atmosphere of residential agricultural neighborhoods, supporting local businesses, and creating a prominent downtown identity. To comply with State Planning and Zoning Law, the update includes six mandatory elements: Land Use and Community Character, Circulation, Infrastructure and Facilities, Open Space and Conservation, Safety, and Noise. The plan incorporates goals and policies developed through community outreach to enhance public facilities, parks, and transportation safety. The project is managed by the Community Development Director, Colby Cataldi, with support from Meridian Consultants. A Program Environmental Impact Report has been developed to ensure compliance with CEQA guidelines, identifying a significant environmental impact regarding paleontological resources that requires specific mitigation. The project also mandates adherence to the Americans with Disabilities Act for pedestrian infrastructure and requires strict confidentiality regarding tribal cultural resources. Additionally, any construction activities involving soil disturbance must comply with NPDES General Permit requirements, including the development of a Stormwater Pollution Prevention Plan. The public review period for the draft environmental documents was scheduled from August 14, 2026, to September 28, 2026.
City of Norco

POSTED

8 days ago

DEADLINE

N/A
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS