This Solicitation opportunity from Minnesota was posted on June 25, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Grey Eagle Wildlife Management Area Water Control Structure Replacement
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
This contract pertains to the replacement of a water control structure at the Grey Eagle Wildlife Management Area in Minnesota, with a focus on supporting targeted groups including economically disadvantaged and veteran-owned businesses. The project will be executed under a single prime contract and involves a range of construction activities such as installing erosion control measures, sheet piling, and both custom-designed and reinforced concrete culverts. Additionally, the scope includes transporting and placing fill to modify dike slopes, removing and recycling existing water control structures, establishing vegetation, and removing temporary erosion control devices once work is completed. The project is overseen by the Minnesota Department of Natural Resources, with plans and specifications provided by the department, ensuring adherence to state environmental and construction standards. The solicitation for this project was posted in June 2025, with a response deadline in July 2025, and is managed by the Minnesota Department of Administration. The project is estimated to have a total value between $500,000 and $1,500,000, and is categorized under NAICS code 561730, which covers landscaping services, indicating the scope involves significant site work and environmental management. The primary contact for inquiries is Thomas Dettle, reachable via email or phone, and interested parties can access detailed project documents through the provided online link.
General Info
Agency
Place of Performance
MN, USASet-Aside
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Submission Closed
Organization & Contact Information
Full Description
1. Install erosion control. 2. Install sheet piling. 3. Install a custom-designed concrete box culvert. 4. Install a reinforced concrete culvert. 5. Transport and place fill material to lessen dike slope. 6. Remove and recycle an existing corrugated metal water control structure. 7. Establish vegetation. 8. Remove erosion control devices.
Plans and Specifications were prepared by the Minnesota Department of Natural Resources, Contact: Thomas Dettle, email: Thomas.Dettle@state.mn.us, Telephone: (507) 923-5705.
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
