Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, July 8 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Government of Canada was posted on May 14, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

GRAVEL ROAD RESTORATION PR 355 6.6KM WEST OF WEST JCT PR 250 TO WEST JCT PR 250

Closed
7712Canada

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
SLED
Call 001 612187-134319The project involves the design-build replacement of Bridge C-13-038 over State Route 116 (Chicopee Street) in District 2, Massachusetts, under procurement by the Massachusetts Department of Transportation (MassDOT). This is a lump sum contract structured as a Best Value Design-Build (BVDB) procurement, where selection is based on the lowest overall value rating—the total price divided by the cumulative technical score. The scope encompasses full civil, structural, traffic, stormwater, environmental, and utility coordination, including demolition of the existing bridge, new construction, temporary traffic control, public outreach, asbestos inspection and testing, and invasive species management. All unit prices are defined as all-inclusive, covering design, engineering, project management, quality control, equipment, transportation, installation, utilities, insurance, bonds, and warranty. The contract requires submission of both a technical proposal capped at 40 pages and a separate price proposal via the Bid Express platform, with a mandatory 5% bid bond. The technical evaluation is weighted 65% toward the design-build technical approach and 35% toward project management and coordination, with strict pass/fail gates for submission compliance, proper organization, and bid bond submission. The project must be completed within 2,039 calendar days from the anticipated Notice to Proceed date of December 8, 2026, with adjustments allowed if the completion date falls between December 1 and March 15. MassDOT mandates strict adherence to state laws, including MGL Chapter 149A (public construction labor standards), Chapter 268A (conflict of interest), and Chapter 30, §39M1/2 and §151/2 (procurement compliance). The contractor must implement a comprehensive Quality Control System with dedicated full-time managers for design, construction, and fabrication oversight, including independent oversight at fabrication plants beyond the fabricator’s own program. Non-conformance reports must be mitigated through defined procedures. Affirmative Action and Equal Employment Opportunity compliance is required, with firms of 50 or more employees and contracts over $50,000 needing an approved affirmative action plan on file with MassDOT. Disadvantaged Business Enterprise participation must be actively pursued. The contractor is responsible for all bonding, including performance and payment bonds for the full contract amount, and must comply with insurance and risk management standards. All documentation, including escrowed proposal materials, must be certified as complete and used solely
MASSDOT

POSTED

in about 2 months

DEADLINE

in about 2 months

AI Contract Overview

Show more

The contract involves the restoration of a 6.6-kilometer section of Provincial Road 355 in the Municipality of Oakview, stretching from 6.6 kilometers west of the West Junction of Provincial Road 250 to the West Junction itself. The scope includes preparation of the existing surface across 66 stations, installation of granular base course GBC-S totaling 12,000 metric tonnes, and required ancillary works such as mobilization of equipment and traffic control at Level III. Additional services include 150 hours of pilot vehicle operations and 100 hours of dust control measures to manage environmental and safety impacts during construction. All work must be completed within the designated roadway corridor, adhering to provincial standards and safety protocols. Bidding is open under solicitation number 7712, with the request for proposals posted on May 14, 2026, and responses due by May 28, 2026. The contract is issued by Manitoba Transportation and Infrastructure under the Government of Canada, classified under NAICS code 237310 for heavy and civil engineering construction. Bidders must access full documentation through Merx.com, where fees may apply. The primary point of contact for inquiries is Allison Saniuk, Contracting Authority, reachable via phone or email. The project is not subject to any specific set-aside provisions and requires full compliance with federal tendering procedures outlined on CanadaBuys.

General Info

Construction of 6.6 km granular base course on Provincial Road 355 including equipment mobilization and traffic control.

Agency

Government of Canada → Manitoba Transportation and Infrastructure - Tendering and Contracts

NAICS

237310 - Highway, Street, and Bridge Construction View NAICS

Place of Performance

CAN

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → Manitoba Transportation and Infrastructure - Tendering and Contracts
Contacts1 person available
OfficeN/A
Organization / Agency
Government of Canada → Manitoba Transportation and Infrastructure - Tendering and Contracts
Office AddressN/A
Contacts
Allison SaniukContracting Authority

Full Description

Show more
Construction of granular base course including preparation of existing surface on Provincial Road 355, from 6.6km West of the West Junction Provincial Road 250 to the West Junction of Provincial Road 250, for a total construction distance of 6.6km, in the Municipality of Oakview. code : 100description : Mobilization of Equipmentquantity : 1unitOfMeasure : Lump-Sumcode : 103description : Traffic Control Level IIIquantity : 1unitOfMeasure : Lump-Sumcode : 301description : Pilot Vehiclequantity : 150unitOfMeasure : Hourcode : 515description : Preparation of Existing Surfacequantity : 66unitOfMeasure : Stationcode : 838description : Dust Controlquantity : 100unitOfMeasure : Hourcode : 2013description : GBC- Squantity : 12000unitOfMeasure : Metric Ton/TonneBidding and Documents are available on http://www.merx.com. Fees may apply; See https://www.merx.com/public/pricing for more information.