Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Grant Line Road Roundabouts Project

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Grant Line Road Roundabouts Project, led by the City of Mountain House in Alameda County, involves the construction of roundabouts at two key intersections along West Grant Line Road: one at Altamont Pass Road and another at Mountain House Road. The primary objective is to reduce excessive queuing and traffic delays, though the designs are not intended to accommodate future forecasted traffic volumes. The project requires the acquisition of additional road right-of-way and formal approvals from both the City and Alameda County. Technical specifications for the Altamont Pass Road intersection include a 53-foot diameter roundabout with a 13-foot truck apron, a 16-foot wide asphalt travel lane, and the installation of a 270-foot concrete median on the westbound approach. Environmental compliance is a critical component of the project, as it is subject to the California Environmental Quality Act and requires permits from the USFWS, CDFW, and the Army Corps of Engineers due to the proximity of Mountain House Creek. Strict construction mandates include scheduling work during the dry season, prohibiting activity during significant rain events, and maintaining refueling areas at least 100 feet from the creek. Additionally, the project must address risks associated with previously abandoned oil and gas wells as advised by CalGEM and implement specific mitigation measures for traffic hazards and tribal cultural resources. Public review of the Draft Environmental Impact Report was conducted between September 19 and November 3, 2025.

General Info

City of Mountain House to build two roundabouts with strict environmental protections and no future traffic growth design.

Agency

California → City of Mountain House

Place of Performance

West Grant Line Road & Altamont Pass Road/West Grant Line Road/Mountain House Road, CA, 95391

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → City of Mountain House
Contacts2 people available
OfficeN/A

Interested Companies (1)

BaseCamp EnvironmentalLodi, CA

Full Description

Show more
The project proposes to construct roundabouts at two intersections along West Grant Line Road. One would be installed at the intersection of West Grant Line Road and Altamont Pass Road; the other would be placed at the intersection of West Grant Line Road and Mountain House Road. The roundabouts are designed to ameliorate excessive queuing and delays that currently exist at both intersections; they are not intended to accommodate any future forecasted traffic volumes. Both roundabouts would require the acquisition of additional road right-of-way, as existing right-of-way is inadequate to accommodate these facilities. The project would require approvals from both the City and Alameda County.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
El Rancho Drive, La Madrona Drive Guardrail Project, Federal Project No. HSIPL-5936(135)
Solicitation # 40579
The El Rancho Drive and La Madrona Drive Guardrail Project, Federal Project No. HSIPL-5936(135), is a public infrastructure safety initiative managed by the County of Santa Cruz Department of Public Works. The project involves the installation of the Midwest Guardrail System and associated infrastructure repairs across 16 total locations, specifically 6 locations along El Rancho Drive and 10 locations along La Madrona Drive. The scope of work includes the removal of existing guardrails and AC dikes, cold planing AC pavement to a depth of 2 inches, constructing new AC dikes, and building earth retaining structures. The estimated cost of the project is 812,997 USD, with a required completion timeframe of 70 working days. The project is subject to strict federal and state regulations, including Buy America requirements for iron, steel, and manufactured products, and adherence to the Davis-Bacon and Related Act. It is a prevailing wage project governed by the Department of Industrial Relations. Contractors must provide a bid bond or security, as well as faithful performance and payment bonds upon award. Compliance requires rigorous documentation, including mill tags for steel products, certificates of compliance, and a clear chain of custody record verified by the Engineer. Proposals must be submitted electronically via the OpenGov portal and include mandatory certifications regarding debarment, non-collusion, and equal employment opportunity.
Public Works

POSTED

about 10 hours ago

DEADLINE

in 23 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS