Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Glass Bead Reflected Pavement Striping

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for the City of Pembroke involves the provision of pavement marking and striping services for prime contractors on various roadway projects. The scope of work includes the application of 6 inch double skip yellow centerline striping, single 6 inch skip yellow striping, 24 inch solid white stop bars, and crosswalk markings. All work must be performed in accordance with GDOT Detail T-11A and comply with GDOT Section 652 and Section 653, utilizing glass bead reflected paint and thermoplastic materials. The project focuses on delivering completed pavement markings across Mary Street and Payne Drive. This opportunity is categorized under NAICS code 238990. There is no specified set-aside status for this contract.

General Info

Subcontract for pavement marking and striping services on Mary Street and Payne Drive.

Place of Performance

GA, USA

Set-Aside

NONE

Documents

This scope was carved out of PE-66157-NONST-2026-000000016.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Mary Street Reconstruction

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Due in 27 days

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 3 documents on the prime contractFrom Mary Street Reconstruction
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyGeorgia → City of Pembroke
ContactsNo contacts available
OfficeN/A
Organization / AgencyGeorgia → City of Pembroke
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs pavement marking and striping for prime contractors on City of Pembroke roadway projects. Applies 6" double skip yellow centerline striping, single 6" skip yellow striping, 24" solid white stop bars, and crosswalk markings per GDOT Detail T-11A. Uses glass bead reflected paint and thermoplastic materials. Must comply with GDOT Section 652 and Section 653. Delivers completed pavement markings across Mary Street and Payne Drive.

Similar Contracts

Same NAICS industry code

NAICS: 238990
New
EBMUD – SD-462 – Secondary Reactors Rehab. – Phase 2
Solicitation # SD-462
The EBMUD Secondary Reactors Rehabilitation Phase 2 project, solicitation SD-462, is a construction effort located at the Main Wastewater Treatment Plant in California. The scope of work involves the rehabilitation of covered and open concrete structures, relining and replacement of steel and ductile iron pipes and supports, and the installation of valves and piping appurtenances. Additional requirements include the operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, upgrades to electrical and instrumentation systems, replacement of motor control center components, and the installation of slide gates and access platforms. The project also encompasses excavation, trench work, and surveying of reactors, with an estimated contract value between 18.5 million and 19.5 million dollars. This solicitation is set aside for Small Business (SB), including SBA certified Veteran Owned Small Business (VOSB), Service-Disabled Veteran Owned Small Business (SDVOSB), Women-Owned Small Business (WOSB), and HUBZone Small Business (HUBZone SB). The project is managed by Ranger Pipelines Incorporated, with a bid opening scheduled for December 2, 2026. Subcontractors must comply with all applicable state, county, and federal regulations, and the agency encourages the utilization of DBE, DVBE, and SBE certified firms through second-tier subcontracting or supply purchases.
Ranger Pipelines Incorporated

POSTED

about 3 hours ago

DEADLINE

in 12 days
View Details

More opportunities from Georgia → City of Pembroke

Same awarding agency

NAICS: 237310
New
SLED
Mary Street Reconstruction
Solicitation # PE-66157-NONST-2026-000000016
The Mary Street Reconstruction Project is a solicitation issued by the City of Pembroke, Georgia, for roadway and utility improvements located between Ledford Street and SR-119 in downtown Pembroke. The scope of work includes demolition, earthwork, grading, storm drainage improvements, waterline installation, roadway reconstruction, and pavement installation and striping. Additional requirements include centerline restriping for various city roadways, crosswalk striping on Payne Drive, and the construction of a concrete speed table on Patrick Street. The project is governed by the EJCDC C-700 Standard General Conditions of the Construction Contract (2007 Edition) and must comply with 2008 ADA Standards and Georgia Department of Transportation specifications. Sealed proposals must be submitted in duplicate in an opaque, sealed envelope to the City of Pembroke by 10:00 a.m. local time on December 16, 2026. The contract will be awarded to the lowest responsible bidder, provided they are prequalified via the Statement of Bidder Qualifications form. Bids must include a certified check or bid bond of at least five percent of the total bid amount, along with a Utility Certification and several required affidavits. There is no set-aside status for this solicitation. Performance and Labor and Material Payment bonds are required upon award, and the contractor must provide a construction schedule identifying milestones during the preconstruction conference.
Highway, Street, and Bridge Construction

POSTED

about 3 hours ago

DEADLINE

in 27 days
View Details

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS