This Government Contract opportunity from Department Of Agriculture was posted on September 26, 2010. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
This project involves the reconstruction and rehabilitation of the Greer Crossing Recreation Area located within the Eleven Point Ranger District of the Mark Twain National Forest in Oregon County, Missouri. The scope of work encompasses a wide range of site improvements, including the demolition and disposal of existing structures, concrete installation for walkways, storage sheds, and dumpster pads, as well as electrical work and the painting and striping of the campground parking lot. Additional requirements include earthwork such as clearing, grubbing, excavation, aggregate placement, and landscaping through mulching and seeding.
Managed by the Department of Agriculture, the contract requires offerors to be registered in the Central Contractor Registry to be eligible for award. The project is categorized under NAICS code 237990 and was coordinated through the Mark Twain National Forest office in Rolla, Missouri. All work must be completed in strict accordance with the provided drawings and specifications outlined in the solicitation.
HighAI Summary for 3-Panel Information Kiosk Front Elevation View: Technical specification and elevation drawing for a 3-Panel Information Kiosk, including details on OEM parts, RF antenna switches, tuning sockets, and power supply insulation test cords.
RTF
RTF, High priority: read this firstamendment
HighAI Summary for AG-64R4-S-10-0021 Greer Crossing Amendment 1: Amendment 1 to solicitation AG-64R4-S-10-0021 regarding Greer Crossing, dated September 7, 2010. The document utilizes SF-30 and includes a Q&A section addressing technical and submission inquiries.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for CCT Vault Connecting Level Landing Detail Spec: Technical civil engineering drawing and specifications for a CCT Vault Connecting Level Landing, detailing concrete pavement requirements, subgrade compaction, and rebar dowel specifications.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Concrete Storage Pad Detailing - ORAR Route Section: Technical specifications and detailing for a concrete storage pad, including dimensions (6'x12'x2'), subgrade requirements, concrete compressive strength (50 PSI), and material requirements for the ORAR route section. Includes notes on installation according to local codes and manufacturer recommendations.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Electrical Trench and Concrete Pad Detail Drawings: Technical drawing specifications from the U.S. Department of Agriculture Forest Service (Drawing S-3610-01) detailing electrical trench section views, concrete pad sections, and burial depth requirements for electric lines in roads.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Gravel Spur - Cross Section of Camping Spur Detail: Technical specifications and cross-section details for the Gravel Spur project located in Tenth Mountain Forest under the USDA Northeastern United States Fraseranch Project. The document outlines material requirements (Portland cement, PVC tape concrete) and installation constraints for camping spurs.
PDF
PDF, High priority: read this firstbid-schedule
HighAI Summary for Greer RSI Bid Schedule 2010514: A bid schedule and itemized list of requirements for Greer RSI. The document includes a schedule of items ranging from material specifications (3M tapes, DuPont Zytrel, adhesives) to specific labor tasks including electrical work, RoHS requirements, and installation services.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Greer RSI Day Use Comp Site Plan: A site plan document for the Greer RSI Day Use area, featuring a scale in feet, layout for new concrete sidewalks, trailer parking, and existing amenities such as kiosks and toilets. The document includes a legend for site features and references NOAA marine navigation guidelines.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Greer RSI Dumpster Pad Details: Technical specifications and construction details for a concrete dumpster pad, including pavement section requirements, reinforcement details, subgrade compaction, and rebar placement. The document specifies dimensions of 12'-0 x 13'-0 and a weight capacity of 100 lb/ft².
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Greer RSI Existing Site Conditions Map: A technical site conditions document dated July 15, 2020, detailing existing infrastructure including waterlines, electric service, gas lines, sewer lines, wastewater pipes, and parking designations for the Greer RSI project.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Greer RSI Host Site Detail: A technical detail document containing site specifications for electrical apparatus, waterlines, and equipment installations, including references to the Nevada College of Arts and Sciences Grad Student Manual.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Greer RSI Kiosk Plan Details - Roof Layout: Technical drawing and specifications for a roof layout plan, featuring Lithonic GCL 1:1 slope ridge with P.V.D. system and 6x6 roof supports. Includes typical section details and reference design 14-16.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Greer RSI Spur Detail: Technical drawing or specification sheet for the USDA detailing spur layouts, including dimensions (20WX60L, 20WX65L), parking barriers, and road types. Dated 07/01/2025.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Greer RSI Spur Detail 2010514: Technical detail document providing specifications for dumpster pads and spur lines, referencing existing overpasses and the US Department of Transportation/Architecture.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Greer RSI Spur Detail 2010514: Technical drawing specifications and notes regarding parking barrier installations, hazard markings, and parking requirements for a specific site location.
PDF
PDF, Low priorityspecifications
LowAI Summary for Greer RSI Spur Detail 2010514: The document provides reference details for an image related to Greer RSI Spur Detail 2010514.
PDF
PDF, Low priorityspecifications
LowAI Summary for USDA FAS East River Region Vicinity Map and Index Sheets: A technical document from the USDA Foreign Agricultural Service East River Region containing vicinity map descriptions for three recreating areas northwest of Havre, Montana, and an index of project sheets including site construction and planning studies. The document includes approval and recommendation signatures from regional and district leadership.
DOC
DOC
DOC
DOC
DOC
DOC
RTF
RTF
DOC
DOC
DOCX
DOCX
AI Contract Breakdown
Uniform Contract Format
Contract not broken down yet
CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.
Timeline
3 updates
PhaseAwarded
Posted
Presolicitation
Notice updated
Response deadline changed from Aug 30, 2010 to Sep 7, 2010. The notice description changed.
Notice updated
The notice description changed.
Notice updated
Notice details unchanged. Attachments may have changed.
Type Changed
Presolicitation → Solicitation
Awarded
Contract was awarded
Submission Closed
Find active opportunities like this
Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.
Organization & Contact Information
Show more
AgencyDepartment Of Agriculture → Mark Twain National Forest
This project is for reconstruction and rehabilitation of the Greer Crossing Recreation Area on the Eleven Point Ranger Disrict of the Mark Twain National Forest in Oregon County, Missouri. Work may include, but is not limited to, the following components: mobilization of workforce, equipment and materials; demolition, removal and disposal of existing structures; concrete work for dumpster pad, storage shed, walkways and landing at toilet; painting and striping of campground parking lot; installation of government-furnished wheelstops; electrical work for recreation site improvements; earthwork including clearing and grubbing, excavation and backfill, aggregate placement, raking, mulching and seeding; and incidental work necessary to complete the project in accordance with the drawings and specifications of the solicitation. Offerors must be registered in the Central Contractor Registry (www.ccr.gov) in accordance with FAR 52.204-7 prior to award. Failure to register will result in the proposal being removed from consideration for award. This solicitation will be available for downloading from this website on or about August 12, 2010. No hard copies of the solicitation will be mailed. Interested vendors should register to receive notifications through this site.