Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Harbinger Motors/12821 Knott Street Project

Forecast
2025050492State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Harbinger Motors/12821 Knott Street Project, managed by the City of Garden Grove, involves the interior construction of a 10,338 square foot mezzanine to provide additional office space within an existing 173,000 square foot warehouse. Located on a 7.97 acre property in California, the project is strictly limited to the building interior, with no proposed exterior construction or changes to the existing parking lot. All construction staging will be contained within the warehouse, and equipment access is restricted to Knott Street on the east side of the site. The project site is zoned PUD 104-70 and currently operates under the IC land use designation. Because the addition of the mezzanine increases the Floor Area Ratio from 0.50 to 0.53, an Amendment to the General Plan is required to establish two subareas, allowing parcels in Subarea B to have a maximum FAR of 0.55. The project was approved on August 26, 2025, and a Notice of Determination was filed on August 27, 2025, certifying compliance with the California Environmental Quality Act.

General Info

Garden Grove approved a 10,338 square foot interior mezzanine for Harbinger Motors warehouse.

Place of Performance

Knott Street and SR-22, CA, 92841

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more

Full Description

Show more
The proposed project includes the construction of a 10,338 sf mezzanine for additional office space within the existing approximately 173,000 sf (gross floor area) warehouse on the project site. All proposed improvements would be limited to the interior of the existing building and no exterior construction or revisions to the existing parking lot are proposed. All construction staging would be contained within the existing building, and all construction equipment would access the site from Knott Street on the east side of the project site. The project site’s zoning (PUD 104-70 [REV. 2019]) allows for the current use, and the current use would not change with implementation of the project. The maximum allowed FAR under the General Plan Land Use Designation IC is 0.50. The additional mezzanine office space would increase the FAR to 0.53. For the project site to remain in compliance with the General Plan Land Use designation and associated maximum FAR, an Amendment to the General Plan is proposed to establish two subareas within the existing IC land use designation. Parcels included in Subarea A (42 total) would retain the existing maximum FAR of 0.5. The maximum FAR that applies to parcels in Subarea B (5 total) would increase to 0.55.

Similar Contracts

Same NAICS industry code

NAICS: 541620
New
SLED
RFP for Preparation of an Initial Study Under CEQA
Solicitation # RFP-PLN-2504
The County of San Benito is soliciting proposals for the preparation of an Initial Study under the California Environmental Quality Act (CEQA). This project, identified as RFP-PLN-2504, requires the selected contractor to perform services in accordance with the Public Resources Code and the California Code of Regulations. The scope of work is divided into three primary tasks: project management, scope of services, and a traffic impact analysis. To support the study, the County has provided reference materials from planning files PLN250084 and PLN180004, which include grading and utility plans, a mitigated negative declaration, and various technical reports. Proposals must be submitted electronically via the OpenGov system by December 7, 2026, at 5:00 pm. The submission must be split into a technical proposal and a separate cost proposal using a specific pricing table. Award selection is based on a points-based scoring system that weights cost at 30%, firm qualifications at 25%, experience in similar CEQA analysis at 25%, and the quality of the written scope of work at 20%. The County reserves the right to award the contract to the highest-rated proposer rather than the lowest bidder. The resulting contract will be governed by the County of San Benito's Standard Contract, featuring a net-30 payment term with invoicing occurring one month in arrears. Contractors must certify compliance with various federal non-discrimination laws, including the Americans with Disabilities Act and the Civil Rights Act of 1964, and must provide a debarment certification. Final project schedules, including milestones and critical paths, will be required from the proposer, while specific insurance and indemnification terms will be finalized during the negotiation process.
Planning

POSTED

about 14 hours ago

DEADLINE

in 20 days
View Details
NAICS: 541620
New
International
Source Water Protection Plan - Baptiste Lake
Solicitation # 235899
The Regional District of East Kootenay is seeking a qualified consultant to develop a comprehensive and implementable Source Water Protection Plan for Baptiste Lake in British Columbia. The scope of work involves characterizing the lake and watershed as a drinking water source, identifying hazards and vulnerabilities, and evaluating current protection measures, governance, and climate-related risks. The final deliverables must include a detailed Source Water Protection Plan with recommended actions for land use and monitoring, a practical implementation plan with budget-level cost estimates, and a monitoring framework with decision triggers. The plan must align with the Edgewater Water System Master Plan, Interior Health permit conditions, and DFO screening requirements. The contract is expected to be awarded by December 18, 2026, with a project start-up meeting scheduled for mid-January 2027, a draft report due by May 28, 2027, and a final report due by July 2, 2027. Proposals are evaluated on a 100-point scale, with 40 points allocated to the project team and experience, 40 points for project understanding and methodology, and 20 points for the fee. The selection process prioritizes the highest overall ranking and best value rather than the lowest bid. Submissions must be delivered in PDF format to the designated Engineering Technician by the closing deadline.
Regional District of East Kootenay

POSTED

about 17 hours ago

DEADLINE

in 24 days
View Details

More opportunities from California → City of Garden Grove

Same awarding agency

NAICS: 236220
SLED
Site B-2 Hotel Project
Solicitation # 2022060174
The Site B-2 Hotel Project involves the single-phase construction of a full-service high-rise resort hotel on a 3.72-acre site at the northwest corner of Harbor Boulevard and Twintree Avenue in Garden Grove, California. The development features a maximum height of 350 feet and includes 500 guest suites with balconies, a 61-foot entertainment and pool deck with a lazy river, a theater, a ballroom, meeting rooms, food and beverage spaces, themed shops, an arcade, and a spa and fitness center. Additionally, the project includes a five-level parking garage with 528 spaces, comprising four levels above grade and one below. The estimated construction timeline is 30 months. The project is governed by the City of Garden Grove and is subject to the California Environmental Quality Act (CEQA), with a Notice of Determination filed on June 24, 2026, following the approval of a Supplemental Environmental Impact Report. Key environmental and regulatory requirements include a Water Conservation Compliance Report demonstrating a minimum 10% reduction in water use and the submission of roofing and hardscaping specifications to the City Building Division. Final occupancy is contingent upon city inspectors verifying these materials and the implementation of a scheduled HVAC and refrigeration maintenance plan. The site is designated as International West Mixed Use under the General Plan and is subject to Planned Unit Development and Single-Family Residential zoning.
Commercial and Institutional Building Construction

POSTED

5 months ago

DEADLINE

N/A
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS