Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Hardened Data Center Construction

Open
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

Richmond, KY, 40475, USA

Set-Aside

NONE

Documents

This scope was carved out of W912-QR-DACA27-1-27-0015900.

The full solicitation package (14 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Enhanced Use Lease for Commercial Power Generation Facility

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Due in 60 days

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 14 documents on the prime contractFrom Enhanced Use Lease for Commercial Power Generation Facility
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W072 Endist Louisville
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Constructs physical data center facilities for prime contractors on Army National Guard facility projects. Builds facility shells and interiors, installs specialized cooling and power systems, and implements hardening for sensitive workloads. Requires experience with SCIF-like or IL6 physical security standards. Delivers a completed facility with a Certificate of Occupancy.

Similar Contracts

Same NAICS industry code

NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
The Building 262 Renovation project at the Federal Law Enforcement Training Center (FLETC) in Glynco, Georgia, is a comprehensive interior modernization effort. The scope of work includes replacing corridor and classroom flooring with LVP and carpet tiles, fully renovating restrooms by replacing vanities and lavatories, and updating doors and life-safety components. Technical upgrades involve installing a low-profile raised flooring system with electrical distribution for classrooms, replacing variable air volume (VAV) systems using Automated Logic Corporation components, and upgrading lighting controls and ballasts. The project also requires repainting interior surfaces, installing new signage, and correcting plumbing deficiencies. This procurement is a Total Small Business Set-Aside under NAICS code 236220. The period of performance is scheduled from January 11, 2027, to March 11, 2028, with a total delivery timeline of 425 calendar days after the notice to proceed. Proposals are evaluated based on three equally weighted factors: Past Performance, Corporate Relevant Experience, and Price. The contractor must provide payment and performance bonds totaling 100% of the contract price and adhere to strict security and background check requirements, including FBI fingerprinting and DHS non-disclosure agreements. All work must comply with ADA/ABA accessibility guidelines and the FLETC Hazardous Waste Management Plan.
Bristol Alliance of Companies

POSTED

about 2 hours ago

DEADLINE

in 12 days
View Details
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 covers the repair and modernization of the Auto Maintenance Facility, Building 575, at MCB Camp Lejeune, North Carolina. The scope of work is comprehensive, involving selective demolition, building envelope and roofing repairs, interior reconfiguration, and the installation of new finishes. Technical upgrades include new HVAC systems, exhaust extraction, compressed air systems, a full NFPA-compliant fire suppression system, and updated electrical distribution, lighting, and building automation controls. Additionally, the project encompasses site improvements such as paving, drainage upgrades, and hazardous materials abatement. The project is estimated to cost between $10 million and $25 million with a performance period of 730 days, with the award based on the lowest price. Bidders must provide pricing for two primary exhibit line items: building renovation and the removal and replacement of paving. The contract requires strict adherence to various standards, including MIL-STD-101 for piping identification and ADA accessibility guidelines. Administrative requirements include the use of Wide Area WorkFlow for invoicing and the submission of monthly work-hour reports and certified payrolls. Bonding requirements vary by proposal value, with bid, payment, and performance bonds required for projects valued at $150,000 or more. Government acceptance is contingent upon a final inspection report submitted 14 days prior to testing, with electrical systems evaluated according to NETA ATS standards.
Bristol Alliance of Companies

POSTED

about 2 hours ago

DEADLINE

in 12 days
View Details
NAICS: 236220
New
SLED
DB Repair Fire Sprinkler Deficiencies, B290, PSNS
Solicitation # N4425527RB007
Solicitation N4425527RB007 is an 8(a) Multiple Award Construction Contract (MACC) task order for a design-build project to repair fire sprinkler deficiencies at Building 290 and the adjoining Building 719 loading dock platform at Naval Base Kitsap, PSNS, in Bremerton, Washington. The contractor is responsible for final design documentation per FC 1-300-09N, labor, supervision, and all materials necessary to resolve critical hazards. Key deficiencies include a Risk Assessment Code Level 4 (RAC-4) deficiency regarding missing sprinklers at the loading dock, unmonitored and unlocked sprinkler control valves in basement elevator pits, and missing backflow preventers on wet pipe sprinkler system risers. Because Building 290 is on the historical register, any exterior modifications require approval from the State Historic Preservation Office (SHPO). The period of performance is 440 days from the award of the task order. Proposals are due by December 2, 2026, at 2:00 PM PST via the PIEE portal and will be evaluated based on price and MACC past performance. Required submissions include a cover letter, a completed schedule of prices, and a bid guarantee of 20 percent of the bid price or $3,000,000, whichever is less. The project mandates strict adherence to safety and technical standards, including EM 385-1-1, the International Plumbing Code, and UFC 3-420-01. Additionally, the contractor must provide a Quality Control Manager, a Site Safety and Health Officer, and comply with FAR 52.219-14 limitation of subcontracting, ensuring no more than 85 percent of the government payment is paid to non-similarly situated entities.
Bristol Alliance of Companies

POSTED

about 2 hours ago

DEADLINE

in 12 days
View Details
NAICS: 236220
New
SLED
Modify Transfer Facility NBK Bangor
Solicitation # N44255-25-R-1502
Solicitation N44255-25-R-1502 is a design-build project for the renovation and modernization of Facility #6594 (Transfer Facility) at Naval Base Kitsap Bangor, Washington. The project is estimated to be valued between $10 million and $25 million and is structured in two phases to ensure the facility remains operational and mission-capable throughout the process. Key scopes of work include the demolition and replacement of deteriorated components, the construction of a 400-square-foot addition for forklift battery charging, and the installation of new building equipment, including a prefabricated paint booth and the replacement of a 40-ton bridge crane. All design documents for both phases must be completed and approved during Phase 1. The contract requires strict adherence to Unified Facilities Criteria (UFC) and cybersecurity standards, including CMMC Level 1 and DFARS safeguarding requirements. Performance is measured by a multi-stage inspection process involving preliminary and final inspections, with specific testing for sound attenuation and electronic security systems. The base bid (CLIN 0001) must be completed within 360 calendar days of award, while the option (CLIN 0002) has a completion window of 1,082 calendar days. Award is based on price and MACC past performance. Proposals are due by December 7, 2026, via the PIEE portal.
Bristol Alliance of Companies

POSTED

about 2 hours ago

DEADLINE

in 14 days
View Details
NAICS: 236220
New
Roof Replacement Mandatory Site Visit: 12/03/2026 @ 11 AM
Solicitation # 26-144
This solicitation, number 26-144, is for a full roof replacement of Building 1963 LBJ at the Atterbury Job Corps Center in Indiana, operated by Adams & Associates for the U.S. Department of Labor. The project is necessitated by persistent leaks, missing shingles, and storm damage. The contract is a single lump sum award, with the selection based on best value rather than the lowest price. Evaluation factors include price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). This opportunity is set aside for Small Business (SB), SBA certified Veteran Owned Small Business (VOSB), SBA certified Service-Disabled Veteran Owned Small Business (SDVOSB), SBA certified Women-Owned Small Business (WOSB), and SBA certified HUBZone Small Business (HUBZone SB). A mandatory site visit is scheduled for December 3, 2026, and proposals are due by December 14, 2026. The successful contractor must provide a sequenced construction schedule within 10 days of the Notice to Proceed and start work within 14 days. Requirements include a one-year workmanship guarantee, a two-year manufacturer's product warranty, and compliance with EPA, OSHA, and Indiana state and local building codes. Bidders must provide a valid Indiana Contractor's License, a W9, a completed vendor questionnaire, and proof of specific automobile and workers compensation insurance naming Adams and Associates, Inc. as an additional insured. Payment terms are Net 30.
Atterbury Job Corps – Adams & Associates

POSTED

about 2 hours ago

DEADLINE

in 23 days
View Details
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
This project involves the construction of the P084 Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The scope of work includes a 12,920 SF multi-story steel frame laboratory and office facility, as well as an optional 17,978 SF laboratory facility. Construction features include shallow foundations, metal standing seam roofs, and exterior walls composed of masonry and metal panels. The project also encompasses comprehensive site improvements, including underground stormwater retention, utilities, landscaping, and parking, along with the demolition of Building 1272T. The solicitation is set aside for Small Business (SB), Small Disadvantaged Business (SDB), Women-Owned Small Business (WOSB), HUBZone Small Business (HUBZone SB), Veteran Owned Small Business (VOSB), and Service-Disabled Veteran-Owned Small Business. Bidding is open for various trades, including demolition, concrete, structural steel, mechanical, electrical, and plumbing. The project is exempt from sales tax and adheres to Davis Bacon Wage Rates. Interested parties should contact Rahul Maheshwari to receive bid invitations and documents via Building Connected.
J&J CONTRACTORS, INC.

POSTED

about 2 hours ago

DEADLINE

in 9 days
View Details
NAICS: 236220
New
Site Visit (required) Replacement of existing damaged fire rated doors and frames-
Solicitation # 26-141
This solicitation is for the removal and replacement of damaged fire-rated doors and frames at the Atterbury Job Corps Center cafeteria in Indiana. The project requires the installation of new fire-rated doors that comply with all local, state, and federal building codes, while reusing existing closure systems and push bars. The contractor must provide a sequenced construction schedule, a dated punch list for substantial completion, and all necessary training and maintenance manuals. Work must be performed in accordance with EPA and OSHA regulations, and the contractor must adhere to Davis-Bacon Act wage rate decisions. The contract is set aside for Small Business (SB), including SBA certified Veteran Owned Small Business (VOSB), Service-Disabled Veteran Owned Small Business (SDVOSB), Women-Owned Small Business (WOSB), and HUBZone Small Business (HUBZone SB). Award will be based on best value, evaluating price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Proposals must be submitted as a single lump sum on official company letterhead by December 11, 2026, and must include a valid Indiana Contractor's License, a W9, and proof of insurance. A mandatory bid conference is scheduled for December 1, 2026, and a site visit is required. Payment terms are Net 30, and the project includes a one-year guarantee of workmanship.
Atterbury Job Corps – Adams & Associates

POSTED

about 2 hours ago

DEADLINE

in 20 days
View Details
NAICS: 236220
New
SLED
Family Justice Center Project
Solicitation # OD564
The County of San Mateo, Department of Public Works, is soliciting a general contractor for the Family Justice Center Project (Project No. OD564) located at 1510 Fashion Island Boulevard, San Mateo, California. The scope of work includes the selective interior demolition of approximately 20,000 square feet on the second floor to create specialized layouts for administrative offices, secure law enforcement interview and observation rooms, a boutique, and a medical services area. Additionally, the project involves constructing a conference room on the first floor, staff offices on the third floor, and comprehensive mechanical, electrical, and plumbing (MEP) infrastructure upgrades to ensure code compliance and operational efficiency. There is no specified set-aside status for this solicitation. The contract is expected to be awarded to the responsive and responsible proposer offering the best value, with the primary evaluation factor being the lowest responsive and responsible bid. The anticipated notice to proceed is January 26, 2027, with a total project duration of 244 calendar days. Key requirements include compliance with ADA standards, California Title 24, and the Project Labor Agreement (PLA). The contractor must be registered with the Department of Industrial Relations (DIR) and SAM.gov, provide a 10% bid bond, and maintain comprehensive insurance and performance bonds. Project management will be coordinated through the Procore software platform. Proposals must be submitted electronically via the eProcurement system by January 4, 2027.
County of San Mateo

POSTED

about 3 hours ago

DEADLINE

in about 2 months
View Details

More opportunities from Department Of Defense → W072 Endist Louisville

Same awarding agency

NAICS: 531120
New
Federal
Enhanced Use Lease for Commercial Power Generation Facility
Solicitation # W912-QR-DACA27-1-27-0015900
The Department of the Army is soliciting competitive proposals for Enhanced Use Leases (EUL) to develop commercial power generation facilities and data centers on non-excess land at several installations, including Blue Grass Army Depot, Pine Bluff Arsenal, Tooele Army Depot, Sierra Army Depot, Fort McCoy, Fort Bragg, Fort Hood, Fort Rucker, and Joint Base Lewis-McChord. The selected offerors will be responsible for the design, financing, construction, operation, and eventual decommissioning of these projects. While the Army prefers integrated projects combining power generation and data centers, proposals for power generation only are acceptable; however, data center-only proposals will not be considered. Projects must provide energy resilience to the Army, including resilient power within one hour of a grid outage for at least fourteen continuous days, and must utilize non-potable water sources to remain net-neutral or better regarding water usage. The EULs will have an initial term of twenty-five years, with potential options for renewal. Consideration for the lease will be provided as cash, in-kind, or a combination, with a value not less than the fair market value of the lease interest. Proposals are evaluated based on five equally weighted factors, with a strong preference for data center frameworks that are either hardened, physically isolated campuses for Top Secret/IL6 workloads or large-scale hyperscale and AI/HPC facilities. All projects must comply with various federal regulations, including the Buy American Act, the Davis-Bacon Act, and environmental standards such as CERCLA, NEPA, and NHPA. This solicitation is not set aside for any specific category of business.
Lessors of Nonresidential Buildings (except Miniwarehouses)

POSTED

about 4 hours ago

DEADLINE

in about 2 months
View Details

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS