Guadalupe River Bridge Replacement Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Guadalupe River Bridge Replacement Project in San Jose involves replacing the aging 1935 wooden northbound trestle bridge with a new 265-foot concrete structure while extending the 1990 concrete southbound bridge by 90 feet and widening the river channel by approximately 75 feet to connect with the existing Santa Clara Valley Water District’s Reach 6 Bypass channel downstream. These improvements aim to enhance structural safety, accommodate future rail needs, and mitigate flood risks. Construction is expected to take about two years and is scheduled to begin in 2022, with key environmental and permitting activities continuing into 2026. The Peninsula Corridor Joint Powers Board is amending an existing encroachment permit to allow for pruning in the Reach 6 floodplain using hand tools, extending work hours into the evening during dry seasons for staging and logistics, and conducting early site preparation below the riverbank to facilitate river diversion infrastructure. Separately, an additional encroachment permit is being issued to implement the Habitat Mitigation and Monitoring Plan, which includes grading, planting, and other habitat enhancement initiatives on Valley Water right-of-way to offset environmental impacts. These efforts are coordinated through Valley Water and the Peninsula Corridor Joint Powers Board, with oversight from key personnel including Michael Martin of Valley Water and Michael Tauchen of Caltrain. The project is located in San Jose, California, with all activities confined to specified easements and property owned by Valley Water, and is being pursued under the framework of environmental compliance and long-term infrastructure resilience.

General Info

Replace aging bridge, extend southbound span, widen river channel, enhance safety, mitigate floods, begin 2022, two-year construction.

Agency

California → Peninsula Corridor Joint Powers Board

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Willow St, Delmas Ave, Virgina St, Mclellan Ave, San Jose, CA, 95110

Set-Aside

NONE

Documents

(1)

NOD_Guad Rvr RR Bridge_Amendment

ZIP

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Peninsula Corridor Joint Powers Board
Contacts2 people available
OfficeN/A
Organization / Agency
California → Peninsula Corridor Joint Powers Board
Office AddressN/A
Contacts
Michael MartinSenior Water Resources Specialist
Michael TauchenDeputy Director, Environmental Compliance

Full Description

Show more
Caltrain operates on two tracks over the Guadalupe River in San José. The northbound track is on a wooden trestle bridge constructed in 1935 and the southbound track is on a concrete bridge constructed in 1990. To address safety issues and protect the bridges, the 187-foot northbound bridge will be replaced with a new, 265-foot concrete bridge; the southbound bridge extended by 90 feet, and the channel widened by approx. 75 feet to create a connection to the existing Santa Clara Valley Water District’s Reach 6 Bypass channel which exists downstream of the project. Construction of the project is estimated to take approximately two years and is expected to begin in 2022. Valley Water is amending an existing encroachment permit that allows the Peninsula Corridor Joint Powers Board (JPB) to construct the improvements on Valley Water fee title property and easements and use Valley Water property for staging. The permit amendment is for pruning using hand tools in the Reach 6 floodplain starting in April/May 2026; extension of the work period during the dry season to up to 11 p.m. to allow for refueling, material delivery, and staging for the next day's work within the existing staging areas; and, for early site preparation below the top of bank for river diversion installation. Valley Water is also issuing an encroachment permit to allow construction and installation of the Habitat Mitigation and Monitoring Plan (HMMP) improvements for the project which will include grading, planting, and habitat enhancement features on Valley Water right of way.