Guajome Lake Homes
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The project involves the development of 83 single-family homes on a 16.78-acre site in Oceanside, California, with approximately 9.86 acres designated for construction and the remaining 6.92 acres preserved as open space to protect a riparian corridor. Four of the homes, representing 5% of the total, are designated as deed-restricted affordable housing and will be evenly distributed throughout the community to comply with California’s Density Bonus Law and local zoning provisions. The project seeks waivers from standard development requirements including reduced lot sizes, elimination of equestrian standards, adjusted setbacks, lower open space minimums, increased floor area ratios, and higher retaining walls to accommodate the density bonus. Average lot sizes will be approximately 3,200 square feet, with homes ranging from 1,869 to 2,220 square feet, each featuring a two-car garage and additional private parking for two vehicles. Primary access will be through Guajome Lake Road, which will be widened to 40 feet curb-to-curb including parkways and sidewalks, while internal roads will be 28 to 32 feet wide with 5-foot sidewalks. Construction will be limited to the southern portion of the site, which has been previously disturbed, with the existing residence to be removed. The development includes a central 35,151-square-foot private recreational area with lawn spaces, a play area, and a culinary lounge. Environmental compliance is governed by CEQA, with strict construction timing restrictions prohibiting ground-disturbing activities from March through September to protect wildlife, mandatory use of fully shielded low-pressure sodium lighting, prohibited fueling near drainages, native vegetation replanting, and a biologist-monitored wildlife protection program. Work hours are limited to daylight, with night work permitted only under controlled lighting conditions. Stormwater management, dust control per SDAPCD Rule 55, and adherence to the San Diego County Hydrology Manual and NFPA guidelines are required. The project’s period of performance spans from June 2023 to December 2024, with phased construction including site preparation, grading, building, paving, and architectural coating. No federal contract clauses, pricing details, or procurement-specific terms are present, as the documentation pertains to land use approval and environmental compliance rather than a federal procurement action.
General Info
Agency
NAICS
Place of Performance
Guajome Lake Road and Albright Street, Oceanside, CA, 92057Set-Aside
Timeline
Organization & Contact Information
Interested Companies (1)
Full Description
Similar Contracts
Same NAICS industry code
