Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

Granite Lakes Estates

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Rocklin is implementing the Monument Springs Drive Roadway Improvements Project, which involves closing an approximate 1,000 foot roadway gap from the existing terminus at Greenbrae Road to Hidden Glen Drive. A central component of this project is the construction of a full-span bridge over Secret Ravine, designed to align with the existing grade of Monument Springs Drive and maintain three feet of freeboard above the post-development 100-year floodplain. This effort is a modification of the conditions of approval for the Granite Lakes Estates project, which originally encompassed 119 single family lots across four phases. The project area of direct impact is approximately 5.04 acres within a broader 80 acre site located in the southeast area of Rocklin, California. The project is governed by the California Environmental Quality Act, with a Notice of Determination issued in July 2025 following a second addendum to the Final Environmental Impact Report. This environmental review included comprehensive technical reports on biological resources, arborist assessments, and hydraulic studies to ensure the bridge design and roadway extension meet safety and environmental standards. Compliance requirements include the implementation of siltation and erosion control programs approved by the City Engineer and annual water quality testing at detention basins and ponds conducted by qualified professionals. Oversight is provided by the City of Rocklin Public Works department to ensure all construction activities adhere to the adopted mitigation measures and monitoring plans.

General Info

Rocklin to extend Monument Springs Drive with bridge over Secret Ravine Creek, meeting environmental, cultural, and stormwater standards by 2024.

Agency

California → City of Rocklin

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Monument Springs Drive and China Garden Road, Rocklin, CA, 95677

Set-Aside

NONE

Documents

(2)

City of Rocklin Monument Springs Drive Notice of Determination July 2025

PDFnotice-of-determination

Monument Springs Drive Roadway Improvements Project - Second Addendum to Final EIR

PDFenvironmental-impact-report-addendum

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Rocklin
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Rocklin
Office AddressN/A
Contacts
David MohlenbrokDirector

Full Description

Show more
The City proposes an approximate 1,000 foot-long roadway gap closure on Monument Springs from the existing terminus at Greenbrae Road to Hidden Glen Drive. The Project includes construction of a full-span bridge over Secret Ravine as part of the roadway extension, which would be constructed to meet the existing grade of Monument Springs Drive and provide three feet of freeboard above the post-development 100-year floodplain.

Similar Contracts

Same NAICS industry code

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS