Goleta Water District - La Paloma Blow Off Abandonment

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Goleta Water District is proceeding with the abandonment of an exposed blow-off valve located along a dirt access road near Cathedral Oaks and Foothill Road in Goleta, California, following damage sustained during February 2024 storms. The work involves the safe removal of the valve and permanent capping of the associated pipeline to prevent potential uncontrolled water release caused by flooding or falling trees, which could compromise water storage capacity and harm the surrounding environment. The project is classified under CEQA Section 15302(c) as a categorical exemption for the replacement or reconstruction of an existing utility system, indicating compliance with California environmental review requirements without the need for extensive environmental documentation. The place of performance is clearly defined at the valve site in Goleta, and inspection and acceptance will occur at the project location. No formal contract value, pricing details, or line-item costs are included in the available documentation, and the transaction is referenced as a forecast rather than a formal solicitation or binding contract. The Goleta Water District serves as the procuring entity, with Daniel Brooks, Engineering & Infrastructure Manager, designated as the primary point of contact and David Matson, General Manager, listed as the signing authority. No federal acquisition regulation clauses, contract administration data such as payment offices or COR assignments, evaluation factors, packaging requirements, or representational certifications are present, reflecting a locally administered, low-complexity infrastructure upgrade focused solely on safety and system integrity. The project identifier is GWD Project No. 24-4815, with no formal solicitation or contract number assigned, and no submission deadlines or proposal format instructions are specified, suggesting an internal or direct award process.

General Info

Goleta Water District safely removes and caps damaged valve to protect water system and environment.

Agency

California → Goleta Water District

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

Goleta, CA

Set-Aside

NONE

Documents

(1)

Goleta Water District La Paloma Blow Off Abandonment NOE

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Goleta Water District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Goleta Water District
Office AddressN/A
Contacts
Daniel BrooksEngineering & Infrastructure Manager

Full Description

Show more
Goleta Water District (District) owns and operates a blow-off valve located along a dirt access road near Cathedral Oaks and Foothill Road. The proposed work involves removing the existing blow-off valve and capping the pipeline, which became exposed during the February 2024 storms. If left unaddressed, the exposed valve is vulnerable to damage from potential flooding or falling trees, which could result in the uncontrolled release of water and negatively impact water storage and the surrounding environment.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Hagerstown Wastewater Treatment Plant Improvements - Phase 1
Solicitation # hagerstown-wastewater-treatment-plant-improvements-phase-1
The Hagerstown Wastewater Treatment Plant Improvements - Phase 1 project, managed by Carl Belt, Inc., focuses on upgrading aging infrastructure in Maryland to ensure compliance with nitrogen and phosphorous limits and NPDES thermal requirements. The scope of work includes the replacement of influent screens, washer compactors, in-plant pumps, and RAS pumps, as well as the addition of a WAS pump to Final Clarifier No. 1. Key structural and electrical improvements involve installing a building to enclose the headworks, constructing a dedicated building for a new chemical storage tank, replacing motor control centers, PLCs, and switchgear, and repairing concrete at the headworks. Additional tasks include modifying primary sludge pump discharge piping, adding a nitrate probe to BNR basins, and performing various building repairs to the roof, HVAC, and windows. This is a wage-rated solicitation with a response deadline of August 17, 2026, at 4:00 PM. The project strongly encourages participation from small businesses, including SDB, WOSB, HUBZone, and veteran-owned concerns, and specifically seeks MBE, DBE, and WBE participants for various electrical, mechanical, and masonry subcontracts, as well as specialized suppliers for wastewater pumps and sluice gates. Bids and detailed plans are managed through the Carl Belt, Inc. website, with primary administrative contact provided by Jared Burkett.
Carl Belt, Inc.

POSTED

about 5 hours ago

DEADLINE

in 3 days
View Details
NAICS: 237110
New
Cypress Lake WTP, Wellfield, & Raw Water Main in Osceola County, FL
Solicitation # cypress-lake-wtp-wellfield-raw-water-main-osceola-county-fl
Wharton-Smith, Inc. is soliciting proposals from State of Florida Certified Disadvantaged Business Enterprise (DBE) subcontractors and suppliers for the Cypress Lake WTP, Wellfield, and Raw Water Main project in Osceola County, Florida. This project, owned by the Central Florida Water Cooperative, has an estimated value of 270 million dollars. The scope of work is extensive, involving the construction of raw water production wells, well heads, well pumps, discharge piping, and a surge bladder tank. Additional requirements include site civil work, a wellhead cage, an electrical building, a standby generator, and the construction of several specialized facilities, including Operations and Reverse Osmosis buildings, a Pretreatment Chemical Building, a Post-Treatment Chemical Building, a Post-Treatment Degasification System, and an Odor Control Air Exhaust Dispersion Stack System. The project also requires production well disinfection and primary and secondary water quality analytical laboratory testing to achieve regulatory certification. Bidding documents are available for free download via ConstructConnect. Interested parties must submit their proposed scope of work at least 24 hours before the bid date, with firm pricing due by 10:00 AM on the day of the bid. The final bid deadline is August 19, 2026, at 2:00 PM EST. Proposals should be emailed to Nichole Voitel at watergmpbids@whartonsmith.com. Wharton-Smith, Inc. has indicated a willingness to review responsible quotes and negotiate terms where appropriate.
Wharton-Smith, Inc.

POSTED

about 5 hours ago

DEADLINE

in 5 days
View Details