Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of The Interior was posted on June 6, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

H--GRBA 316191 Rehabilitate Deteriorated Wastewater Collection and Water Distribution System CMR Services.

Awarded
140P2024F0231Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
Federal
PMCP-SS_RFP
Solicitation # H9240226RE005
Solicitation H9240226RE005 is a Small Business Set Aside request for proposal issued by HQ USSOCOM to secure program and product management support for the Program Manager Counterproliferation (PMCP) Service Support contract. The scope of work includes technical and engineering support, development, training, and acquisition services for missions involving Counterproliferation, Counter RCIED, Explosive Ordinance Disposal, Multi-Mission Electron Countermeasures, Electromagnetic Warfare, and Counter Unmanned Systems. The contract is structured as an IDIQ with a period of performance from June 21, 2027, to June 20, 2032, utilizing a mix of Firm Fixed Price for CONUS labor and Cost Plus Fixed Fee for OCONUS labor, event support, and other direct costs. The government will employ a best-value performance-price tradeoff process for award. Technical Approach is a pass/fail threshold factor; only proposals rated Acceptable will proceed to a tradeoff between Past Performance and Price. To access restricted solicitation documents, interested vendors must submit a signed Non-Disclosure Agreement and verify a CMMC 2.0 Level 2 self-assessment score of 110 in the Supplier Performance Risk System. Proposals are due by November 6, 2026, and must be submitted electronically via the PIEE Solicitation Module. Performance will be monitored through a Quality Assurance Surveillance Plan focusing on workforce management, mission support, reporting, and government-furnished property management.
Hq Ussocom

POSTED

about 6 hours ago

DEADLINE

in 14 days
NAICS: 541330
New
Federal
FDRMC ENGINEERING SUPPORT SERVICES
Solicitation # N6817126RN005
The Department of Defense, through the Navsup Flc Sigonella Naples Office, is soliciting proposals for FDRMC Engineering Support Services under a Cost Plus Fixed Fee task order via SeaPort NxG. This unrestricted solicitation, number N6817126RN005, requires the contractor to provide full-time equivalent on-site technical support personnel to the Forward Deployed Regional Maintenance Center and various ships within its area of responsibility. The scope of work includes installation, maintenance, assessment, troubleshooting, repair, testing, training, and logistics support for shipboard systems, specifically focusing on engineering technicians for mechanical auxiliary, hydraulics, gas turbines, and combat systems, as well as production support for long-range repair planning and specification development. The contract structure consists of a base period and four option periods, with an additional six-month extension, totaling an estimated effort of 96,096 man-hours. Performance is primarily located in Capodichino, Campania, with specific labor requirements for Bahrain and Rota. Due to the nature of the work, personnel must hold a Secret security clearance, while Combat Systems Technicians for CANES/Afloat Network require Top Secret clearance and SIPRnet access. Award will be based on best value, utilizing a two-phased evaluation process that assesses facilities security clearance and essential services compliance before evaluating technical approach, management, personnel, transition plans, past performance, and cost. Performance will be monitored via a Quality Assurance Surveillance Plan using methods such as 100 percent inspection and random sampling to ensure compliance with Joint Fleet Maintenance Manual and OSHA standards.
Navsup Flc Sigonella Naples Office

POSTED

about 6 hours ago

DEADLINE

in 10 days
NAICS: 541330
New
SLED
Pine Avenue Revitalization & Pedestrian Improvement Project (Fourth Street to Fifth Street)
Solicitation # 20261022049
The City of Holtville is soliciting proposals for Resident Engineer Construction Management (RE/CM), labor compliance, and inspection services for the Pine Avenue Revitalization and Pedestrian Improvement Project. Located on Pine Avenue between Fourth and Fifth Streets, the project focuses on replacing non-ADA-compliant or missing sidewalks to create a safe walking path to the Holtville Skate Park and Alamo River Trail. The construction phase is estimated to last 90 calendar days, tentatively scheduled from December 21, 2026, to March 19, 2027, with the consultant expected to provide approximately 70 days of onsite work and 20 days of administrative office work. Selection will be based on the consultant's fee, qualifications, and understanding of the project, with final determination made by the Holtville City Council. The chosen consultant must adhere to Caltrans Local Assistance Procedures Manual (LAPM) guidelines, FHWA requirements, and the City of Holtville Quality Assurance Program. Key requirements include the use of Caltrans-certified laboratories and testers for geotechnical work, compliance with California Labor Code Section 1775 for prevailing wages, and the provision of performance and payment bonds. Proposals must be submitted by November 4, 2026, including a cost proposal based on Caltrans LAPM Exhibit 10-H Example 1, and provided both in a three-ring binder and as a PDF on a USB drive.
City of Holtville

POSTED

about 6 hours ago

DEADLINE

in 12 days
NAICS: 541330
New
SLED
Facilities Condition Assessment
Solicitation # 27-RFP-PW-545
The City of Gilroy Public Works Department is soliciting proposals for a Comprehensive Facilities Condition Assessment of various municipal buildings under solicitation 27-RFP-PW-545. The objective is to obtain detailed data on the physical condition, maintenance needs, and long-term planning requirements of these facilities, including a review of ADA accessibility and compliance with current fire, building, and safety codes. The selected consultant must complete the scope of work within five months from the notice to proceed and provide deliverables that include supporting documentation and a presentation for the City Council. All data findings must be delivered in accordance with ASTM Uniformat II Classification Codes for Building Elements, and any civil engineering reports must be prepared by a licensed civil engineer. Proposals are due by 2:00 PM on November 19, 2026, and must be submitted via email to Carina Baksa. Submissions must be provided in separate PDF files for the proposal and the fee schedule, with the proposal limited to 30 single-sided pages using at least 12 pt. font. The City will evaluate consultants based on their experience, quality of work, project approach, and ability to meet the five-month schedule. The contract will be a Professional Services Agreement paid on a time and expense basis with a maximum not-to-exceed fee. Awarded contractors must comply with State Prevailing Wage Laws for applicable work and adhere to the insurance and indemnification requirements specified in the City's standard agreement.
City of Gilroy

POSTED

about 6 hours ago

DEADLINE

in 27 days

General Info

NAICS

541330 - Engineering Services

Place of Performance

CO

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseAwarded
Posted

Award Notice

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Dsc Contracting Services Division
Contacts1 person available
OfficeDenver, CO, 80225, USA
Office AddressDenver, CO, 80225, USA
Contacts

Full Description

Show more
GRBA 316191 Rehabilitate Deteriorated Wastewater Collection and Water Distribution System CMR Services.

More opportunities from Department Of The Interior → Dsc Contracting Services Division

Same awarding agency

NAICS: 237990
New
Federal
Y--Timucuan Ecological and Historic Preserve TIMU-335
Solicitation # 140P2026R0081
Solicitation 140P2026R0081 is a Small Business Set-Aside, Firm-Fixed-Price contract issued by the National Park Service for the stabilization of the Kingsley Plantation shoreline at the Timucuan Ecological and Historic Preserve in Jacksonville, Florida. The project, with an estimated construction magnitude between $1 million and $5 million, involves three primary components: the selective demolition and installation of a new weatherable rigid vinyl sheet pile wall with tie rods and a deadman wall, the eastward extension of the wall using structural FRP composite sheet piles, and comprehensive site restoration including excavation, backfilling, sodding, limestone riprap installation, and spartina sea grass restoration. The mandatory performance period is 259 calendar days, with work required to begin within 10 days of award. The government will utilize the Best Value Continuum Tradeoff Process for award, where non-price factors—specifically technical approach, schedule, and management approach—are significantly more important than price. Contractors must adhere to strict environmental protection protocols to protect marine mammals and endangered species, and comply with the Davis-Bacon Act and various ASTM standards for recycling and packaging. Key requirements include the submission of a Contractor Quality Control plan, the assignment of specific key personnel, and the provision of performance and payment bonds. Invoicing must be processed electronically through the U.S. Department of the Treasury's Invoice Processing Platform following a draft review by the Contracting Officer's Representative.
Other Heavy and Civil Engineering Construction

POSTED

1 day ago

DEADLINE

in 21 days
View Details
NAICS: 237310
Federal
Z--BRCA 310427 Southbound Shuttle Stop
Solicitation # 140P2026R0065
Solicitation 140P2026R0065 is a small business set-aside for the construction of the Southbound Shuttle Stop at Bryce Canyon National Park, Utah. Managed by the National Park Service Denver Service Center, this firm-fixed-price contract has an estimated value between $1,000,000 and $5,000,000. The scope of work includes shuttle stop improvements, the addition of lanes, culvert installation, trail realignment, retaining wall construction, ADA ramp and sidewalk installation, and the placement of shelters and MUTCD-compliant signage. Due to the project's location, the contractor must implement protective measures for the adjacent UT Prairie Dog Habitat and ensure all equipment is clean and free of contaminants. The performance period is scheduled from May 1, 2027, to September 28, 2027, with a total duration of 150 calendar days following the notice to proceed. Award will be determined using the Best Value Continuum Tradeoff Process, evaluating technical approach, schedule, project experience, key personnel, and past performance alongside proposed pricing. Requirements include the submission of bid, performance, and payment bonds, compliance with Davis-Bacon Act wage determinations, and adherence to OSHA safety standards. Proposals must be submitted electronically in separate technical and price volumes, with a final response deadline of November 3, 2026.
Highway, Street, and Bridge Construction

POSTED

7 days ago

DEADLINE

in 11 days
View Details
NAICS: 221320
Federal
Y--GRCA 257282 - Replace Wastewater Plant at South Ri
Solicitation # 140P2026R0101
Solicitation 140P2026R0101 is an unrestricted full and open competition Invitation for Bid issued by the National Park Service, DSC Contracting Services Division, for the replacement of the South Rim Wastewater Treatment Plant at Grand Canyon National Park, Arizona. The project involves the construction of a GD Membrane Bio-Reactor wastewater treatment plant, including new treatment facilities, administrative and support buildings, and process systems. The scope of work encompasses complete demolition and removal of existing infrastructure, site preparation, grading, paving, fencing, and improvements to the facility access road. The project is estimated to exceed 100 million dollars, with a period of performance from February 1, 2027, to February 1, 2030, and a revised assumed Notice to Proceed date of April 1, 2027. The government will utilize a multi-factor, best-value tradeoff process for award, evaluating technical experience, technical approach, key personnel experience, and price. Key requirements include the provision of performance and payment bonds, adherence to union prevailing wage rates, and a 12-month operational support period following construction. Technical specifications emphasize strict cybersecurity hygiene for SCADA/MES equipment, full government rights to supplied software and source code, and compliance with ADA standards. Proposals must be submitted electronically in separate volumes, with specific evaluations focusing on the contractor's ability to manage complex wastewater plant commissioning and regulatory approvals.
Sewage Treatment Facilities

POSTED

7 days ago

DEADLINE

in 26 days
View Details
NAICS: 237110
Federal
Y--HAVO 326181 Rehabilitate Rainshed&Water Treatment
Solicitation # 140P2026R0091
Solicitation 140P2026R0091 is a firm-fixed-price construction contract issued by the National Park Service Denver Service Center to rehabilitate the Rainshed and Water Treatment System at Hawaii Volcanoes National Park. The project scope includes the rehabilitation of the rainwater catchment and water treatment systems, the replacement of Building 43 with a new metal building, and the replacement of Building 241 with a new open-air and CMU structure. Additional optional requirements include replacing the perimeter fence, repairing the water treatment system, and replacing ground catchment pavement. The project has a mandatory performance period of 610 calendar days, with primary CLINs scheduled from November 1, 2026, to July 3, 2028. The government will award the contract using a best value tradeoff process, evaluating non-price factors such as project experience, technical approach, management approach, and construction schedule against proposed pricing. Bidders must comply with the Davis-Bacon Act for prevailing wages and adhere to Buy American Act and Build America Buy America standards. Technical requirements include ADA compliance, the implementation of a Quality Control Plan, and adherence to specific environmental standards regarding ozone-depleting substances and recycled content. Due to the site's nature, the project involves Section 106 mitigation for historic buildings and requires careful construction phasing to ensure water production is not compromised. Proposals must be submitted electronically, and the awardee will be required to provide performance and payment bonds within 10 days of award.
Water and Sewer Line and Related Structures Construction

POSTED

10 days ago

DEADLINE

in 14 days
View Details
NAICS: 237310
Federal
Z--YELL 338223 - Bridge Preservation
Solicitation # 140P2026R0073
Solicitation 140P2026R0073 is a Small Business Set-Aside for bridge preservation services at Yellowstone National Park, Wyoming, managed by the National Park Service Denver Service Center. The project involves the rehabilitation of three specific bridges: Lava Creek, Thumb Creek, and an Unnamed Creek bridge. The scope of work includes concrete spall and structural repairs, crack sealing, stone masonry repointing, bridge expansion joint maintenance, painting of railings, and the application of epoxy overlays via hydro-demolition. Additional requirements include erosion repair, pavement markings, and strict traffic control. The anticipated period of performance is 155 calendar days from the Notice to Proceed, with an estimated contract value between $1 million and $5 million. The contract will be awarded using the Best Value Continuum Tradeoff Process, where non-price factors—specifically technical approach, project experience, key personnel, and past performance—are significantly more important than price. Required key personnel include a Site Superintendent with at least five years of experience and OSHA 30 certification, and a Traffic Control Supervisor with three years of experience meeting MUTCD standards. Contractors must adhere to strict work hour restrictions from 7 AM to 7 PM and comply with environmental protections for wildlife and cultural resources. Performance and payment bonds are required at 100 percent of the contract price, and the project is subject to Davis-Bacon Act labor standards. Proposals are due by October 30, 2026.
Highway, Street, and Bridge Construction

POSTED

10 days ago

DEADLINE

in 7 days
View Details
NAICS: 237110
Federal
Y--GRTE 237343 - Rehab 4 Lazy F Ranch
Solicitation # 140P2026R0098
Solicitation 140P2026R0098 is a Total Small Business Set-Aside for the rehabilitation of the historic 4 Lazy F Ranch in Grand Teton National Park, Wyoming, to provide employee housing. The project scope includes the comprehensive rehabilitation of one lodge, eight cabins, one garage, two outbuildings, and a water well structure. Key technical requirements involve structural repairs, historic preservation, and the installation of new potable water and wastewater systems, including a sanitary sewer collection system and lift station. The project is estimated to exceed 10 million dollars and has a mandatory negotiable performance period of 170 calendar days, with work beginning within 10 days of award. The procurement will be awarded using the Best Value Continuum Tradeoff Process, where non-price factors—technical approach, project experience, schedule, and past performance—are collectively equal in importance to price. Contractors must adhere to strict environmental and safety standards, including the management of lead-based paint and asbestos, compliance with the Davis-Bacon Act, and mitigation of impacts on bald eagle nesting and roosting bats. Proposals must be submitted electronically by November 20, 2026, and must include a detailed technical approach and a phasing plan to minimize park operational disruptions. Required insurance includes general liability of 500,000 dollars and employer liability of 100,000 dollars.
Water and Sewer Line and Related Structures Construction

POSTED

18 days ago

DEADLINE

in 28 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS