Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Greenlane Medium and Heavy-Duty Electric Vehicle Charging Station, Temporary Truck Parking and Solar Power Generation with Battery Energy Storage System

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Greenlane Infrastructure, LLC is developing a multi-phase infrastructure project in Blythe, California, involving a medium and heavy-duty electric vehicle fast charging station, a temporary truck and trailer parking facility, and solar power generation integrated with a battery energy storage system. The project is situated on a 37.38-acre site comprising three parcels located at 13241 N. Neighbors Boulevard, north of I-10 and west of Neighbors Boulevard. Development will begin with the charging station and truck parking in the first phase, while subsequent elements will be implemented based on market conditions. The project site is identified by APNs 824-142-013, 015, and 019 and is consistent with the City of Blythe's General Plan and its Service-Industrial and General Commercial zoning designations. The City of Blythe approved a Notice of Exemption for the project on October 14, 2025, declaring it exempt from CEQA under Guidelines Section 15183 due to its consistency with community plans and zoning. The primary beneficiaries of this development include the applicant, the City of Blythe, and the State of California. Administrative oversight is provided by the City of Blythe, with Mallory Crecelius serving as the lead agency contact. While the project is categorized under NAICS code 237310, specific contract values, solicitation numbers, and detailed evaluation factors are not specified in the current documentation.

General Info

Greenlane Infrastructure is developing EV charging, truck parking, and solar power in Blythe.

Agency

California → City of Blythe

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

South of Hobsonway, west of Neighbors Boulevard, Blythe, CA, 92225

Set-Aside

NONE

Documents

(1)

Notice of Exemption for Greenlane EV Charging Station Project

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Blythe
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Blythe
Office AddressN/A
Contacts
Mallory CreceliusInterim City Manager

Full Description

Show more
Greenlane Infrastructure, LLC (Greenlane) has applied to the City of Blythe to develop an electric vehicle (EV) Fast Charging Station, with a temporary truck and trailer parking facility, and Solar Power Generation with a Battery Energy Storage System. The project site includes three parcels totaling 37.38 acres. The charging station and truck parking uses will be developed in a first phase with subsequent project elements to be developed based upon market conditions. Site operations would be consistent with the City’s General Plan and zoning land use designations of “Service-Industrial” and “General Commercial”. Primary beneficiaries include the applicant and the City of Blythe, and the State of California.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
Citywide Slurry Seal Project (Cycle 1)
Solicitation # 26-03
The Citywide Slurry Seal Project (Cycle 1), identified as Capital Improvement Project No. 26-03, is a solicitation by the City of Downey, California, for the maintenance and improvement of various residential streets. The scope of work includes pavement surface preparation, crack sealing, the application of emulsified Type II slurry seal coat, and the construction of a 2-inch thick Asphalt-Rubber Hot Mix (ARHM-GG) pavement overlay. Additionally, the contractor is responsible for replacing traffic striping, pavement markings, and raised pavement markers, as well as implementing necessary traffic control. The project requires the contractor to furnish all labor, materials, and equipment, with a specific requirement to sweep all slurry sealed streets five to seven calendar days after application to remove loose aggregate. The contract will be awarded to the lowest responsible bidder who meets all technical specifications and provides a responsive proposal. Bidders must submit a bid bond of at least 10 percent of the bid amount and provide performance and payment bonds totaling 100 percent of the contract price upon award. Compliance with the California Labor Code regarding prevailing wages is mandatory, and the contractor must maintain workers' compensation and public liability insurance. The project includes a one-year warranty on all materials and workmanship. Final acceptance of the work is conducted by the City Council following an inspection and recommendation by the City Engineer.
City of Downey

POSTED

about 9 hours ago

DEADLINE

in 3 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS