This Solicitation opportunity from Arizona was posted on August 14, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The City of Prescott is soliciting bids for the Hangar LED Retrofit project at the Ernest A. Love Field Regional Airport. The project involves standardizing electrical and lighting systems across ten hangar buildings, each containing 12 to 14 units. The scope of work includes installing three UFO LED overhead lights and three electrical outlets per unit, with two lights and two outlets for storage units. Additionally, the contractor must replace exterior wedge lights and obstruction lighting for all buildings, which may require the installation of new conduit and wiring. While the City will purchase the required lighting fixtures, the contractor is responsible for providing all labor, tools, and equipment. All work must comply with the 2023 National Electrical Code and City Electrical code 101.4.8.
The solicitation was posted on August 14, 2026, with a response deadline of September 3, 2026. The anticipated contract award is September 22, 2026, with a notice to proceed expected the week of October 19 and completion targeted for the week of December 18, 2026. Bidders must provide a proposal guarantee of at least 10 percent of the total bid price and are required to furnish performance and payment bonds. The contract is governed by the City of Prescott Supplement to the Maricopa Association of Governments Uniform Standard Specifications. Evaluation is based on timeliness and material compliance with all request requirements, and the City reserves the right to accept or reject any bid.
General Info
Prescott Airport LED retrofit project installing lights and outlets in hangar units.
PDF, High priority: read this first15 pages · contract-document
HighAI Summary for City of Prescott Construction Contract: This construction contract document for the City of Prescott outlines the agreement between the City and the Contractor for a TBD project. It includes the scope of work, contract documents incorporated by reference, time of completion, contract amount and payment terms, and various contract conditions such as conflict of interest, independent contractor status, and termination rights. The contract specifies that work must commence within 10 days of notice and be completed within a set number of calendar days, with provisions for extensions. Payment terms include a not-to-exceed amount and conditions for contract amendments. The document is a formal agreement establishing the responsibilities and obligations of both parties for the construction project.
PDF
PDF, High priority: read this first15 pages · ifb
HighAI Summary for City of Prescott Hangar LED Retrofit Notice Inviting Bids 2026: This document is the Notice Inviting Bids (IFB) for the Hangar LED Retrofit project at the City of Prescott Regional Airport, dated August 2026. It includes project specifications, scope of work, bidding schedule, and contract award procedures. The project involves retrofitting existing hangar lighting to UFO LED fixtures across ten hangar buildings, with detailed installation requirements and compliance with the 2023 National Electrical Code. Key dates include a non-mandatory pre-bid conference on August 25, 2026, bid submission deadline on September 3, 2026, and anticipated contract award on September 22, 2026. The document provides instructions for proposal submission, contact information, and outlines the project schedule and milestones.
PDF
PDF, High priority: read this first132 pages · specifications
HighAI Summary for City of Prescott Supplement to MAG Uniform Standard Specifications - Technical Specifications Feb 14 2019: This document is a supplement to the Maricopa Association of Governments (MAG) Uniform Standard Specifications and Details for Public Works Construction, dated February 14, 2019. It contains detailed technical specifications including general conditions, bidding requirements, contract award and execution, scope of work, control of work and materials, legal regulations, commencement and progress, measurements and payments, and various construction sections such as earthwork, streets, and traffic control. The supplement provides comprehensive guidance and standards for public works construction projects in the City of Prescott, serving as a critical reference for contractors and agencies involved in procurement and construction activities.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for E1.2 Hangars H I J Electrical Plan: Electrical plan sheet E-1-2 for existing Building T hangar work, titled "Hangars 'H', 'I', 'J' Electrical Plan." The content shows repeated notes for new lights, no new outlet required, switch and wiring connections, a key plan, and a revision history indicating multiple revisions. This appears to be a technical electrical drawing/specification sheet for lighting and switch wiring layout.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for E1.3 Hangars L M N Electrical Plan: Electrical plan sheet for hangars/buildings L, M, N, and related existing buildings, dated 3-31-2026. Includes switch and outlet general notes, electrical control and protection instructions, building plan references, key plan, and a note that no work is required on building M. The sheet appears to be part of a construction drawing set with electrical installation details and requirements.
PDF
PDF, High priority: read this firstsow
HighAI Summary for E1.4 Existing Bldg. O Hangar Electrical Plan: Sheet E-1.4 (of 6) dated 3-31-2026 contains an electrical plan for Existing Bldg. 'O' Hangar. It shows outlet requirements, switch and outlet general notes, and repeated contractor instructions to provide switch gear / switchgears / switchears for five wires in the rear of the building. The drawing includes abbreviations and plan metadata such as scale, job number EDCS 26-11, and draw date.
PDF
PDF, High priority: read this first17 pages · specifications
HighAI Summary for EnVision LED UFO High Bays EcoValue Line Product Specifications: This document provides detailed product specifications for the EnVision LED UFO High Bays EcoValue Line, including features such as 2-CCT and 3-Power selectable options, IP67 rating, and various mounting options. It includes technical details like wattage, lumens, beam angle, operating temperature, and certifications (UL, CSA, ROHS, FCC). The document also covers accessory models, mounting kits, emergency backup options, and control systems compatible with the fixtures. The information is intended to support procurement and installation decisions for commercial and industrial lighting applications.
XLSX
XLSX, High priority: read this first1 page · bid-schedule
HighAI Summary for HANGAR_LED_RETROFIT Bid Schedule: This document is a bid schedule for the Hangar LED Retrofit project, listing construction line items with descriptions, units of measure, and quantities. It includes various lighting components such as obstruction lights, floodlights, wall mount lights, photocells, and hangar lights with receptacles. The schedule is intended to support pricing and bidding for the retrofit work. No unit costs are filled in, indicating it is prepared for bidders to complete. The document serves as a critical procurement file detailing the scope and quantities of items required for the project.
PDF
PDF, High priority: read this firstsow
HighAI Summary for Hangar LED Retrofit Plans – Prescott Regional Airport: Electrical retrofit plan drawings for Prescott Regional Airport hangars, including hangars F through P and specific building plans such as K, L, M, N, and O. The document shows site/key plans, existing hangar electrical layouts, general notes for switches and outlets, revision markings, and some references to new outlet requirements and wiring terminals. It appears to be a set of construction/design plans for a hangar LED retrofit project, with scale and sheet identifiers shown on the pages.
PDF
PDF, Low priority8 pages · guidance
LowAI Summary for American Iron and Steel Requirement Guidance - EPA March 20, 2014: This document provides guidance on the American Iron and Steel (AIS) requirement established by P.L. 113-76, Section 436, part of the Consolidated Appropriations Act, 2014. It mandates that iron and steel products used in Clean Water and Drinking Water State Revolving Fund projects must be produced in the United States, with specific definitions and exceptions outlined. The guidance details covered products, definitions of steel and production criteria, waiver conditions, and application scope. The document is dated March 20, 2014, and is intended to assist recipients and administrators in complying with AIS requirements for federally funded water infrastructure projects.
PDF
PDF, Low priorityspecifications
LowAI Summary for E1.0 Exterior Electrical Lighting Plan - Hangar: Exterior Electrical Lighting Plan for the Hangar, labeled E1.0. The provided content appears to be a largely unreadable or corrupted drawing/table extract with no clear procurement terms, instructions, or contract language visible. Based on the filename and title, it is an electrical lighting plan drawing rather than a solicitation or award document.
PDF
PDF, Low priorityspecifications
LowAI Summary for E-1.1 Hangars Electrical Plan: Electrical plan sheet E-1.1 for hangars at PresotoP Regional Airport, dated 3-31-2026. The document shows a key plan, general electrical notes for switches/outlets, abbreviations, revision history, and identifies existing building hangar electrical plans for hangars/areas including C and D. It appears to be a drawing sheet with electrical layout reference information rather than a solicitation or contract award.
PDF
PDF, Low priority2 pages · specifications
LowAI Summary for LED LOC-ELHB V2 High Bay Light Family Series Product Specification: This document provides detailed product specifications for the LED LOC-ELHB V2 High Bay Light Family Series, including construction materials, optical system, electrical characteristics, installation methods, and warranty information. It lists multiple product models with wattage options, lumens, efficacy, and other technical data. The document also describes suitable applications such as warehouses and sporting arenas, and optional accessories like remote controls and sensors. Measurements and packaging details are included. The document serves as a technical reference for the product family.
PDF
PDF, Low priority2 pages · specifications
LowAI Summary for LED RTO Series Red Obstruction Light Product Specification DS4027-v1.1: This document provides detailed product specifications for the LED RTO Series Red Obstruction Light, model L-810(L), compliant with FAA, ICAO, and Transport Canada standards. It includes features, uses, electrical specifications, mechanical dimensions, ordering codes, and operating conditions. The version is DS4027-v1.1. The light is designed for marking fixed obstructions to eliminate air navigational hazards, with advanced LED technology, weather resistance, and long service life. The document serves as a technical reference for product details and ordering information.
PDF
PDF, Low priority5 pages · other
LowAI Summary for Lithonia Lighting ESXF LED Floodlights Product Catalog: This document is a product catalog for Lithonia Lighting's ESXF LED Floodlights, detailing features, configurations, mounting options, electrical performance, and dimensions. It provides technical specifications such as adjustable lumen output, switchable color temperature, photocell options, and IP66 rating. The catalog includes tables of catalog numbers, UPC codes, and mounting accessories. The document is intended to inform contractors and buyers about the product options and configurations available.
PDF
PDF, Low priority17 pages · guidance-memorandum
LowAI Summary for OMB Memorandum M-22-11 on Buy America Preference Implementation Guidance: This April 18, 2022 memorandum from the Office of Management and Budget (OMB), designated M-22-11, provides initial implementation guidance on applying the Buy America preference in federal financial assistance programs for infrastructure. It outlines requirements under the Build America, Buy America Act (part of the Infrastructure Investment and Jobs Act) mandating that iron, steel, manufactured products, and construction materials used in federally funded infrastructure projects be produced in the United States. The memorandum clarifies applicability, definitions, and agency responsibilities to ensure compliance by May 14, 2022, and discusses waiver processes and consultation with tribal governments. The document aims to strengthen domestic supply chains and support American industry and jobs.
PDF
PDF, Low priority5 pages · specifications
LowAI Summary for WDGE3 LED Architectural Wall Sconce Product Specifications: This document provides detailed product specifications for the WDGE3 LED Architectural Wall Sconce, including dimensions, weight, design options, ordering information, performance data, control and sensor options, and emergency battery backup features. It includes technical details such as lumen output, electrical load, and photometric data, as well as descriptions of available finishes and sensor controls. The document serves as a comprehensive product data sheet for lighting professionals and purchasers.
Hangar units currently have varying numbers of lights and outlets. The project will standardize each unit with three LED overhead lights and three electrical outlets.