Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of The Interior was posted on July 20, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Z--GLCA LF WATER TANK LINE REPLACEMENT

Awarded
140P1526Q0068Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
The Building 262 Renovation project at the Federal Law Enforcement Training Center in Glynco, Georgia, is a single firm fixed price contract for the comprehensive interior modernization of Building 262, with potential options for Buildings 261 and 263. The scope of work includes replacing corridor and classroom flooring with composite modular materials, fully renovating restrooms with new vanities and lavatories, and updating interior surfaces through repainting and the removal of vinyl wall coverings. Technical upgrades involve installing raised flooring, updating electrical distribution with simple dimming controls and new ceiling fans, replacing variable air volume systems, and correcting plumbing deficiencies. The contractor is also responsible for providing new signage and managing the movement and protection of all loose furniture. The period of performance is scheduled from January 11, 2027, to March 11, 2028, with a total delivery timeline of 425 calendar days after the Notice to Proceed. Award will be determined using the best suited negotiate methodology, evaluating price alongside past performance and corporate relevant experience, with minimum ratings of Satisfactory and Acceptable required, respectively. The contractor must provide performance and payment bonds equal to 100 percent of the contract price and adhere to strict quality control, safety, and ADA accessibility standards. Proposals must be submitted electronically to the Contracting Officer by November 9, 2026, and must include a detailed bid schedule in Excel and technical documentation in PDF format.
Bristol Alliance of Companies

POSTED

about 6 hours ago

DEADLINE

in 12 days
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is for the repair and modernization of the Auto Maintenance Facility, Building 575, at Marine Corps Base Camp Lejeune, North Carolina. The project is estimated between 10 million and 25 million dollars with a performance period of 730 days after award. The comprehensive scope of work includes selective demolition, building envelope repairs, new roofing with a 20-year warranty, and exterior wall system updates. Interior improvements consist of reconfiguration, new finishes, epoxy mortar flooring, and the installation of a full NFPA-compliant fire suppression system. Infrastructure upgrades encompass new HVAC systems, exhaust extraction, compressed air systems, electrical distribution, lighting, low-voltage systems, and building automation controls. Additionally, the project requires site improvements including paving removal and replacement, drainage upgrades, and hazardous materials abatement. The contract is divided into two primary exhibit line items: ELIN 0001 for building renovation and ELIN 0002 for paving work. Award will be based on the lowest price, and bidders must propose on all line items to avoid rejection. Performance is subject to the Davis-Bacon Act and Buy American requirements. Bonding requirements are tiered, with proposals exceeding 150,000 dollars requiring bid, payment, and performance bonds. Quality control is managed through a three-phase process requiring a government-accepted QC Plan and adherence to various ASTM and NFPA standards. Administrative requirements include monthly invoicing via Wide Area Work Flow using NAVFAC Form 7300/30 and the submission of detailed monthly work-hour and safety reports.
Bristol Alliance of Companies

POSTED

about 6 hours ago

DEADLINE

in 26 days
NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for the Inland Empire Utilities Agency. This project, categorized under NAICS code 236220, focuses on basin improvements in California, specifically within the Riverside and Los Angeles project areas. The solicitation is designated as a set-aside for Disadvantaged Business Enterprises (DBE) as defined by the Department of Transportation. The response deadline for this opportunity is November 4, 2026. A critical component of this contract is the strict adherence to Disadvantaged Business Enterprise Good Faith Effort (GFE) requirements, which are expanded from State Water Resources Control Board standards to secure project financing. To avoid being deemed non-responsive, bidders must provide proof of specific actions within their bid package, including posting solicitations in an online publication for 30 consecutive calendar days, a print newspaper posting for at least one day, and documented utilization of the Small Business Administration and Minority Business Development Agency. While outreach documentation such as call logs or emails may be submitted up to three business days after the bid closing, failure to meet the primary posting and agency utilization requirements prior to the opening date will result in disqualification.
RT CONTRACTOR CORP

POSTED

about 6 hours ago

DEADLINE

in 6 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the development of a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. Comprehensive site improvements are required, including landscaping, parking, exterior lighting, telecommunications, mechanical and electrical utilities, and an underground stormwater retention system. An additional option for the P1016 facility includes the construction of a 17,978 square foot laboratory and the demolition of Building 1272T, a 548 square meter engineering facility. Pricing is requested across a wide range of scopes, including demolition, abatement, concrete, masonry, structural steel, mechanical, electrical, plumbing, and fire protection, among others. This is a small business set-aside solicitation subject to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive the formal bid invitation and documents via Building Connected. The response deadline for this solicitation is November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 6 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is a request for a single lump sum contract to perform multi-floor water damage restoration in Building 17 at the Grafton Job Corps Center in North Grafton, Massachusetts. Operated by Adams and Associates, Inc. for the U.S. Department of Labor, the project follows a fire sprinkler discharge that affected dormitory rooms, vanity areas, hallways, offices, and conference rooms across the first, second, and third floors. The scope of work includes architectural repairs such as drywall replacement and painting, ceiling tile and drywall ceiling repair, flooring replacement, rubber wall base installation, electrical repairs, and the replacement of vanities and cabinets. The total period of performance is 105 days, with substantial completion required within 90 days and final completion within an additional 15 days. This is an SBA set-aside opportunity open to Small Businesses, including certified VOSB, SDVOSB, WOSB, and HUBZone firms. Award will be based on best value, with evaluation weights assigned to price (60 percent), quality (20 percent), past performance (10 percent), and schedule (10 percent). Prospective bidders must attend a mandatory site visit on November 3, 2026, and submit proposals by November 17, 2026. Required submission documents include a detailed cost breakdown, a timeline for substantial completion, a 90-day bid guarantee, a W9, a completed vendor questionnaire, and proof of a valid Massachusetts Contractor's License. The contract is subject to the Davis-Bacon Act and specific Executive Orders regarding minimum wage and paid sick leave. Contractors must comply with OSHA safety regulations, NFPA-101 life safety codes, EPA regulations, and all applicable local and state building codes. Insurance requirements include automobile liability coverage of 200,000 dollars per person and 500,000 dollars per occurrence, with Adams and Associates, Inc. named as an additional insured. Payment terms are Net 30.
Grafton Job Corps

POSTED

about 6 hours ago

DEADLINE

in 19 days
NAICS: 236220
New
Springdale JCC –Dormitory Interior Renovation & Repairs
Solicitation # springdale-jcc-dormitory-interior-renovation-repairs
The Springdale Job Corps Center, operated by Career Systems Development Corporation for the U.S. Department of Labor, is seeking proposals for the interior renovation and repair of the North Wing dormitory in Troutdale, Oregon. The project focuses on restoring water-damaged areas, including residential rooms, bathrooms, common areas, and mechanical rooms, to return them to safe residential use. Key deliverables include the installation of drywall for approximately 300 square feet of floor area in mechanical rooms, the restoration of walls and ceilings, and the testing of restored mechanical, plumbing, electrical, fire/life-safety, and security systems. The contractor must provide a minimum one-year workmanship warranty and adhere to Center standards. This solicitation is a small business set-aside under NAICS 236220 and is subject to the Davis Bacon Act, requiring compliance with wage determination OR20260100, Modification 1. Awarded contractors must provide payment and performance bonding for the full project value, as well as proof of liability and worker's compensation insurance, within ten days of the award. Proposals must include detailed relevant experience, a comprehensive description of the proposed work and phasing, and itemized pricing that remains firm for 60 days. The project timeline is scheduled for completion between February 1st and March 31st, 2024, with a response deadline for the solicitation set for November 20, 2026.
Career Systems Development Corporation

POSTED

about 6 hours ago

DEADLINE

in 22 days

AI Contract Overview

Show more

This contract solicitation, numbered 140P1526Q0068, is for the replacement of the steel drinking water fill pipe on the elevated water tank at Lee’s Ferry within Glen Canyon National Recreation Area, managed by the National Park Service under the Department of the Interior. The effort is a Firm Fixed Price acquisition conducted under Simplified Acquisition Procedures per FAR Part 13, with a Total Small Business Set-Aside under NAICS code 236220, which has a size standard of $45 million, requiring all offerors to be certified small businesses. The period of performance is scheduled from September 1, 2026, through November 30, 2026, with performance to begin within 10 calendar days of notice to proceed and complete within 60 calendar days thereafter. The contractor must provide all labor, materials, tools, and equipment necessary to remove the existing pipe and install a new one, including the setup and operation of a temporary 12,000-gallon water storage and pressurization system with a sight tube, as well as providing site utilities and portable restrooms for personnel. All work must comply with industry standards and manufacturer specifications, performed by skilled personnel, and adhere to OSHA safety mandates including ANSI-compliant PPE, a site-specific Accident Prevention Plan, a spill response kit, and proper hazard and emergency protocols. All proposals must be submitted electronically via email to Jessica Owens, the Contracting Officer, no later than July 25, 2026, and must be formatted on 8.5 x 11-inch paper with accompanying SF1442 pricing schedules and a completed checklist as the first page. Pricing must be itemized, rounded to the nearest dollar, inclusive of all taxes and costs, and without alternatives. Evaluation will follow a best value approach, considering price, technical capability, and prior experience, with quotes reviewed in ascending price groups of three until a selection is made. The contract includes mandatory bonding: a Payment Bond required for awards over $35,000 and both Performance and Payment Bonds for awards exceeding $150,000, due within 10 days of award. Preconstruction submittals—including a construction schedule, accident prevention plan, product data sheets, and liability insurance documentation—must be submitted using NPS Form CM-16. The government retains full inspection rights at all times, and acceptance is final pending latent defects or

General Info

GLCA water tank line replacement under small business set-aside, response due July 17, 2026.

Contract Value

$173,600

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

AZ, USA

Set-Aside

SBA

Award Issued Date

Documents

3

140P1526Q0068 Amendment 0001

PDF, High priority: read this firstamendment
High

140P1526Q0068 Amendment 0002

PDF, High priority: read this firstamendment
High

Solicitation 140P1526Q0068 - Glen Canyon Lee's Ferry Water Tank Line Replacement

PDF, High priority: read this firstifb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

2 updates
PhaseAwarded
Posted

Solicitation

Notice updated

Response deadline changed from Jul 17, 2026 to Jul 22, 2026. The notice title changed.

Deadline changed

Response deadline changed from Jul 22, 2026 to Jul 25, 2026.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Imr ARIZONA(12400)
Contacts1 person available
OfficeFLAGSTAFF, AZ, 86001, USA
Office AddressFLAGSTAFF, AZ, 86001, USA

Full Description

Show more
GLCA LF WATER TANK LINE REPLACEMENT

More opportunities from Department Of The Interior → Imr ARIZONA(12400)

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS