Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

Glazing & Glass Installation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Place of Performance

Riverside, CA, 92507, USA

Set-Aside

NONE

Documents

This scope was carved out of 2026/27-06.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Exterior Painting At Emerson And Pachappa

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Riverside Unified School District
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supplies and installs glass and glazing systems for prime contractors on Riverside Unified School District facility projects. Installs glass panels, glazing beads, and sealants in accordance with the California Building Code (CBC). Delivers installed glazing systems.

Similar Contracts

Same NAICS industry code

NAICS: 238150
New
CBP5501 Bldg. 181 Door Replacement Services
Solicitation # CBP5501
Management & Training Corporation (MTC) is soliciting bids for a fixed-price, single lump sum subcontract to replace two commercial storefront door assemblies at the Building 181 Cafeteria of the San Diego Job Corps Center in Imperial Beach, California. The project scope includes all labor, materials, and equipment necessary for demolition, installation, and testing to improve facility security, accessibility, and weather resistance. The estimated contract value ranges from 0 to 25,000 dollars, with a performance period of 30 consecutive business days following a written Notice to Proceed. Bids are due by October 6, 2026, and must be submitted using the MTC Bid for Lump Sum Contract form, accompanied by a detailed cost breakout, a project schedule, and proof of insurance. A physical site visit and signature on the attendance roster are mandatory prerequisites for bid submission. Award decisions will be based on overall best value. For bids equal to or exceeding 25,000 dollars, a bid bond of 20 percent of the base bid is required, and the awarded contractor must provide Performance and Payment Bonds from a surety company with at least an A- rating. The contract is subject to the Davis-Bacon Act, requiring compliance with prevailing wage rates and the submission of weekly certified payroll. All work must adhere to federal, state, and local building codes, including the Americans with Disabilities Act and California accessibility requirements, specifically requiring 10-inch ADA bottom rails for medium-stile doors. Contractors must also provide a Unique Entity ID and self-certify their small business status under FAR 52.219-8. Final payment is contingent upon the approval of a Notice of Final Completion and the submission of all final payroll reports and lien releases.
San Diego Job Corps Center

POSTED

about 19 hours ago

DEADLINE

in about 23 hours
View Details
NAICS: 238150
New
SLED
PUBLIC ANNOUNCEMENT FOR Settles Gym Window Replacements-RFP-27-052
Solicitation # RFP-27-052
The Florida School for the Deaf and the Blind (FSDB) is seeking proposals under RFP-27-052 for the removal and replacement of block windows at the Settles Gymnasium (Building 17) on the FSDB Campus. The scope of work includes replacing twelve second-floor block windows in Room 201 and two first-floor block windows in Room 108 with aluminum storefront window units. Installation is scheduled to take place between February 15 and April 16, 2027. This procurement is governed by Florida Statutes section 255 and is intended to enhance the building's safety, functionality, and long-term performance. Qualified firms must be licensed in the State of Florida and registered in MyFloridaMarketPlace with a Substitute W-9 on file. Proposals are due by November 16, 2026, at 1:45 PM and must include one original signed copy, five copies, and one electronic version, all submitted in a sealed container with specific labeling. A bid bond of 5% of the contract value is required at the time of submittal, and the selected vendor must provide a 100% payment and performance bond. Insurance requirements include automobile liability coverage of $1,000,000 per occurrence. FSDB will award the contract based on the best value to the State, meaning the lowest bidder is not guaranteed the award. Evaluation will consider price, vendor responsibility, and technical capabilities, with the option for the agency to request Best and Final Offers. Mandatory submission elements include a title page, evidence of licensure, qualifications, and at least three references from the past three years. Failure to comply with packaging, labeling, or mandatory documentation requirements will result in the proposal being deemed incomplete and ineligible for evaluation.
Florida School for the Deaf and the Blind

POSTED

3 days ago

DEADLINE

in about 1 month
View Details

More opportunities from California → Riverside Unified School District

Same awarding agency

NAICS: 238320
New
SLED
Exterior Painting At Jefferson And Sierra
Solicitation # 2026/27-07
Solicitation 2026/27-07 is a public works project issued by the Riverside Unified School District for the complete exterior repaint of Jefferson Elementary School and Sierra Middle School in Riverside, California. With a construction cost estimate of 600,000 dollars, the scope of work includes all labor, materials, and equipment for surface preparation, patching, priming, and painting of all designated building and site surfaces. The project requires the removal and replacement of wall-mounted signage and strict adherence to RUSD standards and VOC compliance regulations. Performance is anticipated to begin on December 19, 2026, with a contract duration of 120 days. The contract will be awarded to the lowest responsive and responsible bidder based on the total cash purchase price. Bidders must be registered with the DIR and comply with California Labor Code prevailing wage requirements. Mandatory submission requirements include bid security, a California Contractor's license, and certifications regarding a drug-free workplace, asbestos-free materials, and background checks. Awarded contractors must provide separate performance and payment bonds equal to 100 percent of the contract amount. Quality will be measured against an approved 36 by 36 inch mock-up, and the contractor must ensure a minimum of 65 percent of nonhazardous construction waste is recycled or salvaged.
Painting and Wall Covering Contractors

POSTED

3 days ago

DEADLINE

in 17 days
View Details
NAICS: 238320
New
SLED
Exterior Painting At Emerson And Pachappa
Solicitation # 2026/27-06
The Riverside Unified School District is soliciting bids for solicitation number 2026/27-06 for exterior painting services at Emerson and Pachappa Elementary Schools in Riverside, California. With a construction cost estimate of 500,000.00 dollars, the project requires the contractor to provide all labor, materials, and equipment necessary for the application of exterior paint and coatings, including elastomeric coatings. The contract will be awarded to the lowest responsive bidder based on the total cash purchase price. Bidders must have attended a mandatory job walk on October 6, 2026, and must submit their proposals by October 20, 2026, at 10:00 AM to the District Purchasing Department. The selected contractor must adhere to strict quality standards, including the creation of an approved project mock-up and compliance with South Coast AQMD Rule 1113 for air quality. Performance and payment bonds for 100 percent of the contract amount are required, along with comprehensive insurance and adherence to California public works requirements, including prevailing wages and DIR registration. Personnel must pass fingerprinting and background checks to access school sites. The project includes a three-year manufacturer and contractor warranty for materials and application, with a five-year warranty specifically for elastomeric coatings. All project administration, including certified payroll and payment applications, must be managed through an internet-based electronic submittal service.
Painting and Wall Covering Contractors

POSTED

3 days ago

DEADLINE

in 15 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS