Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

Geotechnical Investigation – Harbor Development Permit No. 25-032

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Port of Long Beach is seeking a geotechnical field investigation under Harbor Development Permit No. 25-032 to support the Russian Submarine Support project. The scope of work consists of approximately three soil borings and five cone penetration tests to collect critical subsurface data for engineering design and construction planning. The project is located at the Pier H Parking Lot in Harbor Planning District 9, Queensway Bay, Long Beach, California. This project is classified as a categorical exemption under the California Environmental Quality Act (CEQA) Guidelines Section 15306, Class 6, as it is limited to information collection and does not cause significant environmental disturbance. Administrative oversight is managed by the Port of Long Beach Harbor Department, with key points of contact including Amy Wong, Director of Environmental Planning, and Stephen Figueira, Senior Civil Engineer. The project was posted on July 28, 2025, and requires electronic submission via the State Clearinghouse CEQA Portal. No specific contract value, formal evaluation factors, or federal acquisition regulations are specified in the provided documentation.

General Info

Geotechnical investigation with three borings and five cone tests for Long Beach harbor project under CEQA Class 6 exemption.

Agency

California → Long Beach, Port of

NAICS

541360 - Geophysical Surveying and Mapping ServicesView NAICS

Place of Performance

Long Beach, CA

Set-Aside

NONE

Documents

(1)

Geotechnical Investigation CEQA Notice of Exemption 25-032

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Long Beach, Port of
Contacts2 people available
OfficeN/A
Organization / Agency
California → Long Beach, Port of
Office AddressN/A
Contacts
Stephen FigueiraSenior Civil Engineer
Amy WongEnvironmental Specialist Asst.

Full Description

Show more
Geotechnical field investigation consisting of approximately three (3) soil borings and five (5) cone penetration tests to support the City of Long Beach's Russian Submarine Support project.

Similar Contracts

Same NAICS industry code

NAICS: 541360
New
SLED
Cal Poly Master Plan 2035The California State Polytechnic University, San Luis Obispo is implementing the Student Success Center project as part of the Campus Master Plan 2035. This project involves the construction of a three-story, 36,000-square-foot building designed to house career advising, first-generation student services, and multi-purpose rooms. The facility will be located within the Academic Core on a 1.3-acre site currently occupied by the H4F surface parking lot, bounded by Truckee Road, Village Drive, North Perimeter Road, and Building 15. The project has an estimated cost of 69 million dollars and was approved via a Notice of Determination on July 23, 2025, confirming consistency with the Environmental Impact Report and CEQA mitigation measures. Beyond the main building, the scope includes the development of outdoor program spaces featuring gardens, integrated seating, and shaded areas for formal and informal use. Site improvements will include a new Mustang Shuttle and tram stop on Village Drive, secure bike and scooter parking, and two electric cart charging stations. To enhance campus connectivity and pedestrian safety, the project will add two ADA-compliant crosswalks and two ADA parking spaces on Village Drive. While the development results in the removal of approximately 90 surface parking spaces, a 2023 analysis indicates a campus-wide surplus of 1,000 spaces, offsetting the loss. Scott Bloom, the Campus Planner, serves as the primary point of contact for the project.
California State Polytechnic University, San Luis Obispo

POSTED

1 day ago

DEADLINE

N/A
View Details
NAICS: 541360
SLED
Vegetation Monitoring Survey and Report for the Napa County Flood Protection Project RFP
Solicitation # FDRFP20260908
The Napa County Flood Control and Water Conservation District is seeking proposals from qualified firms to perform a comprehensive vegetation survey and monitoring report for restoration areas associated with the Napa River Flood Protection Project. The selected contractor will analyze biological, chemical, and physical changes over time based on the Project Mitigation and Monitoring Plan and previous reports from 2017 and 2022. The scope of work involves a two-scale assessment consisting of high-resolution aerial photo interpretation to determine habitat types and extent, followed by ground-truthing to verify boundaries and document ecological parameters across seventeen vegetation monitoring transects and approximately one hundred ninety sample plots. This solicitation, identified as FDRFP20260908, was posted on September 8, 2026, with a response deadline of November 13, 2026. The project is managed by the Public Works agency in Napa, California, with Mark Snyder serving as the primary point of contact. All deliverables must adhere to ADA and Section 508 accessibility standards and comply with Government Code section 7550 regarding the disclosure of contract and subcontract amounts. The final monitoring report will use specific indicators to evaluate the biological and chemical responses to physical habitat modifications against established performance standards and restoration goals.
Public Works

POSTED

7 days ago

DEADLINE

in about 2 months
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS