Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Glendale - Los Angeles Garden River Bridge

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Glendale - Los Angeles Garden River Bridge project is a pedestrian and bicycle bridge designed to span the Los Angeles River between the Cities of Glendale and Los Angeles, with the goal of enhancing connectivity to the Glendale Narrows Riverwalk and Griffith Park while improving safety for non-motorized users. The bridge will be a three-span, curvelinear structure with integrated landscaping, and construction is structured into five distinct phases beginning January 2026 and concluding March 2028, with each phase coordinating abutments, substructure, superstructure, and final architectural and landscaping elements. Performance is centered at the intersection of Flower Street and Zoo Drive along the Los Angeles River, with precise coordinates and parcel data identified for the project location. The lead agency, the City of Glendale, is responsible for oversight and administration, with Dennis Joe, Principal Planner, serving as the primary point of contact. The project is subject to rigorous environmental compliance under the California Environmental Quality Act and requires adherence to air quality, noise, and vibration thresholds established by SCAQMD, Caltrans, and Glendale Municipal Code, including limitations on emissions from construction equipment, which must meet CARB Tier 4 Interim standards. Special requirements include mandatory tribal cultural resource monitoring by the Gabrieleño Band of Mission Indians – Kizh Nation during all ground-disturbing work, with immediate work stoppage procedures if cultural artifacts or human remains are encountered, and coordination with the State Historic Preservation Office. Mitigation measures such as a 6-foot perimeter fence and the Workers Environmental Awareness Program, which trains construction personnel on environmental and cultural resource recognition, are embedded as operational conditions. Environmental documentation, including the Flora/Fauna Compendium, Special-Status Species Table, Site Photographs, and Jurisdictional Delineation Report, supports compliance, and proposal submissions must include both electronic and 15 hardcopy versions of summaries alongside a completed Notice of Completion Form, delivered to Sacramento’s State Clearinghouse by the February 17, 2026 deadline. No contract value, pricing structure, evaluation factors, or formal FAR clauses were provided in the documentation; however, the absence of specified payment offices, accounting data, invoicing systems, or designated COR/COTR/PCO personnel indicates the project likely operates under local procurement authority rather than federal acquisition regulations, despite the inclusion of federal environmental standards. All attachments and compliance conditions are tied to CEQA obligations, and no socioeconomic set-asides, offeror certifications, or federal

General Info

Glendale to build scenic pedestrian-bicycle bridge over LA River connecting to Griffith Park and Riverwalk by 2026.

Agency

California → City of Glendale

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Flower Street, Zoo Drive, CA, 91206

Set-Aside

NONE

Documents

(13)

Appendix E - Trip Generation Assessment for Glendale-Los Angeles Garden River Bridge

PDFtrip-generation-assessment

Notice of Determination for Glendale-Los Angeles Garden River Bridge

PDFnotice-of-determination

NOC Garden River Bridge Project Glendale-Los Angeles

PDFnotice-of-completion

NOI Glendale-LA Garden River Bridge Jan 2026

PDFspecial-notice

Glendale-Los Angeles Garden River Bridge Noise Analysis

PDFnoise-analysis

Glendale-LA Garden River Bridge Initial Study January 2026

PDFinitial-study

Appendix A Air Quality Greenhouse Gas Energy Assessment for Garden River Bridge Project

PDFenvironmental-assessment

Glendale-LA Garden River Bridge Mitigation Monitoring and Reporting Program

PDFmmrp

Appendix C Cultural Resources Assessment for Garden River Bridge Project

PDFcultural-resources-assessment

Caltrans Comment Letter on Glendale-Los Angeles Garden River Bridge Project

PDFcomment

Glendale - Los Angeles Garden River Bridge Project Summary

PDFenvironmental-summary

Appendix F Vehicle Miles Traveled Screening Evaluation Glendale-LA Garden River Bridge

PDFevaluation-report

Appendix B Biological Resources Report for Garden River Bridge Project

PDFbiological-resources-report

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Glendale
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Glendale
Office AddressN/A
Contacts
Dennis JoePrincipal Planner

Interested Companies (1)

Show more
RVA
Rancho Cucamonga, CA

Full Description

Show more
The Project proposes to construct a three-span, curvelinear, landscaped bridge across the Los Angeles (LA) River between the Cities of Los Angeles and Glendale for use by pedestrians and bicyclists. The intent of this multi-community resources is to increase access to Glendale Narrows Riverwalk and to Griffith Park, to improve connections, and to increase the safety of paths used for pedestrians and bicyclists.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
LACSD Surface Water PFAS Removal Project No. 251, CA
Solicitation # lacsd-surface-water-pfas-removal-project-no-251-ca
The contract involves the design and construction of PFAS treatment facilities at the Bernina and Cedar Glen Water Treatment Plants in California, encompassing comprehensive civil, structural, mechanical, electrical, instrumentation, and process improvements to remove per- and polyfluoroalkyl substances from surface water supplies. The project is solicited under the number LACSD Surface Water PFAS Removal Project No. 251 CA and is open to Disadvantaged Business Enterprises as part of a Department of Transportation set-aside initiative, aiming to promote equitable participation in infrastructure development. Work must be executed in accordance with federal and state regulatory requirements for water quality and environmental protection, with performance localized to the two treatment plant sites in California. Solicitation was posted on August 8, 2026, with responses due by September 3, 2026, and the North American Industry Classification System code 237310 applies, indicating it is a water and wastewater plant construction project. The contracting entity is Pyramid Building & Engineering, Inc., serving as both the organization name and agency, with primary contact for inquiries being John Garrison, reachable via phone or email. All proposals must align with technical specifications for PFAS removal technologies and integration into existing plant infrastructure, ensuring compliance with long-term water safety standards and operational reliability.
Pyramid Building & Engineering, Inc.

POSTED

about 4 hours ago

DEADLINE

in 25 days
View Details