Grangerland Meadows Section 2 Water, Sanitary, Drainage, & Paving

Active
6aabf34bb60091add8bb877dState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Grangerland Meadows Section 2 Water, Sanitary, Drainage, and Paving project, managed by Spear Point Engineering in Texas, involves comprehensive infrastructure installation and roadwork in Willis. The scope of work includes the installation and adjustment of waterlines, sanitary sewers, and storm sewers, along with their respective valves, manholes, and appurtenances. The contractor is responsible for performing all specified testing on installed lines to ensure operational integrity. Additionally, the contract requires the preparation of paving subgrades and the installation of road paving in accordance with project plans and specifications, including all necessary laboratory testing. The contractor must repair any affected existing pavement, furnish all subsidiary items required for completion, and perform a final clean-up of the project area. Responses for this solicitation are due by October 1, 2026.

General Info

Infrastructure installation and roadwork for Grangerland Meadows in Texas, due October 1, 2026.

Agency

Texas → Spear Point EngineeringView Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

Willis, TX, 77378, USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyTexas → Spear Point Engineering
Contacts1 person available
OfficeN/A
Organization / Agency
Texas → Spear Point Engineering
View Agency Profile
Office AddressN/A

Full Description

Show more
Major items of construction and services required are designated as follows: Install and adjust waterlines, valves, valve boxes, flushing valves, and appurtenances. Construct and adjust sanitary sewer, manholes, and appurtenances. Install and adjust storm sewer, manholes, and appurtenances. Perform testing as specified on installed lines. Prepare paving subgrade according to plans and specifications and perform all required laboratory testing on subgrade. Install road paving according to plans and specifications and perform all required laboratory testing on pavement. Repair any existing pavement affected. Furnish and install all subsidiary items as necessary to complete the project. Clean-up project area upon completion.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project in Highland, California, is a comprehensive infrastructure initiative managed by James W. Fowler Co. for the Metropolitan Water District of Southern California. The scope of work involves the furnishing and installation of approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project includes the installation of various contractor-furnished and Metropolitan-furnished valves ranging from 54 to 132 inches, as well as tie-ins between 54 and 145.5 inches. Additional construction requirements include four surge tanks, two valve vaults, an air compressor yard structure, drainage improvements, electrical upgrades, instrumentation and controls, and associated piping systems. The project also encompasses critical civil and site work, including the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. This solicitation is open to small businesses, including SBA-certified service-disabled veteran-owned small businesses, minority business enterprises, and women business enterprises. James W. Fowler Co. provides specific support for M/W/DBE subcontractors, including assistance with bonding, insurance, lines of credit, and the procurement of equipment and materials. Bids are due by September 29, 2026, with all negotiations required to be finalized 24 hours prior to the bid opening.
James W. Fowler Co.

POSTED

about 2 hours ago

DEADLINE

in 8 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS