Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Defense was posted on November 15, 2018. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Geotechnical Investigation, and Environmental 404 Sampling Access

Closed
W912EP-19-Z-0016Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
2026 AC Water Main Replacement
Solicitation # 2026-RFQ-042
Solicitation 2026-RFQ-042 is a request for qualifications from the City of Mercer Island Public Works department for professional engineering services to design water system upgrades. The project focuses on replacing approximately 5,000 linear feet of aging asbestos cement water mains with ductile iron mains along SE 40th St and E Mercer Way. The scope is divided into two phases: Phase 1 involves water system and PRV vault replacement on SE 40th St from Greenbrier Ln to 97th Ave SE, and Phase 2 extends the replacement to 97th Ave SE and the 3700 and 3800 blocks of East Mercer Way. Additional components for replacement include fire hydrants and water services. The design must comply with the Reduction of Lead in Drinking Water Act and the City of Mercer Island Standard Details Water. The project follows a goal-based timeline with bid-ready plans for Phase 1 due by Q2 2027 and Phase 2 by Q3 2027, with overall construction completion targeted for Q2 2028. Qualified firms must be licensed in the State of Washington and submit a Statement of Qualifications limited to 12 pages, including a proposed timeline and three references from the last five years. Selection is at the sole discretion of the City, and the awarded firm will negotiate a scope and fee schedule using the City's standard professional services agreement. Administration is managed by the City Manager, with payments issued via City warrant within 45 days of receiving a proper monthly invoice.
Public Works

POSTED

about 9 hours ago

DEADLINE

in 14 days

General Info

NAICS

541330 - Engineering Services

Place of Performance

Ca�o Mart�n Pe�a, FL, PRI

Set-Aside

SBA

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W074 Endist Jacksnvlle
Contacts2 people available
OfficeJACKSONVILLE, FL, 32207-0019, USA
Office AddressJACKSONVILLE, FL, 32207-0019, USA
Contacts
Gerald L. GarveyContract Specialist
Jesus LugoContracting Officer

Full Description

Show more
The U.S. Army Corps of Engineers, Jacksonville District is issuing this sources sought synopsis as a means of conducting market research to identify parties having an interest in and the resources to support this requirement for the Geotechnical Investigation, and Access for Environmental 404 Sampling, Ca'o Mart'n Pe'a. The project is scheduled to be awarded in early 2019. The result of this market research will contribute to determining the method of procurement. The applicable North American Industry Classification System (NAICS) code assigned to this procurement is 541330 the size standard is $15.0 million dollars. There is no solicitation at this time. This request for capability information does not constitute a request for proposals; submission of any information in response to this market survey is purely voluntary; the government assumes no financial responsibility for any costs incurred. The purpose of this synopsis is to gain knowledge of interest, capabilities and qualifications of various members of industry. The Government must ensure there is adequate competition among the potential pool of responsible contractors. Performance Work Statement: Background: The Ca'o Mart'n Pe'a (CMP) is a waterway approximately 4 miles long, connecting San Juan Bay and San Jos Lagoon, in metropolitan San Juan, Puerto Rico. It is part of the San Juan Bay Estuary (SJBE), the only tropical estuary that is included in the U.S. Environmental Protection Agency (EPA) National Estuary Program. The eastern 2.2-?mile-?long segment of the CMP and adjacent areas, including the San Jos Lagoon, are the focus of this restoration project. The western portion of the canal has been developed to serve as a waterway for small craft. The eastern portion of the canal has been significantly impacted by the encroachment of local urban development. The encroachment has occurred due to the disposal of household refuse, concrete and construction debris, automobile parts and furniture and household appliances which was subsequently capped with soil. As these filled areas were established, homes were constructed on them until the canal was gradually choked. The Ca'o Martin Pe'a Ecosystem Restoration Project (CMP-ERP) addresses the need to restore the natural hydraulic connection between the San Jos Lagoon and the San Juan Bay, which has been eliminated through years of backfilling, sedimentation, and other factors. The CMP-ERP is a key component of the Comprehensive and Conservation Management Plan for the San Juan Bay Estuary, and is necessary to restore fish habitat, species diversity, and overall health of the system. The restored conveyance of tidal flow through the Ca'o Mart'n Pe'a will decrease water residence time within the San Jos Lagoon, returning salinity and dissolved oxygen to more natural levels and restoring benthic habitat in several of the San Juan Bay Estuary water bodies. In addition to restoring connectivity in the estuary, mangrove habitat for aquatic invertebrates and other native species will be restored, providing important nursery grounds for commercial fish species such as snapper and grouper. The Ca'o Mart'n Pe'a Ecosystem Restoration Project is also critical for the revitalization of eight impoverished communities settled along the Mart'n Pe'a tidal channel, and restoration of this system will significantly improve human health and safety in the area by reducing residents contact with sewage contaminated floodwaters during major rain events. Recreational navigation will also be re-established in the area, allowing for increased public and commercial use of the entire estuary. Major Objectives: Find a company/contractor that can conduct geotechnical drilling over water/muddy soil in a forested wetland type environment. Equipment needed; a drill rig capable of drilling down to 65 feet mounted on amphibious platform for the geotechnical portion of the task. The contractor shall have the capability to clear and grub through the center of the canal for access. The contractor shall provide access for environmental 404 sampling as the initial task. The contractor shall coordinate with the 404 contractor through the COR to provide support for the 404 sampling on the amphibious equipment as the second task. The Government will use the amphibious equipment with the contractor to collect approximately 14-18 samples of sediment at a depth of -12 feet below water level. The 404 samples have a short holding time and must be collected in two weeks. A vibracore has been identified as optional equipment that may be needed. The Government currently has a 404 contractor on board with a vibracore device available. Project Objective: A subsurface investigation is needed for design and construction of the various features of the CMP-ERP. Phase II of the geotechnical investigation includes a general characterization of materials within the San Jose Lagoon areas that will potentially be dredged to access the CMP, and characterization of materials along the CMP canal alignment. The contractor shall provide access and coordination for the environmental 404 sampling. Collect twenty-two deep (-65 feet) soil borings (CB-CMP19-01 to CB-CMP19-22) located along the CMP alignment and, nineteen deep (-25 feet) soil borings (CB-CMP19-SJL-01 to CB-CMP19-SJL-19) located within the Laguna San Jos. GPS locations shall be recorded and reported for each boring. The tolerance for boring location shall be two (2) feet horizontal and 0.1 foot vertical, unless the otherwise stated. The USACE (Government), along with ENLACE (local sponsor), will assist in coordinating access of the drilling equipment to the boring locations with the contractor. The core borings shall consist of Standard Penetration Testing (SPT) and be drilled to the depths stated in the attachment, below the existing ground surface. Split spoon sampling shall be performed with continuous sampling starting from the ground surface level until boring termination depth. The blow count, ground water level, and soil descriptions shall be recorded. Photographs will be taken throughout the soil boring collection of the cores, including the sampling crew, the sampling location and cores. The proposed locations of the borings are shown on the attachment. Response Instructions: 1. Firm's name, address, point of contact, phone number, website, and email address. 2. Firm's interest in proposing on the solicitation when it is issued. 3. Firm's products that meet the specifications, interoperability, and support services. 4. Firm's Business category and Business Size -Other than Small, Small Business, other special classification such as 8a. All responses to this sources sought notice/market research will be evaluated and used in determining acquisition strategy. Submission Instructions: Interested parties who consider themselves qualified to perform the above-listed services are invited to submit a response to this Sources Sought Notice by 30 Nov 2018 at 1:00 PM. All responses under this Sources Sought Notice must be emailed to Gerald.L.Garvey@usace.army.mil and CC Jesse Lugo at Jesse.Lugo@usace.army.mil. Prior Government contract work is not required for submitting a response under this sources sought synopsis. You must be registered with the System for Award Management (SAM) in order to receive a Government contract award. To register go to www.sam.gov. If you have any questions concerning this opportunity, please contact: Gerald.L.Garvey@usace.army.mil.

More opportunities from Department Of Defense → W074 Endist Jacksnvlle

Same awarding agency

NAICS: 237990
New
Federal
PASS-A-GRILLE-PASS, MAINTENANCE DREDGING, PINELLAS COUNTY, FLORIDA
Solicitation # GROUP1-27-R-J001
Solicitation GROUP1-27-R-J001 is a total small business set-aside for maintenance dredging at Pass-a-Grille Pass in Pinellas County, Florida, issued by the U.S. Army Corps of Engineers, Jacksonville District. This firm fixed price task order is limited to contractors previously awarded under solicitation W912EP25R0010. The scope of work involves excavating material from the pass and transporting it to the Pass-a-Grille Beach Placement Area located north of the channel. Hopper dredging is strictly prohibited. Incidental requirements include environmental and water quality monitoring, beach fill quality control, tilling, vibration monitoring, and Munitions and Explosives of Concern construction support. The project has a price target range between $5,000,000 and $10,000,000, with a performance period of 120 calendar days following the Notice to Proceed, and work must commence within 60 calendar days of that notice. The government will utilize the Lowest Price Technically Acceptable process for award, evaluating offerors based on the technical acceptability and availability of their identified dredge and their past performance under the associated MATOC. Proposals must be submitted in PDF format via the PIEE Solicitation Module by 2:00 PM EST on November 20, 2026. Key compliance requirements include adherence to the Davis-Bacon Act, the provision of performance and payment bonds within 10 days of award, and the submission of qualified bird monitor credentials. Technical specifications require beach fill to be clean sand free of debris or toxic materials, with strict monitoring at both the borrow and placement areas to ensure quality standards are met.
Other Heavy and Civil Engineering Construction

POSTED

about 12 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
Federal
Palm Beach Harbor, South Jetty Rehabilitation 2026, Palm Beach County, Florida
Solicitation # W912EP26BA019
The US Army Corps of Engineers, Jacksonville District, is soliciting bids for the rehabilitation of the South Jetty at Palm Beach Harbor in Palm Beach County, Florida. This firm-fixed-price construction project, identified by solicitation number W912EP26BA019, has an estimated magnitude between $1,000,000 and $5,000,000. The scope of work involves substantial manipulation of new and existing stones to achieve required interlocking and the execution of concrete repairs. All mobilization and construction activities must be water-based using marine construction methods and equipment, as land-based access to the project site is strictly prohibited. The project has an estimated period of performance of 330 calendar days following the Notice to Proceed, which includes 60 days to commence work. Critical environmental and safety requirements include a mandatory pre-construction benthic community survey and the relocation of corals by Florida Fish and Wildlife Conservation Commission qualified contractors prior to the start of jetty work. The project adheres to EM 385-1-1 safety standards and requires the use of Coast Guard-certified equipment. Contractual terms include liquidated damages of $2,818 per calendar day of delay and a bid guarantee of 20 percent of the bid price or $3,000,000, whichever is less. This unrestricted procurement falls under NAICS code 237990, and all eligible offerors must be registered in the System for Award Management.
Other Heavy and Civil Engineering Construction

POSTED

4 days ago

DEADLINE

in 3 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS