Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on June 6, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Glenarm Power Plant Fountain Walkway Replacement

Closed
2024-IFB-LM-0234State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238990
New
SLED
Okaloacoochee Slough WMA Fence Line Project
Solicitation # FWC 26/27-25
The Florida Fish and Wildlife Conservation Commission is soliciting competitive bids for the Okaloacoochee Slough WMA Fence Line Project in Hendry County, Florida. The scope of work includes the removal of approximately 159,600 linear feet of barbed wire fence and the installation of approximately 56,400 linear feet of 4-strand barbed wire and 32,300 linear feet of 3-strand smooth wire. Additionally, the contractor must install 42 sixteen-foot gates and 45 three-foot pedestrian spring back gates, perform right-of-way vegetation clearing 50 feet interior of the fence lines, and complete fire line installation. The project has an estimated budget of 520,000 dollars and an initial contract term of four years, with work required to commence within 30 days of purchase order issuance. Bidders must be registered in the MyFloridaMarketPlace and SunBiz systems. Sealed bids are required by October 20, 2026, at 3:00 pm ET, and digital submissions are strictly prohibited. Award decisions will be based on the bidder's responsiveness and responsibility, with specific unit pricing required for fence removal, installation, clearing, and gates. The contractor is prohibited from subcontracting and must comply with various regulations, including the Build America, Buy America provision, Davis-Bacon Act wage standards for federally funded construction, and strict guidelines regarding the disturbance of wetlands and the prevention of non-native species contamination.
Florida Fish and Wildlife Conservation Commission

POSTED

about 7 hours ago

DEADLINE

in 3 days

AI Contract Overview

Show more

The contract involves the complete replacement of walkway paver stones at the Glenarm Power Plant fountain located at 2 East Glenarm Street, Pasadena, California. The scope requires furnishing all necessary labor, materials, equipment, transportation, disposal, and incidentals to install 5-inch thick, mesh-reinforced, integrally colored, stamped concrete in accordance with the technical specifications outlined in attachment A. The project is managed by the Water & Power Department’s Power Supply Business Unit of the City of Pasadena, with a contract value estimated between $50,000 and $150,000. The solicitation was posted on June 6, 2024, with a response deadline of July 1, 2024, and interested contractors are directed to submit their proposals through the designated procurement portal. Supporting documentation emphasizes the importance of bonding and compliance, including material and labor bonds that guarantee payment for labor, materials, and services under California Civil Code provisions, with signature requirements from principals, surety, and city officials. Bidders are also required to submit relevant experience forms demonstrating their past projects of similar scope, along with detailed subcontractor listings and shoring design information if applicable. These forms ensure the contractor’s capability and compliance with municipal codes, and they serve as part of the evaluation process to verify qualifications. Overall, the contract emphasizes adherence to technical specifications, bonding requirements, and demonstrated experience to ensure successful project completion at the specified location.

Documents

8
PDF, High priority: read this firstifb
High
PDF, High priority: read this firstdeclaration-of-noncollusion
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstcontract-document
High
PDF, High priority: read this first5 pages · past-performance
High
PDF, Low priority1 page · performance-bond
Low
PDF, Low priority1 page · bond-form
Low
PDF, Low priority1 page · subcontractor-listing
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Water & Power Department, Power Supply Business Unit
Contacts1 person available
OfficeN/A

Full Description

Show more
Furnish all necessary labor, materials, equipment, transportation, disposal, and incidentals to replace the existing walkway paver stones at Glenarm Power Plant fountain with 5-inch thick, mesh-reinforced, integrally colored, stamped concrete per attachment A job technical specification. The project is located at 2 East Glenarm St, Pasadena, CA 91105.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS