Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

HAB Field Sample Collection and Logistics Support

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Department Of The Interior → National Operations CenterView Agency

NAICS

541620 - Environmental Consulting ServicesView NAICS

Place of Performance

CO

Set-Aside

NONE

Documents

This scope was carved out of 140L0626Q0013.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Blanket Purchase Agreement (BPA) Water Testing Har

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → National Operations Center
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of The Interior → National Operations Center
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Collect live grab water samples from public lands across the Western U.S., label, document, and ship overnight on ice to the contracted laboratory.

Similar Contracts

Same NAICS industry code

NAICS: 541620
New
International
North Red Deer River Water Services Commission (NRDRWSC) - RFEOI Conceptual Roadmap for Regional Water Utility Planning, Capacity Governance, Rate Modelling and Water Licence Renewal
Solicitation # AB-2026-05978
The North Red Deer River Water Services Commission is seeking Expressions of Interest from qualified firms and advisors to provide market feedback on a proposed multi-stage program for regional water utility planning. This non-binding consultation is intended to inform future procurement strategies and project development rather than award a contract. The program focuses on modernizing the Commission's long-term planning framework, updating capacity allocation and governance, reviewing cost-of-service and rate-setting methodologies, and preparing for the provincial water licence renewal due in 2031. The Commission is specifically requesting input on four key work packages: future water demand assessment and licence renewal foundations, capacity-allocation governance, cost-of-service and financial planning, and regulatory support for the licence application. Interested parties, including engineering firms, utility consultants, and financial advisors, should submit a PDF response by September 29, 2026. Submissions should include a firm profile, relevant experience, and feedback on the conceptual roadmap, including indicative budgets and suggested project sequencing.
North Red Deer River Water Services Commission (NRDRWSC)

POSTED

about 14 hours ago

DEADLINE

in about 1 month
View Details

More opportunities from Department Of The Interior → National Operations Center

Same awarding agency

NAICS: 237990
New
Federal
Y--GARNET HILL RECREATION AREA CONSTRUCTION
Solicitation # 140L0626B0006
The U.S. Department of the Interior, through the National Operations Center in Denver, Colorado, is soliciting bids for the Garnet Hill Recreation Area Construction project in White Pine County, Nevada, approximately six miles west of Ely. This total small business set-aside under FAR 19.5 is designated for NAICS code 237990, with a small business size standard of $45 million, and is restricted to qualifying small businesses. The solicitation, issued as an Invitation for Bid (IFB), requires all offerors to maintain an active registration in SAM.gov with a valid Unique Entity ID (UEI) at the time of submission. The contract involves comprehensive improvements to access roads, trailheads, campgrounds, parking areas, picnic sites, vault toilets, signage, and ADA-accessible amenities, supported by detailed civil, topographic, and site-specific drawings including demolition, grading, and road plan sheets, with specifications organized under the CSI/CSC Masterformat system. Deliverables include a subcontract list, field condition reports, operation and maintenance manuals, and a quality control plan that must be submitted for approval prior to construction, though its associated costs are to be included in the bid price without separate payment. The work must be completed by December 2027, with milestones tied to the notice to proceed, substantial completion, and final completion dates. Contractors are required to comply with stringent material handling and storage protocols, including labeled and tested steel reinforcement stored elevated and protected from contamination, and waterstops kept under cover from environmental damage. All welding must be certified through AWS-compliant procedure specifications and qualification records, and manufacturers must provide written certifications of compliance on official letterhead. A stormwater pollution prevention plan must be prepared in accordance with local and contractual requirements, and daily site cleaning following NFPA 241 standards is mandatory. Life safety systems cannot be disabled without seven days’ prior written notice to the owner. Submittals must conform to strict electronic formatting: submitted as a single indexed PDF package with a transmittal form and labeled files containing project name, date, and firm identification, while hard copies of manuals must be bound in white, commercial-quality, vinyl-covered, 3-ring loose-leaf binders. Bonding requirements include bid, performance, and payment bonds, and key personnel roles must be clearly designated. The contracting officer, Lisa McKeon, must be contacted via email for all submissions, with proposals due no later than August 5, 2026.
Other Heavy and Civil Engineering Construction

POSTED

about 18 hours ago

DEADLINE

in 18 days
View Details
NAICS: 236220
New
Federal
Z--GAOA VALE DISTRICT OFFICE BUILDING RENOVATIONS D-B
Solicitation # 140L0626R0009
The U.S. Department of the Interior’s Bureau of Land Management, through its National Operations Center, is seeking industry input for the design-build renovation and addition of the BLM Vale District Office located at 100 Oregon Street, Vale, Oregon. This pre-solicitation under solicitation number 140L0626R0009 targets commercial and institutional building construction services under NAICS code 236220 and is structured as a design-build procurement, with an anticipated notice to proceed in December 2026 and full performance completion expected within 720 days thereafter. The project includes the renovation of a 16,320-square-foot existing single-story office building and the addition of a 1,051-square-foot front extension, along with associated site work, utility upgrades, topographical and geotechnical surveys, and inventory of government-owned systems furniture stored in Troutdale and Vale, Oregon. Design deliverables must adhere to progressive phases—Pre-Design, Schematic Design, Design Development, and Construction Documents—with draft submissions at each stage required to be 70 to 80 percent complete and fully coordinated to enable meaningful government review. All design and construction must comply with the 2024 International Building, Plumbing, and Mechanical Codes, ASHRAE 90.1-2019 Appendix G for energy modeling, the US National CAD Standard for drawings, and AWS D1.1 for structural steel welding. The contractor must also meet indoor air quality standards using SMACNA guidelines, install CAT 6 telecommunications infrastructure, and incorporate ADA and ABA accessibility requirements into all site elements, signage, and ramps. Contractors are required to submit comprehensive documentation including MasterFormat-organized specifications, coordinated design and construction schedules, as-constructed drawings, and an operations and maintenance manual upon project closeout. Monthly reporting is mandated via a concise one-page email update to the Contracting Officer, Contracting Officer’s Representative, and technical representative, detailing the status of all work tasks as started or complete. Additionally, a Microsoft Teams collaboration site must be established for communication. Daily quality control reports must be maintained by the Quality Control Supervisor, and all test reports must be completed by the individuals performing the tests, subject to government-directed testing locations. The contractor assumes full responsibility for temporary climate control until final acceptance, must install new air filters prior to final inspection, and ensure equipment warranties commence only after final acceptance. Bid, performance, and payment bonds are
Commercial and Institutional Building Construction

POSTED

4 days ago

DEADLINE

in 8 days
View Details