This Subcontract opportunity from Florida was posted on March 26, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Geotextile Fabric Installation
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The City of St. Pete Beach is seeking a subcontractor to supply and install 2,000 square feet of geotextile fabric for soil stabilization behind the seawall, requiring adherence to proper seam sealing and anchoring techniques to ensure long-term structural integrity. The work must be completed in accordance with industry standards for erosion control and coastal reinforcement, with attention to durability and environmental compatibility under marine conditions. All materials and methods must meet the performance specifications implied by the project’s purpose, and execution must align with local engineering and regulatory requirements governing waterfront infrastructure. The contract is posted as a subcontract opportunity with a NAICS code of 238990, indicating it falls under other specialty trade contractors. The solicitation was posted on March 26, 2025, and responses are due by April 23, 2025. Interested parties must review the full details via the official bid link provided by the City of St. Pete Beach, Florida, to ensure compliance with technical, scheduling, and documentation requirements prior to submission. No set-aside designations are specified, making the opportunity open to all qualified subcontractors.
General Info
Place of Performance
FL, USASet-Aside
Documents
This scope was carved out of 87.
The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.
36th Avenue Seawall Repair - RFB
AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
This one is closed. Find the next one like it.
Open contracts like this one, right now:
- MAIN WASTEWATER TREATMENT PLANT SECONDARY REACTORS REHABILITATION,PHASE 2, SPECIFICATION SD-462Open now, due in 15 days
- PURIFIED WATER REPLENISHMENT SAN JACINTO VALLEY ADVANCED WATER PURIFICATION FACILITY SPECIFICATION NO. 1472WOpen now, due in 2 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Submission Closed
Organization & Contact Information
Full Description
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
