Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

Groundwater Well #2 Emergency Repair

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Whittier Public Works Department is seeking an emergency repair for Groundwater Well 2 located at 9217 Salma Ln., Pico Rivera, California. The scope of work involves the removal and inspection of critical well components, including column pipes, electrical cables, the bowl assembly, and the pump and motor. Additionally, the project requires brushing and bailing the well casing and the repair or replacement of any damaged equipment to restore the well to its proper operational function. This project is classified under NAICS code 237110 and is designated as a Class 1 exemption under the California Environmental Quality Act (CEQA) Guidelines, as it consists of the repair and maintenance of existing mechanical equipment with negligible expansion of use. Environmental assessments confirm that the site does not impact historical resources, is not a designated scenic highway, and has no value as a habitat for endangered, rare, or threatened species. Furthermore, the site is not listed on Geotracker as an active clean-up site assessment. Primary points of contact for the project include Riad Elmal, Civil Engineering Assistant, and Jim Homet, Senior Civil Engineer.

General Info

City of Whittier repairs Groundwater Well #2 with no environmental impact under state exemption.

Agency

California → City of Whittier

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

Whittier, CA, 90660

Set-Aside

NONE

Documents

(1)

Groundwater Well #2 Emergency Repair Notice of Exemption

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Whittier
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Whittier
Office AddressN/A
Contacts
Riad ElmalCivil Engineering Assistant

Full Description

Show more
This project includes water improvements as follows: remove and inspect Well 2 components, including column pipes, electrical cables, bowl assembly, and pump / motor. Brush and bail the well casing and repair or replace any damaged equipment to restore proper function to Well 2. The disturbed project site has no value as habitat for endangered, rare, or threatened species; 9217 Salma Ln., Pico Rivera CA 90660 is not a designated scenic highway. The project site is not listed on Geotracker as having an active clean-up site assessment pursuant to lists identified under Section 65962.5 of the Government Code. The project site does not impact historical resources.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
JCSD Intervalley Pipeline Project; PN C155003
Solicitation # PN C155003
The JCSD Intervalley Pipeline Project (PN C155003) involves the installation of 3.3 miles of potable water transmission pipeline located on Country Village Road in Jurupa, California. With an engineer's estimate of 36,000,000 dollars, the project is being managed by Filanc and is subject to American Iron and Steel (AIS) and Build America, Buy America (BABA) requirements. The scope of work is extensive, encompassing pipeline infrastructure such as welding, cathodic protection, valves, and jack and bore operations, as well as civil engineering tasks including paving, striping, flatwork, precast vaults, fencing, and potholing. Additionally, the project requires technical services for surveying, settlement monitoring, videography, E&IC, and environmental management through SWPPP implementation and asbestos pipe demolition and removal. This solicitation is open to a wide range of small business set-asides, including SDB, WOSB, HUBZone, VOSB, and SDVOSB firms, with a strong emphasis on the participation of SBE, MBE, and WBE entities. Filanc has indicated a willingness to assist qualified diverse firms with bonding, insurance, and equipment to encourage participation. Bids and quotes for the various project scopes must be submitted by 2:00 PM on September 18, 2026. Interested parties can obtain plans and specifications through Julia Masaitis.
Filanc

POSTED

about 11 hours ago

DEADLINE

in 13 days
View Details
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project in Highland, California, involves the installation of extensive water infrastructure for the Metropolitan Water District of Southern California. The scope of work includes furnishing and installing approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project also requires the installation of various large-diameter valves, including contractor-furnished units and Metropolitan-furnished 54-inch and 132-inch valves, along with 54-inch and 145.5-inch diameter tie-ins. Additional infrastructure requirements include the construction of four surge tanks, two valve vaults, an air compressor yard structure, and drainage improvements. The contract encompasses electrical upgrades, instrumentation and controls, piping systems, and civil works such as the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. This solicitation, managed by James W. Fowler Co., is open to small businesses, including SDVOSB, MBE, and WBE certified firms, with a bid submission deadline of September 29, 2026. Support is available for M/W/DBE subcontractors regarding bonding, insurance, and material procurement, and the use of apprentices is encouraged.
James W. Fowler Co.

POSTED

about 11 hours ago

DEADLINE

in 24 days
View Details