Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from General Services Administration was posted on July 30, 2020. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

GSA Region 5 Supplemental Architect & Engineering Services IDIQ

Closed
47PF0020R0004Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541310
New
SLED
RFQ 2026-04 Annual Architectural Services- Short Listed Firms
Solicitation # RFQ 2026-04
Tallahassee State College is soliciting qualifications through RFQ 2026-04 for a continuing services contract to provide annual architectural services for new construction, renovation, and remodeling projects. The contract has a maximum potential term of three years, consisting of an initial period with optional one-year renewals based on performance and funding. Work will be assigned on a rotating basis, and the selected firm must comply with all federal, state, and local regulations, including the Americans with Disabilities Act, OSHA standards, and State Requirements for Educational Facilities. If federal funding is utilized, the contractor must adhere to additional requirements such as the Davis Bacon Wage Act and 2 CFR Part 200. The selection process involves a written proposal evaluation followed by a short-listing process for formal presentations. Written proposals are scored based on criteria including architectural experience, management adequacy, project workload, and past performance. Proposers must be licensed architects in Florida and provide evidence of corporate good standing. The evaluation committee is scheduled to meet on October 20, 2026, at 10:00 am in Facilities Building 54, Room 211 to review and score the qualifications. Contract administration is managed by Dustin Frost, and payment terms are set at Net 30 following the receipt of an acceptable invoice.
Tallahassee State College

POSTED

about 14 hours ago

DEADLINE

in 2 days
NAICS: 541310
New
SLED
Architect-Engineering Services for the FL 6th District Court of Appeal – New Courthouse
Solicitation # RFQ REDM2627-01
The Florida Department of Management Services, Division of Real Estate Development and Management, is soliciting Request for Qualifications RFQ REDM2627-01 for architectural and engineering services to design and construct the new State of Florida Sixth District Court of Appeal courthouse. Located on a 5.30-acre state-owned parcel at 4165 Lakeland Hills Boulevard in Lakeland, Florida, the project scope includes the development of an appellate courtroom, judicial chambers, staff offices, a Clerk's Office, a Marshal's Office, secured and public circulation, technology and security systems, and approximately 120 parking spaces. The project has an estimated construction budget of 53.5 million dollars, which excludes the compensation of the selected Architect-Engineer. The procurement utilizes a two-stage qualifications-based selection process in accordance with section 287.055, Florida Statutes. Stage one involves a preliminary screening based on the firm's proximity to the project, relevant design experience, and ability to perform contract delivery. Firms advancing to stage two will be evaluated through interviews and presentations focusing on past performance, understanding of program requirements, and approach and methodology. The anticipated contract start date is March 2, 2027. Respondents must be legally registered in Florida and authorized to practice architecture, engineering, and landscape architecture under applicable state statutes. Mandatory submission requirements include a letter of interest, a Professional Qualifications Supplement, a project listing of relevant experience, current Florida licenses, and a completed Federal GSA Standard Form 330. All responses must be submitted in Adobe PDF format on a thumb drive to the Procurement Liaison, who serves as the sole point of contact. Selected firms must adhere to strict confidentiality requirements regarding building plans under Florida Sunshine laws and comply with all state building codes and fire safety standards.
Department of Management Services

POSTED

about 17 hours ago

DEADLINE

in 5 months
NAICS: 541310
New
SLED
Hillcrest Center Project Architectural Tenant Improvement And Renovation Services
Solicitation # 20261019042
The Conejo Recreation & Park District is soliciting architectural services for the Hillcrest Center Improvement Project located at 401 West Hillcrest Drive in Thousand Oaks, California. The primary scope of work involves preparing interior tenant improvement and renovation documents to create a multipurpose room, a public event center, and a therapeutic recreation space, as well as renovating adjacent outdoor areas with new decks and patio seating. An alternative scope of work is also available for the conceptual master plan development of undeveloped portions of the 61-acre property, including pedestrian trails and shaded gathering spaces. The selected consultant will be responsible for design development, working construction drawings, and cost estimates, ensuring all work complies with federal, state, and local regulations and is coordinated with the City of Thousand Oaks. Proposals are due by December 10, 2026, and must include a master original and three copies, a non-collusion affidavit, and a certified list of at least three references from the last three years. Award will be based on the most advantageous proposal, evaluating factors such as the proposed approach, qualifications of key personnel, experience with similar projects, and cost reasonableness. The contract requires comprehensive insurance coverage, including professional errors and omissions, general liability of at least 2 million dollars per claimant, and property damage limits of 5 million dollars. Payments are processed on a monthly basis within 30 days of acceptance by the District. The consultant must provide proof of insurance within 10 days of the award as a precondition to contract execution.
Conejo Recreation & Park District

POSTED

1 day ago

DEADLINE

in about 2 months
NAICS: 541310
New
SLED
Community Center & Town Hall Architectural Services
Solicitation # 2140054
The Town of Volney is soliciting architectural services for the development of a new Community Center and Town Hall located at 1445 County Route 6, Fulton, New York. The project scope encompasses five primary phases: schematic design, design development, preparation of construction documents, bidding and award assistance, and construction administration through closeout. The selected firm will be responsible for coordinating all architectural, engineering, technology, security, and interior design services, providing final deliverables in electronic PDF and editable CAD or Revit formats. The estimated total project budget is approximately 5,850,000 dollars, funded by a 4,674,320 dollar NY BRICKS grant and Town reserves. The contract term is three years, with the possibility of two one-year extensions. The selection process is based on a qualifications-based evaluation where fees are not reviewed initially. Firms are evaluated on public work experience, experience with NYS BRICKS or other grant agencies, project team qualifications, approach, and references. Once the highest-ranked firm is identified, the Town will open the sealed fee proposal to negotiate the scope and schedule. Applicants must submit their qualifications and a separately sealed fee proposal, including a signed non-collusion certification, by 3:00 p.m. on November 12, 2026. Requirements include compliance with New York prevailing wage laws, specific general liability insurance coverage of 1,000,000 dollars per occurrence, and a commitment to equal opportunity and nondiscrimination, with encouraged participation from certified MWBE and SDVOB firms.
Town of Volney

POSTED

1 day ago

DEADLINE

in 22 days
NAICS: 541310
New
SLED
Juvenile Services Center (JSC) Design and Construction Administration Services
Solicitation # 700626-27
Prince William County is soliciting proposals for professional architectural and engineering design, construction, and administration services to replace a functionally obsolete 1978 facility with a new Juvenile Services Center in Manassas, Virginia. The project scope encompasses the full design lifecycle, including programming, space planning, schematic and final design, field surveying, and assistance with bidding and evaluation. The resulting facility will provide an improved environment for youth in both secure and non-secure custody. The period of performance begins upon the Notice to Proceed and extends through twelve months after the issuance of the Project Final Completion Letter, with a project schedule spanning from September 2026 to August 2031. Proposals are due by October 26, 2026, and will be evaluated based on a 100-point scale focusing on the offeror's understanding of the scope, work plan, risk mitigation strategies, team qualifications, and relevant experience. Cost proposals are not required during the initial submission; instead, the County will request pricing only from the highest-ranked technical offerors. Selected contractors must meet stringent insurance requirements, including professional liability coverage of up to 5.5 million dollars for contracts exceeding 500,000 dollars, and must comply with ADA regulations, the State and Local Government Conflict of Interests Act, and E-Verify program requirements.
Prince William County BU

POSTED

1 day ago

DEADLINE

in 5 days
NAICS: 541310
New
International
Design and Contract Administration Services for New Vaughan Animal Services Facility
Solicitation # RFP26-309
The City of Vaughan is soliciting proposals for a multi-disciplinary consulting team, led by an Architectural Prime Consultant, to provide design and contract administration services for a new Animal Services Facility. Located at the Maple Nature Reserve site (10401 Dufferin Street) within the Oak Ridges Moraine Conservation Plan, the project consists of a two-storey building between 25,000 and 30,000 square feet. The facility will include public reception and education spaces as well as a public-facing spay/neuter clinic, with an estimated construction budget of 40 million dollars. The project will be delivered using a design-bid-build approach under a stipulated sum form of contract, and the successful consultant must adhere to the City of Vaughan Inclusive Design Standards. The selection process utilizes a cumulative scoring system based on technical and financial evaluations. Technical scoring includes key personnel, firm experience, work plans, and sustainable objectives, with a minimum 75 percent score required in the initial technical stage to advance to a mandatory interview and presentation. Financial proposals will only be opened for proponents who are within five points of the highest-ranked technical proponent. The resulting agreement will be based on the RAIC Canadian Standard Form of Contract for Architectural Services, Document Six, 2018 Edition. All submissions must be made electronically via the City's online bidding system by the deadline of November 18, 2026.
City of Vaughan

POSTED

1 day ago

DEADLINE

in 28 days

General Info

Contract Value

$0

NAICS

541310 - Architectural Services

Place of Performance

IL, USA

Set-Aside

SBP

Award Issued Date

Documents

3

Amendment+01.pdf

PDF

Regional+AE+Pre-sub+Mtg+Minutes.pdf

PDF

Regional+AE+PreSub+Q%26A.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

4 updates
PhaseClosed
Posted

Combined Synopsis

Notice updated

Notice details unchanged. Attachments may have changed.

Response Deadline

Deadline has passed

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

The notice description changed.

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeneral Services Administration → Pbs R5 Acquisition Management Division
Contacts2 people available
OfficeCHICAGO, IL, 60604, USA
Office AddressCHICAGO, IL, 60604, USA
Contacts
Justin Costello
Ashley McAvinew

Full Description

Show more
GSA PBS, Great Lakes Region 5 Supplemental Architect & Engineering Indefinite Delivery, Indefinite Quantity (IDIQ) Contract Request for Qualifications - 47PF0020R0004 Description: This contract will result in multiple, indefinite delivery, indefinite quantity (IDIQ) contracts to provide Region 5 with Architecture & Engineering and Engineering & Architect (AE/EA) services led by either an architectural or engineering firm. These services are to be consistent with the Guiding Principles of GSA's Design Excellence program http://www.gsa.gov/portal/category/21079 for a variety of project types across a wide range of project budgets. Assembled teams should be well rounded and clearly identify relevant concentrated areas of expertise. Architectural and Engineering Services will be rendered for projects located throughout all six states covered by GSA's Great Lakes Region, 5. This is an Indefinite Delivery Indefinite Quantity (IDIQ) contract to provide professional Architecture and Engineering Services for projects on or within federal properties and facilities, owned and/or leased, in Region 5 states of Illinois, Indiana, Ohio, Michigan, Minnesota, and Wisconsin. The NAICS codes are 541330 - Engineering Services, with a small business size standard of $15 million and 541310 - Architectural Services, with a small business size standard of $7.5 million. As this procurement is a - Partial Small Business Set-Aside. The lead firm must have an existing active production office within the states identified in the previous paragraph so as to minimize direct travel costs on resulting task orders, firms should also clearly delineate how coverage for all six (6) states will be managed to reduce direct travel costs on task orders. Most work orders will be executed for repair and alteration projects within existing buildings. The estimated cost of construction at award (ECCA) can range from $2,000 to approximately $3,095,000 (or the current Prospectus Project Threshold), however it is anticipated that the majority of projects will have an ECCA between $50,000 and $500,000. In accordance with Federal Acquisition Regulation (FAR) 15.404-4(c)(4)(i)(B), fees for design services cannot exceed 6% of the ECCA. For general guidance describing included and excluded services, in regards to the 6% fee limitation, see PIB 13-04 Attachment (1). A broad range of architectural and engineering disciplines/services may be required in order to accomplish the task orders under this contract. These may include, but are not limited to: Architecture Historic Preservation Mechanical Engineering Electrical Engineering Structural & Civil Engineering (evaluation and design) Plumbing Fire Protection Life Safety (evaluation and design) Security (evaluation and design) Seismic & Blast Interior Design Feasibility, pre-design, and project development studies Field investigation, Site surveys Concept design, Design development and Construction document development (both engineering and architectural) Constructability review and evaluation Management and inspection services during construction Pre-design services (pre-alteration assessment) Building standard document development Temperature control assessment and design BAS system assessment and integration Building and system commissioning Vertical Transportation Real Estate Market Analysis Hazardous material removal consultants. Please note that all of the above are not required team members. However, the offeror should select disciplines/services that round out and strengthen the firm/teams level of expertise to create a core team. In addition, firms/teams demonstrating the concentrated levels of expertise noted below will be judged more favorably (or given special consideration) over those proposals reflecting less similar experience: Fa'ade forensic evaluation for existing buildings (historic and contemporary) Historic masonry Contemporary masonry (concrete, cast stone etc) Curtain wall Historic building assessment, materials review and repair solution/remediation Water infiltration investigation and prevention (horizontal and vertical surfaces) Building condition survey evaluation reports (exterior and interior) Interior design Interior workplace solutions Space planning The duration of the base period will be one year. The contract will include a clause for four one-year options, each of which could extend the contract for an additional one year period and may be exercised at the option of the Government. The maximum order limitation is $5,000,000 for each one year period. The minimum guarantee for this contract is $2,500 for the base year only. The selected firms must negotiate overhead, profit and hourly rates for major anticipated disciplines to be used in negotiating fixed price task orders in phase II as described below. The AE/EA may be expected to handle multiple projects simultaneously, without compromising timeliness and quality of service to GSA. Professional services for task orders shall be overseen or performed by individuals licensed in the relevant discipline, with a current registration in the state in which the project's construction will occur. Joint ventures and/or consulting arrangements will be considered and evaluated on the demonstrated interdependency of the team members to provide a cohesive quality design effort. In order to encourage participation in this request for qualifications, one pre-submission teleconference has been scheduled for January 14, 2020. The call will commence at 2:00 PM CST. The meeting will be available via teleconference only. Attendance is completely voluntary and will not positively or negatively impact a team's evaluation. The purpose of the meeting is to answer any industry questions regarding this procurement. Those wishing to attend should RSVP to Justin Costello Contracting Officer, at justin.costello@gsa.gov. In the e-mail, please provide the names of those wishing to attend no later than January 13, 2020 2:00 PM (CST). A conference call-in number will be provided in your RSVP reply. TEAM SELECTION: Team selection is executed through a two-step process where the first step is qualification based and the second step is fee based. This notice is a Request for Qualifications only. No fee information is requested at this time. STEP I: In the first step, teams will submit qualification based on the criteria identified below. A source selection board will review each team's qualifications and establish a shortlist of firms. The shortlist may be composed of architect-led OR engineering-led teams OR a combination of both. The Government reserves the right to hold interviews with each of the short-listed firms to clarify and confirm submitted information. These interviews would be held in Chicago. EVALUATION FACTORS: I. Specialized Experience and Technical Competence (45%): Teams must demonstrate success in appropriately addressing a variety of complex as well as routine design issues for repair and alterations work similar in budget to those anticipated for task orders off of this IDIQ contract. If applicable, concentrated levels of expertise should be clearly highlighted and any specialized experience such as work in occupied buildings, building system upgrades, historic preservation, or other (previously noted in this solicitation) under the constraints of budget, schedule etc. should be clearly highlighted. Provide no more than ten (10) example projects. Each example may be supplemented with photographs, sketches and drawings (not to exceed 2 (two) double-sided pages). Standards for this Evaluation: This standard is met when: The team demonstrates success in appropriately addressing complex design issues such as unique requirements, designing buildings within community context, image, function, and scale. The team demonstrates innovation in design and construction approaches on a range of projects including but not limited to innovative building design solutions and efforts to achieve sustainable buildings using integrated multidisciplinary teams. The team demonstrates the ability to provide design services ranging from pre-design studies through construction administration. The team demonstrates the capacity to perform multiple projects at one time successfully. II. Management Plan, Team Structure and Quality Control (25%): Teams must demonstrate a clear and efficient management plan and team structure (which includes sub-consultants) that addresses roles and responsibilities, lines of authority, coordination and communication. Assembled teams should be well rounded and clearly demonstrate their ability to work together in a cohesive manner. The management plan should clearly describe: The team's overall communication approach The team's ability to staff and manage task orders on an as-needed basis; accounting for the unpredictable issuance of task orders in terms of number, size, importance and urgency. The team's plan for designing within a negotiated fee in accordance with the 6% fee limitation. Quality control methodology for overseeing the contract either as a single firm or with consultants. The person who will be responsible for overseeing project quality control should be identified. Plan for effectively and efficiently covering the entire region. Consideration will be given to teams that demonstrate a wide range of experience levels, in multiple disciplines, proving the ability to flexibly staff projects based on complexity and budget constraints. Team must demonstrate processes for quality control and commitment to quality control standards while designing within the project's budget and schedule limitations. The plan should specifically address coordination efforts with sub-consultants. Standard for this Evaluation: This standard is met when: The offeror submits a management plan that includes an organizational chart (showing names, titles, authorities, and responsibilities) illustrating key personnel. The organization chart should identify and address the number of personnel needed to accomplish all of the work requirements of the contract. The offeror clearly indicates what work will be subcontracted, lists the names of its major proposed subcontractors, and includes any commitments made with them. Subcontractors proposed by the offeror are qualified in their respective areas of work. The offeror proposes a quality control program which addresses all items as detailed in Section C.8.6 of the solicitation and includes a thorough, effective, and sound method of identifying, correcting (within acceptable timeframes), and preventing deficiencies in the quality of services delivered, using acceptable techniques and appropriate frequencies of inspection. III. Professional Qualifications (15%) Key Personnel must possess the education, qualifications and project experience that will provide the best opportunity for the successful completion of task orders under this contract. Include both a lead designer philosophy and an overall team design philosophy, they should be balanced and their intent/involvement for accomplishing task orders under this contract should be appropriate. Standard for evaluation: The standard is met when: The team demonstrates the quality of multi-disciplinary key personnel including but not limited to: lead designer(s), project manager/executive, architect(s), preservation specialist, change management consultant, and cost estimator. IV. Past Performance (15%) Teams must be able to demonstrate successful past performance on example projects. This can be from the point of view of the client, professional peers and project teammates. Demonstrated success at collaborative relationships with consultants will be positively considered. The Government has the right to use institutional knowledge when evaluating this factor. REQUIRED DOCUMENTS for QUALIFICATION SUBMISSION: Interested firms having the qualifications to meet these requirements are invited to submit one (1) electronic version, which should include the PDF copies of all the required documents including the Standard Form 330 along with a letter of interest. Additionally, please provide only the information requested supplemental information will not be evaluated. Required form 330 information/instructions: https://www.gsa.gov/forms-library/architect-engineer-qualifications The sf330 is available as an attachment to this notice and via the GSA Forms Library at the address identified above. Section C: Do not modify the form by providing more than six proposed team members. Prioritize team members and provide those that are the most important to creating the most well rounded team or show your concentrated areas of expertise. It is recommended that firms responsible for the majority of the work submitted in section F be included. Section E: Do not provide any more than 6 key personnel. You will have to prioritize and provide those that best represent your ability to accomplish the requirements of this contract. CEOs and other executive personnel should not be submitted unless they will have direct responsibility for accomplishing the task orders under this contract. It is required that you include the Lead Architectural/Engineering Designer and the Primary Point of Contact that would be responsible for managing this contract and assigning task orders. It is recommended that the Key Personnel directly responsible for work submitted in section F should also be included. Section F: Form can be modified. Each example project should be no more than 2 double sided pages. Photographs, sketches and drawings are strongly encouraged. Only provide 10 total example projects. Projects should demonstrate ability to successfully accomplish a wide range of project types, sizes and budgets. Majority of projects should be constructed; all should be designed within the last 5 years. 3 out of the 10 have to be directly attributable to the Key Designer or Engineer. Section G: Only indicate that Key personnel participated in example projects when they will be performing the exact same role on this contract. Section H: 1. Management Plan (not to exceed 3 single-sided pages) to include the team's overall Management Philosophy and Intent including project assignment, communication, roles and responsibilities, etc. 2. Quality Control Plan (not to exceed 5 single-sided pages) - providing services within the negotiated fee in compliance with the Brooks Act (see attachment PBS Procurement Instructional Bulletin PIB 13-04), meeting design schedule, designing a project within budget, plan for managing and scheduling the Government's unpredictable issuance of task orders in terms of number, size and urgency, plan for efficiently covering the entire Region 5 area including locations where work will be accomplished. Plans should be tailored directly to this procurement. 3. Past Performance Documentation (for each sample project submitted in section F): Provide copies of any performance evaluations or owner review of firms performance, provide an accessible owner point of contact including name, title, address and current phone number, provide copies (or listing) of awards, provide copies of letters of appreciation/commendations 4. Lead Designer and Teams Design Philosophy and Design Intent (not to exceed 2 single-sided pages) All responsive offers will be considered. This is not a request for proposal. The government intends to award multiple contracts from this notice but reserves the right to vary that number based on number and quality of submissions. The prime contractor must be registered in the System for Award Management (www.sam.gov). STEP II - Please note, these documents are not required at this time; they will be requested at a later date, if necessary. After the interviews are complete, firms on the short-list will be required to submit the following documents: Labor rates for all pertinent categories/job titles (base rates only, not loaded) for the firm and all subcontractors (to be submitted on a GSA Form 2630). Current report from payroll accounting system to include: explanation of pay period and a list to include employee name, corresponding labor category and salary or hourly rate for those employees that will be working on the Contract (base rates only, not loaded). Overhead rates (to be submitted on a GSA Form 2630). Financial reports that outline the direct and indirect expenses of the firm. The report should allow GSA to determine what expenses are classified as direct or indirect and used in the computation of the overhead rate. The report shall cover the firm's last completed fiscal year and shall illustrate how you have computed your overhead rate. The following are a list of firms that have been shortlisted for this Request for Qualifications No. 47PF0020R0004 Kaczmar Architects Incorporated Attn: Christopher Kaczmar 1468 West Ninth Street, Suite 400 Cleveland, OH 44113 Grumman Butkus Associates Attn: John Tsingas 820 Davis St., Suite 300 Evanston, IL 60201 Interactive Design, Inc. Attn: Charles Young 308 West Erie St., Suite 506 Chicago, IL 60654 KOO LLC Attn: Dan Rappel 55 W. Wacker Drive, Suite 600C Chicago, IL 60601 Wiss, Janney, Elstner Associates, Inc. Attn: Kenneth Itle 330 Pfingsten Road Northbrook, IL 60062 Leo A. Daly Attn: Leif Eikevik 730 Second Avenue South, Suite 1300 Minneapolis, MN 55402 Exp U.S. Services Inc. Attn: Jefrey Jakalski 205 N. Michigan Avenue, Suite 3600 Chicago, IL 60601 bKL Architecture Attn: Thomas Kerwin 225 N. Columbus Dr., Suite 100 Chicago, IL 60601 Seven Generations Architecture and Engineering Attn: Jeremy Berg 600 East Michigan Avenue, Suite B Kalamazoo, MI 49007 Bailey Edward Design, Inc. Attn: Christopher Heaney 35 E. Wacker Drive Chicago, Illinois 60601-2308 The following are a list of firms that have been awarded contracts under this Request for Qualifications No. 47PF0020R0004. The contract numbers are listed below each firm listing. Bailey Edward Design, Inc. Attn: Christopher Heaney 35 E. Wacker Drive Chicago, Illinois 60601-2308 47PF0020D0027 Leo A. Daly Attn: Leif Eikevik 730 Second Avenue South, Suite 1300 Minneapolis, MN 55402 47PF0020D0031 Grumman Butkus Associates Attn: John Tsingas 820 Davis St., Suite 300 Evanston, IL 60201 47PF0020D0028 Interactive Design, Inc. Attn: Charles Young 308 West Erie St., Suite 506 Chicago, IL 60654 47PF0020D0029 KOO LLC Attn: Dan Rappel 55 W. Wacker Drive, Suite 600C Chicago, IL 60601 47PF0020D0030 Wiss, Janney, Elstner Associates, Inc. Attn: Kenneth Itle 330 Pfingsten Road Northbrook, IL 60062 47PF0020D0026

More opportunities from General Services Administration → Pbs R5 Acquisition Management Division

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS