Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Green Valley Commercial Center / CUP25-0003, PD24-0003

Forecast
CUP25-0003, PD24-0003State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The project involves the development of a multi-use commercial center featuring a 1,459 square foot Quick Serve Restaurant without a drive-through, a 3,549 square foot convenience store and fueling station operated by ARCO ampm with a 4,366 square foot canopy and six multi-product dispensers providing twelve fueling positions, a 3,694 square foot McDonald’s restaurant with a side-by-side drive-through, and a 3,588 square foot single-bay drive-through carwash operated by Quick Quack. On-site improvements include parking, lighting, landscaping, signage under the Uniform Sign Program, and a 6,000 square foot bioretention facility in the southwest corner for stormwater management. Two underground fuel storage tanks—a 25,000-gallon tank and a 22,000-gallon split tank—will be installed to support the fueling operations. Access is primarily from Green Valley Road via right-turn ingress and egress, with secondary access provided through an existing driveway shared with the adjacent Grocery Outlet. A new traffic signal will be constructed at this shared access point to improve safety and traffic flow. To ensure coordinated operations and long-term access rights, a reciprocal/shared access and parking agreement will be legally binding through the CC&Rs, guaranteeing vehicular access and parking between the project and the Grocery Outlet. An 8-foot-tall concrete masonry unit sound wall will be built along the eastern and southern property lines, matching the existing wall behind the Grocery Outlet. On-site circulation is designed around two drive aisles—one connecting directly to Green Valley Road and the other linking to the Grocery Outlet’s access. Off-site improvements include extending public utility lines for sewer and water along Green Valley Road, upgrading the roadway with a 6-foot-wide sidewalk, and connecting electrical service to existing PG&E infrastructure. The project is governed by El Dorado County under CUP25-0003 and PD24-0003, with planning oversight provided by Senior Planner Bianca Dinkler and located in the 95682 ZIP code area of California.

General Info

Multi-use commercial center with restaurants, fuel station, carwash, stormwater facility, shared access, sound wall, and utility upgrades in El Dorado County.

Agency

California → El Dorado County

Place of Performance

Green Valley Road and Cameron Park Drive, CA, 95682

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → El Dorado County
Contacts1 person available
OfficeN/A
Organization / Agency
California → El Dorado County
Office AddressN/A
Contacts
Bianca DinklerSenior Planner

Full Description

Show more
The project proposes a 1,459 square foot Quick Serve Restaurant (QSR) (no drive-through), a 3,549 square foot convenience store and fueling station with 4,366 square foot canopy and six (6) multi-product dispensers (MPDs) providing twelve (12) fueling positions (ARCO am/pm), a 3,694 square foot restaurant with side-by-side drive-through (McDonald’s), and a 3,588 square foot, single-bay drive-through carwash (Quick Quack). The project includes associated on-site improvements for parking, lighting, landscaping, and signage (Uniform Sign Program), and off-site improvements for a proposed traffic signal on Green Valley Road into the shopping center. The fueling facility would require the installation of two underground fuel storage tanks: one 25,000-gallon tank and one 22,000-gallon split tank. Access to the project site would be from Green Valley Road and provided by a proposed right-turn ingress and right-turn egress. Secondary access would be provided through an existing full-access driveway along Green Valley Road that provides access to the Grocery Outlet located west of the project site. The proposed traffic signal would be constructed at this existing full-access driveway. On-site circulation would be from drive aisles running through the central portions of the site. One drive aisle would connect to Green Valley Road and provide the main access point; another drive aisle would connect to the Grocery Outlet drive aisle and provide a secondary access point. To ensure adequate off-street parking and emergency/vehicular access is maintained in perpetuity between the proposed project site and the Grocery Outlet, a reciprocal/shared access and parking agreement would be required as a Condition of Approval (COA) and included in the CC&Rs. A concrete masonry unit (CMU) sound wall would be constructed along the eastern and southern property lines. The height of the proposed CMU wall would be 8-ft tall and constructed to match the existing 8-ft CMU wall behind the Grocery Outlet. The CMU wall would be constructed of rectangular concrete block and stacked with mortar. The project includes a bioretention facility covering 6,000 square feet and would be constructed in the south/west corner of the project site. The proposed project includes improvements to Green Valley Road (e.g., 6-foot-wide sidewalk) and expansion of the existing utilities on site, located along Green Valley Road, by extending the public utility lines including sewer force main and waterline. Electrical service would be provided by connecting to existing PG&E infrastructure in the project vicinity.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an Invitation for Bid (IFB No. 8003R1) for the City of Los Angeles Department of Water and Power. Located in California, the project encompasses a broad range of civil and infrastructure works, including underground construction such as tunneling, boring, jacking, and micro tunneling, as well as site preparation, shoring, asphalt paving, and the installation of utilities, manholes, and traffic signals. Additional requirements include land surveying, site security, traffic control, and storm water pollution prevention. This opportunity is set aside for Small Businesses, including SBA certified Women-Owned Small Businesses and Disadvantaged Business Enterprises. To be considered responsive, bidders must possess a valid California Contractor's license and provide acceptable insurance. Furthermore, responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, for which Kiewit will reimburse the premiums. Kiewit also emphasizes the importance of labor harmony and notes its status as a signatory to various collective bargaining agreements. Interested parties must submit their quotes by November 18, 2025, via the Building Connected electronic system.
Kiewit Infrastructure West Co.

POSTED

about 3 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237310
New
SLED
Athletic Track and Field Resurfacing
Solicitation # IFB27000092
Chesterfield County in Virginia is soliciting bids for a requirements contract to provide all labor, materials, equipment, permits, and insurance for the repair and resurfacing of athletic tracks and appurtenances. The scope of work includes the removal and disposal of existing porous rubber surfaces, surveying asphalt bases for planarity, and installing a new durable wearing surface consisting of a polyurethane structural spray with EPDM rubber granules and MDI pigmented polyurethane binder. Additionally, the contractor may be required to mill existing asphalt and provide a minimum 1.5 inch asphalt overlay meeting VDOT specifications for SM 9.5A. Key deliverables include the installation of Maxflex 3/8 inch surfacing or equivalent, urethane line marking, and the construction of new concrete shot put and discus pads. All work must adhere to NFSHSA rules for track and field, the Virginia Uniform Statewide Building Code, and local regulations. Award will be granted to the lowest responsive and responsible bidder based on the Grand Total Bid, with extended warranty information serving as a potential factor. Bidders must provide pricing for all listed items, including various square yardage tiers for surface removal, stone base installation, and surfacing. The contract requires strict adherence to equal employment opportunity, non-discrimination, and drug-free workplace provisions. Performance takes place on County property, requiring employees to obtain identification cards and utilize the Raptor system for school site access. Payment is managed through the County's preferred ePayables program or via mailed checks, with all invoices requiring specific purchase order details. Bids must be submitted by December 17, 2026, either electronically through the eProcurement system or as a hard copy delivered to the Lane B. Ramsey Building.
Chesterfield County

POSTED

about 5 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237310
New
SLED
AL3985180-Replacement of Bridge No. 0109100 on MD 144 Over Evitts Creek located in Allegany County.
Solicitation # AL3985180
Solicitation AL3985180, managed by the Maryland Department of Transportation State Highway Administration, involves the replacement of Bridge No. 0109100 on MD 144 over Evitts Creek in Allegany County. The project replaces an existing three-span steel girder bridge with a new single-span steel girder bridge measuring 110 feet in length. This new structure will feature two 11-foot wide travel lanes and two variable-width, bicycle-compatible shoulders ranging from 6.5 to 8.5 feet. To maintain traffic during construction, eastbound traffic will be detoured while westbound traffic remains open. The scope of work extends beyond the bridge to include the installation of a grass swale along the US 220 ramp to I-68 West for stormwater management and the installation of utility support systems, pipes, and conduits for Columbia Gas and Lumen Technologies Inc. This project is federally funded under F.A.P. Number AC-STBG-G-1396(004)E and requires adherence to Title VI of the 1964 Civil Rights Act and Standard Federal Equal Employment Opportunity Construction Contract Specifications. Bids must be submitted electronically via Bid Express by January 14, 2027. For contracts exceeding 100,000 dollars, a bid security of at least five percent of the total bid is required, along with payment and performance bonds.

POSTED

about 7 hours ago

DEADLINE

in 2 months
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS