Goleta Energy Storage Project Draft MND

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Goleta Energy Storage Project amendment involves the installation of up to 132 Tesla Powerpack 3 lithium-iron phosphate battery augmentation units at the existing 60 MW facility located at 6864 Cortona Drive, Goleta, California. These units are required to maintain long-term energy goals and satisfy power supply contract requirements for Southern California Edison. The augmentation units will be placed on existing concrete pads adjacent to the Tesla Megapack 2XL cabinets and integrated via low-voltage electrical systems. Each unit measures 3.5 feet wide, 5.9 feet deep, and 8.25 feet tall, and must match the existing Megapack color. The project is managed by the City of Goleta and was approved by the Planning Commission on August 25, 2025, following an environmental review by Environmental Science Associates. The analysis concluded that the additions would not have a more significant environmental effect than previously identified in the original IS/MND. Construction is expected to last a maximum of 120 days, divided into three to four phases of up to 30 days each, with units installed in installments of up to 40 at a time. The project has an estimated 20-year operational lifetime and must remain compliant with the City's Community Noise Equivalent Level threshold, with a requirement for noise reduction measures if post-installation surveys indicate exceedances.

General Info

Add 132 Tesla Powerpack 3 units to existing 60 MW facility without expanding footprint or capacity.

Agency

California → City of Goleta

NAICS

541620 - Environmental Consulting ServicesView NAICS

Place of Performance

Cortona Drive and Hollister Avenue, Goleta, CA, 93117

Set-Aside

NONE

Documents

(3)

Final Addendum to Goleta Energy Storage Project Final Mitigated Negative Declaration

PDFaddendum

Appendices_OCR

PDF

Notice of Determination for Goleta Energy Storage Project Amendment

PDFnotice-of-determination

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Goleta
Contacts3 people available
OfficeN/A
Organization / Agency
California → City of Goleta
Office AddressN/A
Contacts
Lisa PrasseCurrent Planning Manager
Selena WhitneyProject Manager
Paul ZabesoffVP Asset Management

Interested Companies (1)

Show more
ESA
San Francisco, CA

Full Description

Show more
Addendum to a previously approved IS/MND for a 60 MW battery storage facility. The Addendum analyzes the impacts of adding 132 battery augmentation units to the existing site over time. The augmentation units are necessary to maintain the energy goals of the project over the long term and meet the power supply contract requirements of SCE. The GES augmentation units will not have a more significant effect on the environment than previously identified in the adopted IS/MND. Further findings were made pursuant to PRC section 21166 and State CEQA Guidelines section 15162 relating to subsequent environmental review.

Similar Contracts

Same NAICS industry code

NAICS: 541620
New
SLED
DEP-BWR-NOI-FY27-M36 Grant ANNOUNCEMENT ONLY
Solicitation # BD-27-1045-BWR00-BWR01-133675
The Massachusetts Department of Environmental Protection (MassDEP) is soliciting interest from Public Water Supplies and municipalities with Water Management Act (WMA) permits or registrations to receive a free American Water Works Association (AWWA) M36 water audit. The program is designed to help entities identify water loss objectives, particularly those failing to meet the Unaccounted-for Water (UAW) performance standard of 10 percent or less. Depending on previous audit history and data validity scores, eligible participants can receive either a Top-Down Audit or a Bottom-up Component Analysis. MassDEP will hire a private consulting firm through a separate public procurement process to conduct these audits. Selection is based on criteria including high UAW rates, WMA allocation status, recent improvement efforts, and permit status, with priority given to WMA permit holders and projects benefiting disadvantaged communities. Participation is limited to entities in compliance with the MBTA Communities Act Law. Selected applicants must provide a written commitment to have detailed system information for 2025 or 2026 available by January 15, 2027, and submit that data by February 2, 2027. Additionally, participants must commit significant personnel time as an in-kind match and be prepared to enter into a contract within 15 to 30 days of the grant award. Responses to this Request for Interest are due by October 21, 2026.
BWR00 - Bureau of Water Resources

POSTED

about 14 hours ago

DEADLINE

in 29 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS