Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Glenfeliz Boulevard Early Education Center (EEC) — Outdoor Classroom and Campus Upgrade

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Glenfeliz Boulevard Early Education Center campus upgrade project entails the transformation of the existing playground into a functional outdoor classroom with distinct activity areas, achieved through new paving, playground matting, landscaping, and the installation of one accessible play structure while removing three existing play structures with matting. Additional scope includes the installation of new HVAC units, roof replacement, exterior painting of the Children’s Center Building, and necessary upgrades to the fire alarm system and utilities. All work must comply with applicable local, state, and federal standards, including the Americans with Disabilities Act, the Division of State Architect, and the Department of Toxic Substances Control, and must adhere to Los Angeles Unified School District specifications, environmental guidelines under CEQA Sections 15301 and 15304, and SCAQMD Rule 1466 for construction waste and soil handling. The total approved budget for the project is $6,888,394, authorized by the Board of Education on October 22, 2024. Performance is limited to the project site at 3745 Dover Place in Los Angeles, California, with inspection and acceptance conducted on-site by the District. No formal contract number, solicitation details, line-item pricing, or procurement terms were provided, as the documentation reflects a project forecast and environmental exemption notice rather than a fully executed procurement contract. Oversight is managed by LAUSD personnel, including the CEQA Project Manager and CEQA Officer, with no contractor identification or subcontracting details included.

General Info

Glenfeliz Boulevard early education center upgrades playground, HVAC, roof, and fire system for $6.89M per LAUSD and ADA standards.

Agency

California → Los Angeles Unified School District

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Los Angeles, CA

Set-Aside

NONE

Documents

(1)

Glenfeliz EEC Outdoor Classroom and Campus Upgrade Notice of Exemption 20250728

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Los Angeles Unified School District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Los Angeles Unified School District
Office AddressN/A
Contacts
Bryan Ramos FernandezCEQA Project Manager

Full Description

Show more
The Project will provide an outdoor classroom by dividing the existing playground area into distinct activity areas with paving, new playground matting and equipment, and landscaping (Exhibit A). The Project will also provide new HVAC units, roofing, exterior painting of the Children's Center Building, as well as necessary upgrades to the fire alarm system and utilities. Three play structures with matting will be removed to accommodate the new outdoor classroom. New matting will be installed in one playground area along with a new accessible play structure. The Board of Education approved the Project‘s budget of $6.888,394 on October 22, 2024. Minor work will include improvements to ensure compliance with local, state, and federal requirements including those of the American with Disabilities Act (ADA), Division of State Architect (DSA), and Department of Toxic Substances Control (DTSC).

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # haleiwa-small-boat-harbor-maintenance-dredging-revetted-mole-repair
Healy Tibbitts Builders, Inc. is seeking small business subcontractors and suppliers for the Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair project in Hawaii. This firm-fixed-price contract, issued as an Invitation for Bid under NAICS code 237990, has an estimated value between 1 million and 5 million dollars. The scope of work includes mobilization and demobilization, the dredging and ocean disposal of 4,260 cubic yards of material, and revetted mole repairs involving stone rework, CRM wall repair, and vegetation removal. The period of performance is 200 calendar days from the date of the Notice to Proceed. The project requires strict adherence to USACE EM 385-1-1 safety standards and ASTM international standards for stone materials. Key personnel requirements include a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer, all of whom must be approved by the Contracting Officer. The contract includes a liquidated damages clause of 2,297 dollars per calendar day of delay. Award is based on a lowest responsive and responsible bidder selection process, with specific set-asides for various small business categories, including HUBZone, WOSB, and SDVOSB. Invoicing is conducted monthly, and the contractor must provide a detailed breakdown of pay items within 30 days of the Notice to Proceed.
Healy Tibbitts Builders, Inc.

POSTED

about 5 hours ago

DEADLINE

in about 2 months
View Details
NAICS: 237990
New
SBWRP Reverse Osmosis System
Solicitation # K-26-2469-DBB-3
Garney Pacific, Inc. is acting as the general contractor for the SBWRP Reverse Osmosis System project in San Diego, California, for the City of San Diego. With an estimated bid value of 19.3 million dollars, the project scope involves designing the removal of existing trailer-mounted Electrodialysis Reversal, slab-mounted Membrane Filtration, and Reverse Osmosis units. These will be replaced with new slab-mounted Membrane Filtration and Reverse Osmosis units to create a demineralization facility aimed at reducing total dissolved solids in reclaimed water. The solicitation, identified by bid number K-26-2469-DBB-3 and NAICS code 237990, seeks quotes for various trade services including HVAC, plumbing, electrical, concrete, pumping, crane services, aggregate, landscaping, painting, piping insulation, and demolition. The project emphasizes socioeconomic participation, specifically seeking SLBE and ELBE firms with DBE, MBE, WBE, or SBE certifications, and is open to various small business set-asides. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, though Garney will reimburse the bond premium. Contracting will be based on Garney Standard PO and Subcontract Forms, and any exceptions must be submitted as redlines with the quote. Proposals are due by August 27, 2026, at 2:00 PM PT.
Garney Pacific, Inc.

POSTED

about 5 hours ago

DEADLINE

in 13 days
View Details