Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Connecticut was posted on June 23, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Harkness Greenhouse Shade Replacement

Closed
DEEP062326CMState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238990
New
EBMUD – SD-462 – Secondary Reactors Rehab. – Phase 2
Solicitation # SD-462
The EBMUD Secondary Reactors Rehabilitation Phase 2 project, solicitation number SD-462, is a comprehensive infrastructure project located at the Main Wastewater Treatment Plant in California. The scope of work involves the rehabilitation of covered and open concrete structures, relining and replacement of steel and DI pipes, and the installation of valves, piping appurtenances, and associated electrical and instrumentation systems. Key deliverables include the operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, modification of sluice and slide gates, and the improvement of platforms and access to concrete structures. The project also encompasses excavation, trench work, and surveying of reactors. The estimated contract value ranges from $18.5 million to $19.5 million, with a bid opening deadline of December 2, 2026. This opportunity is set aside for Small Business (SB), SBA certified Veteran Owned Small Business (VOSB), SBA certified Service-Disabled Veteran Owned Small Business (SDVOSB), SBA certified Women-Owned Small Business (WOSB), and SBA certified HUBZone Small Business (HUBZone SB). Ranger Pipelines Incorporated is seeking quotes from certified DBE, DVBE, and SBE subcontractors for specialized services including coating, concrete rehabilitation, electrical work, and welding. All subcontractors must comply with applicable state, county, and federal regulations.
Ranger Pipelines Incorporated

POSTED

about 8 hours ago

DEADLINE

in 10 days
NAICS: 238990
New
International
Security Enhancement Works: Motorized Sliding Compound Main Gates and Safe Room Security Reinforcement – UNICEF Jigjiga Field Office NA NA - [email hidden]
Solicitation # LRFP-2026-9207436
UNICEF has issued solicitation LRFP-2026-9207436 for security enhancement works at the Jigjiga Field Office in Ethiopia. The project is a non-LTA for construction works divided into two primary components: the supply and installation of three heavy-duty motorized sliding steel gates (5m x 3m) with pedestrian gates and reinforced-concrete foundations, and the security reinforcement of a safe room involving external security grills and double-steel-plated protection for windows and doors. The contractor is responsible for full fabrication, installation, testing, commissioning, and providing training for UNICEF security staff, as well as delivering as-built drawings and maintenance documentation. The contract requires a performance security of 10% of the total price, a 5% retention, and a 12-month equipment warranty and defects liability period. Work must commence by December 31, 2026, with a seven-day mobilization period and a total implementation timeframe of two and a half calendar months. Award evaluation is based on a 70% technical and 30% financial weighting, with a minimum technical pass threshold of 49/70. Technical criteria include the provision of specific equipment such as concrete mixers, generators, and transport vehicles, as well as financial standing and capacity. All works must comply with Ethiopian national laws and international standards including ASTM, ACI, IEC, ISO, and NFPA. There is no set-aside status specified for this solicitation.
UNICEF

POSTED

1 day ago

DEADLINE

N/A

AI Contract Overview

Show more

The Department of Energy and Environmental Protection is soliciting bids for the replacement and installation of components for the Wadsworth-controlled retractable shade cloth system at the Harkness Greenhouse. The scope includes supplying new in-kind clips, shade cloth material, and associated support hardware necessary to restore the system’s functionality. Bidders may also submit optional upgrades for more durable alternatives, allowing for enhanced longevity and performance beyond the standard components. The work is limited to the specified site in Connecticut, with all materials and labor required to meet the technical specifications outlined in the solicitation. Solicitation DEEP062326CM was posted on June 23, 2026, with a firm response deadline of June 30, 2026, at 6:00 PM. The procurement is managed by the Connecticut Department of Administrative Services under the SLED category, and all bids must be submitted via the designated online portal. Eric Gileau serves as the primary point of contact for inquiries, reachable via email at [email hidden]. No set-aside provisions are indicated, and the solicitation is open to all qualified respondents seeking to provide the specified materials and installation services.

General Info

Replace shade cloth system components at Harkness Greenhouse, Connecticut, with optional durable upgrades by June 30, 2026.

Documents

9
PDF, High priority: read this firstitb
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstsow
High
JPG
JPG
JPG
JPG
JPG
JPG

Read all 9 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Boiler Maintenance Renewal, 1/1/23-12/31/23Open now
  • MAIN WASTEWATER TREATMENT PLANT SECONDARY REACTORS REHABILITATION,PHASE 2, SPECIFICATION SD-462Open now, due in 10 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyConnecticut → DAS Procurement
Contacts1 person available
OfficeCT, USA
Organization / AgencyConnecticut → DAS Procurement
Office AddressCT, USA

Full Description

Show more
The Department of Energy and Environmental Protection (DEEP) is seeking bids for the replacement and installation of components for the Wadsworth‑controlled retractable shade cloth system. Work includes providing new in‑kind clips, shade cloth material, and related support hardware, with add‑alternate options for upgraded, more durable products.

More opportunities from Connecticut → DAS Procurement

Same awarding agency

NAICS: 237310
New
SLED
Curtiss Park Trail State Project No. 128-158
Solicitation # E26-01
The Town of Simsbury is soliciting bids for the Curtiss Park Trail project, State Project No. 128-158, which involves the construction of approximately 3,000 linear feet of bituminous concrete multi-use trail. The trail will run along the north side of Tariffville Road, crossing the Farmington River via an existing sidewalk on the Tariffville Road bridge, and extending to Curtiss and Pattison Parks. The scope includes the construction of a boardwalk section within and adjacent to wetlands in the Farmington River riparian corridor. This project is funded through the Transportation Alternatives Program and is administered by the Connecticut Department of Transportation. The contract will be awarded to the lowest responsive and responsible bidder who is properly licensed, adequately staffed, and experienced in the required work. Bidders must provide a CTDOT contractor prequalification certificate and submit a physical bid package including a non-collusion affidavit, bid security, and a hold harmless and indemnification agreement. Key technical requirements include adherence to CTDOT Standard Specifications and Connecticut Guidelines for Soil Erosion and Sediment Control. Revised bid quantities include 1,172 cubic yards of earth excavation and 1,710 tons for the disposal of controlled materials. There is no set-aside status for this solicitation, and the DBE participation goal is zero percent. Bids are due by November 24, 2026, at 2:00 PM.
Highway, Street, and Bridge Construction

POSTED

about 19 hours ago

DEADLINE

in 3 days
View Details

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS