Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Vermont was posted on March 3, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Green River Floodplain Restoration

Closed
73415State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The contract involves clearing and grubbing activities on the Green River Floodplain Restoration project, including the removal of approximately 31 trees larger than three inches in diameter at breast height, along with the elimination of two berms. A key component is the installation of a strategic wood addition on the river right side upstream of a slope failure, using large trees either sourced from the site or delivered that measure at least 20 inches DBH. These trees will be cut into long logs, some retaining their root balls, to effectively stabilize the area. Additionally, a bar buddy feature will be installed using a sizeable 30-inch DBH ash tree removed from the riverbank with its root ball intact. This installation will contribute around 20 cubic yards of woody debris placed in the river, of which 15 cubic yards will be situated below the ordinary high water mark. The woody debris will be further secured using nine cubic yards of substrate excavated during the reconnection of an existing overflow channel on the river left, adjacent to the slope failure, with minimal channel regrading conducted as part of the work. The project scope also includes reestablishing the overflow channel to improve hydrologic connectivity and implementing final stabilization measures such as seeding and mulching to support revegetation and erosion control. The solicitation was issued by the Vermont Department of Economic Development, with responses due by the end of March 2026. Communication and coordination for this project can be directed to the primary contact at Stone Environmental, indicating the focus on environmental restoration and floodplain functionality within the specified Vermont location.

General Info

Clearing, tree removal, wood installation, overflow channel restoration, and stabilization on Green River floodplain.

Documents

1
PDF, High priority: read this firstrfp
High

Read the document

Every page of every file, in your free workspace.

Read the document

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • 26350 Lynchburg, VA - CSO 70 Sewer ImprovementsOpen now, due in 10 days
  • Columbia, SC Major Pipe Rehabilitation GeopolymerOpen now, due in 20 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyVermont → Department of Economic Development
Contacts1 person available
OfficeVT, USA

Full Description

Show more
Clearing and grubbing, including approximately 31 trees greater than three inches diameter breast height (DBH), removal of two berms, installation of a strategic wood addition on river right upstream of the slope failure utilizing trees removed from the site or brought to the site that measure 20” or greater DBH, cut into logs measuring 44” or longer (some with root ball intact), installation of a bar buddy utilizing a 30” DBH ash tree located along the riverbank to be removed with its root ball attached, reconnection of an existing overflow channel along river left adjacent to the slope failure, and placement of seed and mulch. The bar buddy installation will place approximately 20 cubic yards of woody debris in the river (fifteen of which will be below ordinary high water) and require additional ballasting utilizing the nine cubic yards of substrate excavated to facilitate overflow channel reconnection. The project includes minimal channel regrading.

More opportunities from Vermont → Department of Economic Development

Same awarding agency

NAICS: 423310
New
SLED
Supply and Delivery of Firewood to NW (Region 3) Vermont State Parks
Solicitation # 77321
The State of Vermont Department of Economic Development is soliciting bids for the supply and delivery of kiln-dried firewood to various state parks in the Northwest Region for the 2027 operating season. The contract is expected to run from April 1, 2027, to April 1, 2028, with an option to extend for two additional 12-month terms upon mutual agreement. The primary goal is to provide a reliable and affordable firewood source to deter visitors from cutting park trees or transporting invasive species, specifically targeting the prevention of the emerald ash borer. Deliveries must be made within seven calendar days of a request and placed as close to the park woodshed as possible. Special logistics are required for Burton Island State Park, necessitating coordination with a landing craft operator and the use of a 4-cord single-axle delivery truck. Firewood specifications require a moisture content not exceeding 25%, a uniform mix of 85% hardwood and 15% softwood, and a maximum length of 16 inches. Wood sourced from outside Vermont must be heat treated to a minimum core temperature of 160°F for at least 75 minutes and accompanied by a certification document. Invoicing is permitted no more frequently than once per month, with payments made on a per cord per delivery basis. The contract is subject to standard state provisions, including strict cybersecurity standards, ADA compliance, and the availability of state appropriations. There is no set-aside status for this solicitation.
Lumber, Plywood, Millwork, and Wood Panel Merchant Wholesalers

POSTED

about 11 hours ago

DEADLINE

in 17 days
View Details

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS