Guatemala - Hybrid Photovoltaic Solar System
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The acquisition seeks the design and implementation of a single hybrid solar system for the Office of Immigration Assistance in Valle Nuevo, Jutiapa, Guatemala, to ensure uninterrupted power for critical immigration and border control operations, which rely on approximately 3,000 kWh of energy per month from computer systems, servers, lighting, and administrative equipment. The system must include photovoltaic generation with monocrystalline HPBC/TOPCon solar panels rated at 550–580 W, 21.3–23% efficiency, 144 half-cells, and a 1500 V DC maximum system voltage, mounted on a tempered glass and anodized aluminum frame with an IP68 junction box, capable of operating in temperatures from -40°C to +85°C. It must be paired with a lithium battery bank and a three-phase hybrid inverter, integrated with the existing electrical grid to mitigate frequent voltage fluctuations and outages common in border regions. Detailed design documentation is required, including PVsyst simulations, structural frame calculations, single-line diagrams, and verification of actual power load and critical backup runtime. The project is a firm-fixed-price contract with a strict 60-day completion timeline from the notice to proceed, requiring all work to be fully installed, tested, and operational within that period. Subcontractors are governed by FAR clauses mandating commercial service compliance and protection against contracting with excluded entities. All proposals must be submitted electronically in three bound volumes adhering to strict formatting requirements: no more than fifteen pages in 14-point Times New Roman font, in PDF format under 30MB per file, and in English. Offerors must be registered in SAM.gov, submit a completed SF-1442, Section K representations and certifications, W-14 form, and proof of SAM registration prior to the August 4, 2026 deadline. Technical acceptability is evaluated on feasibility, practicality, and appropriateness of the proposed approach, alongside past performance, delivery schedule, integrity record, organizational capacity, and after-sales service including warranties and maintenance. Award will be made on a lowest-priced, technically acceptable basis on an all-or-none basis, and payment terms follow FAR 52.232-5, with invoices processed monthly through a government payment platform. VAT must be separately listed on invoices and sourced from Guatemala’s SAT portal, and the contractor is responsible for timely payment to subcontractors. Additional requirements include submitting insurance, safety
General Info
Agency
NAICS
Place of Performance
Guatemala, GT-GU, GTMSet-Aside
Timeline
Response Deadline
Organization & Contact Information
Full Description
The central aim of this acquisition initiative is the design and implementation of a hybrid solar system in the Office of Immigration Assistance located on the border of Valle Nuevo, Jutiapa, to guarantee operational continuity, energy efficiency and institutional sustainability in a strategic installation of the Government of Guatemala, that fulfill or exceed the requirements of the
statement of work (SOW) detailed in this document.
The office has an energy demand of approximately 3,000 kWh per month, mainly derived from computer systems, servers, lighting and administrative support equipment essential for immigration care and border control.
Due to the critical nature of the operations carried out in this facility, it is essential to have a reliable energy system that allows services to be kept running during power outages, voltage variations or failures in the public grid.
Border facilities are usually located in areas where the following may occur voltage variations, power outages, or instability of supply.
Similar Contracts
Same NAICS industry code
More opportunities from Department Of State → Usembassy Guatemala City
Same awarding agency
