Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Handrail Refurbishment

Open
International
Response DeadlineDue in 50 days

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Documents

This scope was carved out of ENPR/LCNP/2714.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Refurbishment of Craigton Point Light

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Due in 50 days

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 1 document on the prime contractFrom Refurbishment of Craigton Point Light
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyNorthern Lighthouse Board
ContactsNo contacts available
OfficeN/A
Organization / AgencyNorthern Lighthouse Board
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Refurbishes existing balcony handrails for prime contractors on Northern Lighthouse Board (NLB) projects. Cleans, treats, and repairs existing handrails to support a relocated sector lantern using metal treatment, painting, and welding equipment. Adheres to metalwork and painting standards. Delivers a refurbished and structurally sound handrail.

Similar Contracts

Same NAICS industry code

NAICS: 238990
New
Federal
EBMUD – SD-462 – Secondary Reactors Rehab. – Phase 2
Solicitation # SD-462
The EBMUD Secondary Reactors Rehabilitation Phase 2 project, solicitation SD-462, is a comprehensive infrastructure project at the Main Wastewater Treatment Plant in California. The scope of work involves the rehabilitation of covered and open concrete structures, the relining, modification, or replacement of small and large diameter steel and ductile iron pipes and supports, and the installation of valves and piping appurtenances. Additionally, the project includes the operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, improvements to instrumentation, electrical scope, and motor control center components, as well as the installation of slide gates, platforms, and the rerouting of sump pump discharge lines. The project also requires excavation, trench work, and surveying of key points around the reactors. The estimated contract value ranges between $18.5 million and $19.5 million, with a bid opening deadline of December 2, 2026. This opportunity is designated as a Small Business (SB) set-aside, including SBA certified Veteran Owned Small Business (VOSB), Service-Disabled Veteran Owned Small Business (SDVOSB), Women-Owned Small Business (WOSB), and HUBZone Small Business (HUBZone SB). Ranger Pipelines Incorporated is soliciting quotes from certified DBE, DVBE, and SBE subcontractors for specialized services such as coating, concrete rehabilitation, electrical work, and welding. All subcontractors must comply with applicable state, county, and federal regulations.
Ranger Pipelines Incorporated

POSTED

about 2 hours ago

DEADLINE

in 5 days
View Details
NAICS: 238990
New
SLED
Eclwrf Fence Replacement Project
Solicitation # 20261125033
The Eclwrf Fence Replacement Project is a lump sum contract issued by the West Basin Municipal Water District for the removal and replacement of perimeter fencing at the Edward C. Little Water Recycling Facility in El Segundo, California. The scope of work includes the phased removal of 2,030 linear feet of existing tubular steel fencing, the construction of 2,030 linear feet of new 8-foot high tubular steel fencing, and the installation of a 240-linear foot steel fencing extension on an existing CMU wall. Additional requirements include the replacement of 180 linear feet of privacy screening, the repair and painting of existing gates and fencing, and the management of temporary rental fencing. All new fencing must feature a black factory-applied polyester powder coating with a minimum film thickness of 2.0 mils, and buried hardware must be 316 stainless steel with bitumastic waterproofing. The project must be completed within 150 calendar days from the Notice to Proceed, with a baseline schedule due within 30 days of contract execution. Bids are evaluated primarily on the lowest price, though the District considers bidder qualifications, financial ability, and compliance with requirements. Bidders must submit electronic bids via OpenGov by December 22, 2026, including a bid bond of at least 10 percent of the bid amount, a vendor reference form, and CARB Certificates of Reported Compliance. The contract is a public work subject to state prevailing wage rates and requires adherence to Cal/OSHA and local health guidelines. There is no specified set-aside status for this solicitation.
West Basin Municipal Water District

POSTED

about 7 hours ago

DEADLINE

in 26 days
View Details

More opportunities from Northern Lighthouse Board

Same awarding agency

NAICS: 811310
International
NLV Pharos Engine Overhaul
Solicitation # TPHA/ENGI/2692
The Northern Lighthouse Board is seeking an experienced contractor to perform a 40,000 hour major service overhaul on the starboard forward Wärtsilä L20 marine engine of the NLV Pharos, a DP(AA) Buoy Tender. The scope of work includes preparatory and ancillary component work, a full mechanical overhaul of the power assembly (units 1-4) including the crankshaft, pistons, liners, and main bearings, and the overhaul of pumps, thermostats, and the LO cooler. The project concludes with reassembly, required measurements recorded on Wärtsilä Record Sheets, and final commissioning and trials. All spare parts and consumables will be provided by the Northern Lighthouse Board, and the contractor will be provided with accommodation and subsistence for the duration of the service. The work is to be performed on board the NLV Pharos, with onboarding and disembarkation taking place on the east coast of Scotland. The estimated value of the contract is 40,000 GBP excluding VAT. Proposals are due by 2:00pm on November 27, 2026, via the Delta e-sourcing portal, with award decisions based on a weighting of 70% price and 30% quality. The service is expected to take place between January 4, 2027, and January 20, 2027, with a possible extension to March 31, 2027, under exceptional circumstances. This opportunity is noted as being particularly suitable for small and medium-sized enterprises.
Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance

POSTED

13 days ago

DEADLINE

in about 16 hours
View Details

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS