Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Grinder Pump Station Equipment and Installation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for the Town of Stanley in Virginia involves the supply and installation of a sewer grinder pump station and its associated electrical control components. The scope of work includes the installation of a 1/2 HP 120V AC pump unit, the connection of a stainless steel lateral kit, and the setup of PNP sensors and LED alarm indicators. The contractor is responsible for delivering a fully operational system and must provide electrical certification for all pump wiring and power connections. The project is categorized under NAICS code 238210 and is intended for prime contractors working on Town of Stanley sewer projects. Interested parties must submit their responses by September 23, 2026, for work to be performed within the city of Stanley.

General Info

Subcontract for installing a sewer grinder pump station in Stanley, Virginia by September 2026.

Agency

Virginia → Town of StanleyView Agency

NAICS

238210 - Electrical Contractors and Other Wiring Installation ContractorsView NAICS

Place of Performance

Stanley, VA, USA

Set-Aside

NONE

Documents

This scope was carved out of 2026-001.

The full solicitation package (6 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Town of Stanley - Pond Avenue VDH SWAP Sewer Project

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyVirginia → Town of Stanley
ContactsNo contacts available
OfficeN/A
Organization / Agency
Virginia → Town of Stanley
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supplies and installs a sewer grinder pump station and electrical control components for prime contractors on Town of Stanley sewer projects. Installs a 1/2 HP 120V AC pump unit, connects a stainless steel lateral kit (SMC-SH-1000), and sets up PNP sensors and LED alarm indicators. Requires electrical certification for pump wiring and power connection. Delivers a fully operational grinder pump station.

Similar Contracts

Same NAICS industry code

NAICS: 238210
New
SLED
Existing Generators Replacement Aguadilla, PR
Solicitation # 872298
This project involves the complete replacement of two existing power generators at the Aguadilla Detention Facility in Aguadilla, Puerto Rico. The scope of work requires the installation of one 100 kW and one 150 kW Perkins diesel generator, both featuring stainless-steel enclosures to protect against salt air and moisture. The installation includes two new NEMA 3R automatic transfer switches, the use of grade 5 or higher galvanized anchor bolts for securing units to the existing concrete slab, and the performance of load bank testing for both units. The project is estimated to have a magnitude between $250,000 and $300,000, with a total period of performance of 270 calendar days from the Notice to Proceed. The contract is a Firm-Fixed-Price task order issued under an 8(a) Multiple Award Construction Contract (MACC) IDIQ. Award will be based solely on the lowest total evaluated price. Key compliance requirements include adherence to the Buy American Act, Davis-Bacon prevailing wage rates per determination PR20260001, and the provision of performance and payment bonds. Additionally, the contractor must comply with strict security protocols, including the signing of DHS Non-Disclosure Agreements and the acquisition of ICE-provisioned PIV cards for personnel. All work must meet NFPA 70, International Building Code, and NEC Article 445 standards.
Bristol Alliance of Companies

POSTED

about 3 hours ago

DEADLINE

in 12 days
View Details
NAICS: 238210
New
SLED
B4213 Replace Fire Alarm System
Solicitation # N400857504546
Solicitation N400857504546 is a task order under a Multiple Award Construction Contract for the replacement and upgrade of the fire alarm and mass notification system in Building 4213 at MCAS Cherry Point, North Carolina. The project involves the demolition of existing components and the installation of a new fully addressable fire detection and notification system, including VESDA panels and associated electrical modifications across both floors. The work must be performed while the building remains occupied, with a completion period of 270 calendar days. The estimated cost for the project ranges between 500,000 and 1,000,000 dollars, and the award will be based on the lowest price. Key deadlines include a pre-proposal inquiry cutoff of September 18, 2026, and a proposal submission deadline of September 24, 2026. Because the project value exceeds 150,000 dollars, bidders must provide a bid bond with their proposal, as well as performance and payment bonds upon award. The contractor is required to host a partnering session within 45 days of the award and adhere to Davis-Bacon Act labor standards and Buy American requirements. Final acceptance is subject to a multi-stage inspection process, including punch-out and pre-final inspections, to ensure the system meets UFC, IBC, and NFPA standards for audibility and intelligibility.
Bristol Alliance of Companies

POSTED

about 3 hours ago

DEADLINE

in 6 days
View Details
NAICS: 238210
New
SLED
Conex Offices for Forensics Personnel - St. Thomas
Solicitation # 872300
This firm-fixed-price task order, issued under an 8(a) Multiple Award Construction Contract (MACC) IDIQ, requires the installation of two 40ft x 8ft steel FLEXTAINER offices for forensics personnel at the HSI Facility in St. Thomas, US Virgin Islands. The project scope includes the construction of 3k PSI reinforced concrete slabs, installation of the units with R-11 insulation and vinyl flooring, and the integration of split-system A/C units, LED lighting, 120V electrical outlets, and security windows. Each unit must feature a steel door with a Cypher lock and a 5-pound ABC fire extinguisher. Electrical connectivity must be established via 2-inch diameter PVC or uPVC conduit to the nearest circuit. The contract has an estimated magnitude between $250,000 and $300,000, with a total period of performance of 364 calendar days from the Notice to Proceed. Award will be based on the lowest total evaluated price among qualified 8(a) contractors. Key compliance requirements include adherence to the Buy America Act, Davis-Bacon prevailing wage rates per determination VI20260001, and NFPA 70 and International Building Code standards. Security protocols are stringent, requiring personnel to sign DHS Non-Disclosure Agreements, obtain PIV cards, and complete annual Cybersecurity Awareness Training. Contractors must submit a project schedule within 15 days of the Notice to Proceed and utilize the Invoice Processing Platform for electronic payments accompanied by certified payroll.
Bristol Alliance of Companies

POSTED

about 3 hours ago

DEADLINE

in 12 days
View Details
NAICS: 238210
New
Los Angeles Job Corps Egress Lighting
Solicitation # Emergency Egress Lighting
Management & Training Corporation is seeking a subcontractor to provide all labor, materials, and equipment necessary to furnish and install four new dual-head emergency egress light fixtures at the Los Angeles Job Corps warehouse located at 424-426 Towne Avenue, Los Angeles, California. The project includes all associated electrical work, circuit integration, and the verification of battery backup systems to ensure compliance with building, fire, and electrical codes. The award will be based on best value, and the selected contractor must adhere to Service Contract Labor Standards as outlined in Wage Determination No. 2015-5613 Rev 31. This opportunity is open to small businesses, including SDB, WOSB, HUBZone, VOSB, and SDVOSB certifications, under NAICS code 238210 with a size standard of 19 million dollars. Interested parties must submit a bid sheet, proof of insurance, three professional references, and a completed supplier packet containing a W-9, self-certification form, and acceptance of terms and conditions by September 25, 2026. The contract requires strict adherence to federal regulations regarding the protection of sensitive information, combating trafficking in persons, and specific FAR clauses. Invoicing is to be submitted on a weekly or bi-weekly basis, and the center is exempt from sales tax under the Workforce Investment Act.
MTC Los Angeles Job Corps

POSTED

about 3 hours ago

DEADLINE

in 9 days
View Details
NAICS: 238210
New
Joliet JCC Electrical Projects
Solicitation # joliet-jcc-electrical-projects
This subcontracting opportunity with Management & Training Corporation (MTC) involves electrical infrastructure replacements at the Joliet Job Corps Center in Illinois. The scope of work consists of two primary projects: the removal and replacement of a water-damaged 30 KVA transformer, including the installation of a steel support platform to prevent future flood damage, and the replacement of a light pole with a new 12-foot aluminum pole and LED area light fixture. The project is a fixed-price, single lump sum contract with an estimated value between 0 and 25,000 dollars. Award is based on overall best value, and the opportunity is open to various small business set-asides, including SDB, WOSB, HUBZone, and SDVOSB. Prospective bidders must complete a mandatory physical site visit and submit a comprehensive proposal by September 16, 2026. Required submission materials include a signed bid sheet, a detailed cost breakout on company letterhead, proof of insurance, three references, and the MTC Supplier Packet. Contractors must comply with prevailing wage determinations, submit weekly certified payroll reports, and provide two hours of on-site training for facility personnel upon completion. For bids equal to or greater than 25,000 dollars, a 20 percent bid bond and full performance and payment bonds from an A- rated surety company are required. Final payment is contingent upon a successful final inspection and the submission of closeout documents, including a notice of final completion and a certificate of release of liens.
Joliet Job Corps

POSTED

about 3 hours ago

DEADLINE

in 6 days
View Details

More opportunities from Virginia → Town of Stanley

Same awarding agency

NAICS: 237110
New
SLED
Town of Stanley - Pond Avenue VDH SWAP Sewer Project
Solicitation # 2026-001
The Town of Stanley is soliciting bids for the Pond Avenue VDH SWAP Sewer Project, which involves the complete abandonment of an existing residential septic system at 314 Pond Ave and the installation of a new sewer grinder pump station, sewer force main, and house lateral connection. The project requires tying these new components into the existing sewer system, specifically connecting to a manhole located in front of 396 Pond Ave. This stipulated price contract is funded by a Virginia Department of Health grant and is governed by EJCDC standards. The project timeline specifies substantial completion by November 30, 2026, and final completion and closeout by December 15, 2026. Bids must be submitted via paper copy and hand-delivered or mailed to the Town of Stanley by September 23, 2026, at 3:00 PM. The evaluation process considers the bidder's responsiveness, responsibility, and price, as well as their qualifications and experience. Required submission materials include a bid security bond of 5 percent, and the successful contractor must provide performance and payment bonds along with a certificate of insurance before receiving a notice to proceed. The scope includes a lump sum for the primary installation and a unit price for rock or unsuitable trench excavation. Inspections will be conducted by Racey Engineering, and the Town will cover the cost of required third-party compaction testing.
Water and Sewer Line and Related Structures Construction

POSTED

3 days ago

DEADLINE

in 6 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS