Goleta Energy Storage Project Draft MND

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Goleta Energy Storage Project has been amended to add up to 132 Tesla Powerpack 3 augmentation units to the existing 60 MW battery storage facility located at 6864 Cortona Drive in Goleta, California. These units are intended to offset natural battery degradation over time and ensure continued compliance with the power supply contract requirements of Southern California Edison, without increasing the site's nameplate capacity or physical footprint. The augmentation work will occur in phases over 120 days, using existing concrete pads with no new grading or land disturbance, and will involve minimal on-site personnel—no more than eight workers during peak construction or maintenance periods. The project remains fully unmanned during operations, relying on automated systems for daily functions and routine maintenance. Environmental compliance is maintained through adherence to the originally approved Initial Study and Mitigated Negative Declaration, with findings under California Environmental Quality Act (CEQA) Sections 15162 and 21166 confirming that the augmentation will not result in greater environmental impacts than previously analyzed. Permit conditions from Resolution No. 21-09, including those related to fire safety, stormwater management, noise, and hazardous materials, remain in full effect. The project’s design incorporates Lithium-Iron Phosphate batteries with integrated inverters, thermal management, and safety controls, all governed by a Battery Management System to mitigate failure risks. Installation follows strict architectural and lighting standards outlined in the original permit to maintain visual compatibility with the surrounding area. Inspection and acceptance occur on-site and are enforced by the City of Goleta, which serves as the lead agency overseeing CEQA compliance and permit conditions, while Tesla and Goleta Energy Storage, LLC are responsible for execution and maintenance. The project includes provisions for incremental capacity expansion over its 20-year lifespan, permitting additional units in groups of up to three per Megapack without requiring new environmental review, as long as impacts remain within the thresholds established in the 2021 IS/MND. There is no mention of federal contract clauses, procurement evaluation factors, cost estimates, payment terms, delivery specifications, or security clearances, as this document functions solely as an environmental addendum and municipal land use approval. Contract administration, including funding sources and invoicing methods, is not detailed in the materials, which focus entirely on regulatory compliance, design specifications, and operational continuity.

General Info

Add 132 Tesla Powerpack 3 units to existing 60 MW facility without expanding footprint or capacity.

Agency

California → City of Goleta

NAICS

541620 - Environmental Consulting ServicesView NAICS

Place of Performance

Cortona Drive and Hollister AVenue, Santa Barbara, CA, 93117

Set-Aside

NONE

Documents

(3)

Final Addendum to Goleta Energy Storage Project Final Mitigated Negative Declaration

PDFaddendum

Appendices_OCR

PDF

Notice of Determination for Goleta Energy Storage Project Amendment

PDFnotice-of-determination

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Goleta
Contacts3 people available
OfficeN/A
Organization / Agency
California → City of Goleta
Office AddressN/A
Contacts
Lisa PrasseCurrent Planning Manager
Selena WhitneyProject Manager
Paul ZavesoffVice President of Assest

Interested Companies (1)

Show more
ESA
Oakland, CA

Full Description

Show more
Full Title: Development Plan Amendment, Conditional Use Permit Amendment, and Addendum for the Goleta Energy Storage to add battery Augmentation Units ("GES Augmentation Units"); Case Nos. 24-0008-DP(AM) and 24-0003-CUP (AM). NOD associated with an Addendum to a previously approved IS/MND for a 60 MW battery storage facility. The Addendum analyzes the impacts of adding 132 battery augmentation units to the existing site over time. The augmentation units are necessary to maintain the energy goals of the project for the long term and meet the power supply contract requirements of SCE. The GES augmentation units will not have a more significant effect on the environment than previously identified in the adopted IS/MND. Further findings were made pursuant to PRC section 21166 and State CEQA Guidelines section 15162 relating to the subsequent environmental review The Amended Project includes the installation of up to 132 Powerpack 3 augmentation units. The Powerpack 3 augmentation units would be installed on existing concrete pads immediately adjacent to the existing Megapacks. The augmentation units would measure approximately 3.5 feet (43 inches) wide by 5.9 feet (71 inches) deep by 8.25 feet (99 inches) tall and would match the existing Megapack color. One Powerpack includes three independent battery modules. The installation of the 132 Powerpack units would occur in installments of up to 40 units placed at a time. Each installment would take place over a maximum of 30 days. Thus, the construction period for the Amended Project would occur in three to four phases, lasting up to 30 days each. The augmentation units would be necessary to maintain the energy goals of the project for the long term and meet the power supply contract requirements of Southern California Edison for the approved 60 MW facility. The augmentation units are required as part of the Capacity Maintenance Agreement between Tesla and the Property Owner. The installation of the augmentation units was previously contemplated for the Approved Project, but the units were not included nor analyzed in the Approved Project's CEQA review. The concrete pads required to support the augmentation units were part of the Approved Project and have been installed. Therefore, this current request involves City review and approval for placement of the augmentation units on the existing concrete pads located at the Approved Project site.

Similar Contracts

Same NAICS industry code

NAICS: 541620
New
Federal
PROJECT VA GWMP CLI-CULTURAL RESOURCE SURVEY
Solicitation # 693C7326Q000015
The contract is a Request for Quotation issued by the Federal Highway Administration’s Eastern Federal Lands Highway Division for the development of a Cultural Landscape Inventory for the Spout Run Parkway segment of the George Washington Memorial Parkway in Arlington, Virginia, covering approximately 46 acres bounded by the Memorial Parkway to the north, Interstate 66 to the south, the North Highland neighborhood to the east, and the Woodmont neighborhood to the west. The contractor must possess specialized expertise in cultural resource surveying and be capable of conducting technical analyses to produce a comprehensive final inventory that includes a narrative and graphic chronology of physical history, an integrity assessment, a condition evaluation, treatment recommendations, maps, GIS geodatabases, and supporting documentation adhering to National Park Service standards, including the NPS Cultural Landscapes Inventory Professional Procedures Guide (2025), the Secretary of the Interior’s Standards for Archeology and Historic Preservation, and the Chicago Manual of Style (18th Edition). All deliverables must comply with Section 508 accessibility requirements, be produced using NAD83 (2011) datum for GIS data, and follow the NPS Core Data Standards model, with final GIS layers requiring explicit approval by NPS GIS staff. The contract is firm-fixed price and requires itemized cost breakdowns for all tasks, including reimbursable travel expenses limited to GSA per diem rates for McCalla, Alabama, with receipts mandatory for airfare, rentals, and miscellaneous costs, and administrative expenses must detail actual hours and costs. Award will be determined based on best value rather than lowest cost, evaluating proposed methods and techniques, contractor qualifications and experience alongside price, with no small business set-aside and no formal weighting system provided. Contractors must maintain an active SAM registration with up-to-date UEI, CAGE, and tax information and affirm representations related to entity responsibility, non-inversion, tax compliance, and small business status. The contract incorporates unique clauses including a deviation of FAR 52.212-4 for commercial services, a requirement to comply with 52.222-90 prohibiting racially discriminatory DEI activities, and mandates for electronic invoicing through the DOT’s Delphi eInvoicing portal accessed via Login.gov, with a copy emailed to the FHWA COR. All work product becomes the sole property of the U.S. government, and contractors may retain only copies. Performance is required through December 30, 2027, with final government acceptance scheduled from August
693C73 Eastern Federal Lands Division

POSTED

about 12 hours ago

DEADLINE

in 4 days
View Details
NAICS: 541620
New
Federal
F107--Asbestos Baseline Survey Northern California VA Health Care System
Solicitation # 36C26126Q1100
The Department of Veterans Affairs, through its Network Contracting Office 21, is seeking information from contractors capable of performing an Asbestos Baseline Survey at the Northern California VA Health Care System under NAICS code 541620, with a small business size standard of $19 million. This is a sources sought announcement only, not a solicitation, and no binding commitments or payments are guaranteed. Responses must be submitted by email to Angela Gerlitzki no later than 10:00 a.m. EST on August 14, 2026, and must include the company’s legal name, SAM Unique Entity Identifier, socioeconomic status, certifications, capability statements, similar past projects, teaming or subcontracting plans complying with FAR and VAAR limitations, GSA contract number if applicable, and a completed price estimate. Participation requires current SAM registration and, for SDVOSB or VOSB firms, active certification in the SBA’s database. The anticipated period of performance is from September 8, 2026, to September 7, 2027, with the solicitation number 36C26126Q1100 to be referenced in all communications. All submissions will be used solely by the VA to inform future procurement decisions and will not be disclosed outside the government. Failure to provide all requested information will result in a non-responsive submission.
261-NETWORK Contract Office 21 (36C261)

POSTED

about 12 hours ago

DEADLINE

in 7 days
View Details
NAICS: 541620
New
SLED
Biological and Ecological Data Compilation & Literature ReviewThe contract involves compiling and analyzing existing biological surveys, species assessments, and scientific literature to evaluate natural resources at Camp Roberts and Camp San Luis Obispo, leveraging state and federal databases to ensure comprehensive data coverage. The work requires thorough review of historical and current ecological records to identify species occurrences, habitat conditions, and conservation concerns, with the goal of supporting land management decisions through accurate, synthesized information. The task is focused on data aggregation, interpretation, and reporting, emphasizing the integration of reliable sources to establish a robust baseline of biological resources at these military installations. The solicitation is posted as a subcontract under NAICS code 541620, which corresponds to environmental consulting services, and is issued by the California Military Department under the state of California. The response deadline is set for August 21, 2026, with the posting date appearing as August 6, 2026, indicating a short window for submission. The place of performance is specified as Kings, California, though no further address details are provided, and no point of contact information is included in the posting. The contract does not specify a set-aside type or organizational eligibility restrictions, and it is accessible through the CalE-Procure platform for interested parties to review and respond.
California Military Department

POSTED

1 day ago

DEADLINE

in 14 days
View Details