Goleta Energy Storage Project Draft MND
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The Goleta Energy Storage Project has been amended to add up to 132 Tesla Powerpack 3 augmentation units to the existing 60 MW battery storage facility located at 6864 Cortona Drive in Goleta, California. These units are intended to offset natural battery degradation over time and ensure continued compliance with the power supply contract requirements of Southern California Edison, without increasing the site's nameplate capacity or physical footprint. The augmentation work will occur in phases over 120 days, using existing concrete pads with no new grading or land disturbance, and will involve minimal on-site personnel—no more than eight workers during peak construction or maintenance periods. The project remains fully unmanned during operations, relying on automated systems for daily functions and routine maintenance. Environmental compliance is maintained through adherence to the originally approved Initial Study and Mitigated Negative Declaration, with findings under California Environmental Quality Act (CEQA) Sections 15162 and 21166 confirming that the augmentation will not result in greater environmental impacts than previously analyzed. Permit conditions from Resolution No. 21-09, including those related to fire safety, stormwater management, noise, and hazardous materials, remain in full effect. The project’s design incorporates Lithium-Iron Phosphate batteries with integrated inverters, thermal management, and safety controls, all governed by a Battery Management System to mitigate failure risks. Installation follows strict architectural and lighting standards outlined in the original permit to maintain visual compatibility with the surrounding area. Inspection and acceptance occur on-site and are enforced by the City of Goleta, which serves as the lead agency overseeing CEQA compliance and permit conditions, while Tesla and Goleta Energy Storage, LLC are responsible for execution and maintenance. The project includes provisions for incremental capacity expansion over its 20-year lifespan, permitting additional units in groups of up to three per Megapack without requiring new environmental review, as long as impacts remain within the thresholds established in the 2021 IS/MND. There is no mention of federal contract clauses, procurement evaluation factors, cost estimates, payment terms, delivery specifications, or security clearances, as this document functions solely as an environmental addendum and municipal land use approval. Contract administration, including funding sources and invoicing methods, is not detailed in the materials, which focus entirely on regulatory compliance, design specifications, and operational continuity.
General Info
Agency
NAICS
Place of Performance
Cortona Drive and Hollister AVenue, Santa Barbara, CA, 93117Set-Aside
Timeline
Organization & Contact Information
Interested Companies (1)
Full Description
Similar Contracts
Same NAICS industry code