Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Georgia was posted on August 18, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

GGC J-449-DB, Building B-Roof Replacement

Closed
PE-47200-RFQ-2027-000000152State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238160
New
Inland Empire Job Corps-Request for Quote Roof Design & Build
Solicitation # inland-empire-job-corps-request-quote-roof-design-build
Management & Training Corporation is seeking quotes for a fixed-price design-build subcontract to construct an over-build enclosure for the lower roof of Building G at the Inland Empire Job Corps Center in San Bernardino, California. The project involves designing and installing a roof covering approximately 800 gross square feet, featuring a 3% sloped roof with a single ply, EPDM 60 mil roofing system over wood or metal decking. The scope includes structural framing that extends existing bearing walls or utilizes a new post-beam system, the installation of three LED strip light fixtures with one emergency backup, and strict adherence to OSHA safety standards and the Architectural Barriers Act Accessibility Standard of 2007. The total period of performance is 240 days, with a requirement to complete the work within 100 consecutive business days following the Notice to Proceed. Bids are due by November 2, 2026, and will be evaluated based on overall best value. This is a small business set-aside opportunity open to various SBA certifications. For bids equal to or greater than $25,000, a bid bond of 20% of the base bid is required, and the awarded contractor must provide performance and payment bonds from a surety with at least an A- rating. Bidders must conduct a physical site visit and sign an attendance roster to be eligible. The project is subject to Construction Wage Rate Requirements, necessitating compliance with California prevailing wages and the submission of weekly certified payroll reports. Additionally, all inspections and testing must be conducted by an independent, third-party agency registered in California. Required insurance minimums include 1 million dollars per occurrence for general liability, 1 million dollars for auto, and 500,000 dollars for workers compensation.
Inland Empire Job Corps

POSTED

about 6 hours ago

DEADLINE

in 5 days
NAICS: 238160
New
SLED
INDEX ROOF FLUID APPLIED ROOF
Solicitation # 27-350SOS-PHYSE-B-54721
The Illinois Secretary of State is soliciting bids for the installation of a new fluid-applied roof system on the Index Building located at 111 E. Monroe St, Springfield, IL. The project requires the application of a white, cold-applied, single-component silicone elastomer membrane designed for permanent weather and sunlight exposure. Key deliverables include the construction of a 100 square foot mock-up, the performance of a 72-hour flood test to ensure water resistance, and the provision of a 20-year manufacturer full labor and material warranty. The award will be granted to the responsive and responsible bidder who submits the lowest price. Bidders must submit all proposals electronically via BidBuy by November 19, 2026, and must provide a 10% bid bond. The contract requires adherence to strict material storage and delivery standards, including the use of original manufacturer containers and storage in weather-protected environments. Compliance with the State Prompt Payment Act, prevailing wage laws, and the Illinois Department of Human Rights Act is mandatory. Additionally, the total contract term, including all renewals and extensions, cannot exceed ten years. Vendors must provide a Certificate of Insurance naming the State as an additionally insured party and are responsible for all safety barricades and traffic signage during the project.
PHYSERV350 - Physical Services

POSTED

about 9 hours ago

DEADLINE

in 22 days
NAICS: 238160
New
SLED
Gatesville ISD Intermediate Campus Roof Repair
Solicitation # RFP2026-1030
Gatesville Independent School District is soliciting sealed proposals under RFP 2026-1030 for comprehensive roof repairs at the Intermediate campus, with an expanded scope via addendum to include a portion of the High School campus facility. The project requires a qualified contractor to provide all labor, supervision, equipment, and materials for a commercial roofing layover. Key technical specifications include the removal of existing gravel, installation of 2.2 inch ISO board for the main area and 1 inch ISO board for the addendum area, and the application of 60mil GAF-TPO or an equivalent system. The scope also encompasses the installation of ten GAF speedtite drains with 4 inch piping, tapered ISO boards at drains, steel deck system patching for caved-in areas, and the installation of proper flashing and pipe boots according to manufacturer specifications. The contract will be awarded based on a competitive solicitation process rather than low price alone, considering factors outlined in the Texas Education Code. Successful bidders must provide a five-year workmanship warranty, general liability insurance, and a standard manufacturer warranty. Proposers must submit a complete packet including mandatory certifications such as the SB 9 Criminal History Record, House Bill 89 Verification, and Senate Bill 252 Certification. All proposals must be submitted in sealed envelopes by October 30, 2026, at 2:30 p.m., with the final award scheduled for November 16, 2026. Bids must remain firm for 60 days following the award date.
GATESVILLE ISD

POSTED

about 12 hours ago

DEADLINE

in 1 day

AI Contract Overview

Show more

The Board of Regents of the University System of Georgia, on behalf of Georgia Gwinnett College, is soliciting design-build services for Project No. J-449, the Building B Roof Replacement in Lawrenceville, Georgia. The scope of work involves replacing the roof by adding a membrane layer over the existing panel system and installing decorative batten strips to maintain the original standing seam appearance. The project has an estimated construction cost of 2,940,000 dollars, with a Guaranteed Maximum Price estimated at 3,310,000 dollars. This is a two-step procurement process consisting of an initial Request for Qualifications and a subsequent phase for finalist interviews and fee proposals. Eligible firms must hold all necessary Georgia business and general contractor licenses, maintain a current ratio of 1.0 or higher, and have an Experience Modification Rate of 1.2 or less over the past three years. Required submission documents include a notarized certification form, a contractor affidavit for E-Verify compliance, and a proposer's disclosure statement regarding conflicts of interest. Finalists will be evaluated based on the relevant experience of their project team, their proposed management plan, and their ability to provide project solutions during interviews. All proposals must be submitted electronically via the designated portal by September 8, 2026, and must adhere to a 50-page limit with a minimum 11-point font.

General Info

Design-build services for Building B roof replacement at Georgia Gwinnett College by September 2026.

Place of Performance

GA, USA

Set-Aside

NONE

Documents

9

Exhibit C - Design Builder Fee Proposal for Project No. J-449

DOCX, High priority: read this first1 page · contract-document
High

Exhibit E - General Conditions Breakdown

XLSX, High priority: read this first3 pages · cost-breakdown
High

J-449 Building B Roof Replacement RFQ/Step II Fee Proposals

PDF, High priority: read this first15 pages · rfq
High

Exhibit A Certification Form for Project No. J-449

DOCX, Low priority1 page · certification-form
Low

Exhibit B Contractor Affidavit for Project J-449 Building B Roof Replacement

DOCX, Low priority1 page · contractor-affidavit
Low

Exhibit D - Preconstruction Cost and Expenses Breakdown

XLSX, Low priority1 page · exhibit
Low

Exhibit F - Project Cost Matrix for Project No. J-449, Building B Roof Replacement

XLSX, Low prioritycost-matrix
Low

Exhibit G Proposer's Disclosure Statement for Project No. J-449

DOC, Low priority1 page · proposers-disclosure-statement
Low

USG File Sharing Upload Instructions

PDF, Low priority4 pages · special-notice
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyBoard Of(university System of Georgia) Regents
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
Mr. Gary Johnson

Full Description

Show more
Design-Build Services for Project No. J-449-DB, Building B-Roof Replacement, Georgia Gwinnett College, Lawrenceville, Georgia. Please see the attached documents for project information and upload instructions. Questions about any aspect of the RFQ or the project should be submitted in writing to the contact listed above.

More opportunities from Board Of(university System of Georgia) Regents

Same awarding agency

New
SLED
UGA_BR-10-2702 DP Oglethorpe House Renovation
Solicitation # PE-47200-RFQ-2027-000000162
The Board of Regents of the University System of Georgia is soliciting design professional services for the renovation and modernization of Oglethorpe House, a nine-story residential facility encompassing approximately 93,538 square feet in Athens, Georgia. The project aims to address aging building systems and facility deficiencies while ensuring compliance with current life safety, accessibility, and operational standards. Key scope requirements include modernizing mechanical, electrical, and plumbing infrastructure, installing a fire command center, an emergency generator, and stairwell pressurization systems, as well as increasing the number of ADA-compliant rooms and providing a stretcher-compliant elevator cab. The estimated construction cost is 33.5 million dollars, with a design professional base fee of approximately 2.345 million dollars. The selection process is a multi-step evaluation following the State Construction Manual. Initial qualifications are weighted based on relevant project experience (45 percent), suitability for the project (30 percent), and firm stability (25 percent). Finalists will be interviewed and evaluated on team qualifications (50 percent), design methodology (25 percent), and communication skills (25 percent). Proposers must submit a PDF package not exceeding 50 pages to the BOR Egnyte platform by November 17, 2026, at 2:00pm. Required documentation includes notarized certification forms, a contractor affidavit for the Georgia Security and Immigration Compliance Act, and a proposer's disclosure statement. All designs must adhere to the campus master plan and the Energy Efficiency and Sustainable Construction Act of 2008, with Georgia Peach certification required during commissioning.

POSTED

1 day ago

DEADLINE

in 20 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS