Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

Hazardous Material Remediation (Lead-Contaminated Media)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for the City of San Leandro involves hazardous material remediation specifically focused on lead-contaminated plastic filter media at wastewater project sites. The selected contractor will be responsible for the removal of 4,900 cubic yards of lead-positive media and the construction of a secured, double-lined on-site storage area measuring at least 22,000 square feet, complete with a cover liner and necessary erosion controls. Strict adherence to safety regulations is required, specifically compliance with 8 CCR 1532.1 (p) regarding Cal/OSHA Lead-Work Pre-Job Notification. The project is located in San Leandro, California, with a response deadline set for October 28, 2026.

General Info

Place of Performance

San Leandro, CA, 94577, USA

Set-Aside

NONE

Documents

This scope was carved out of 26-27.003.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

FIXED FILM REACTOR REMOVAL PROJECT

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → San Leandro City
ContactsNo contacts available
OfficeN/A
Organization / AgencyCalifornia → San Leandro City
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs the removal and on-site containment of lead-positive plastic filter media for prime contractors on City of San Leandro wastewater projects. Removes 4,900 cubic yards of media and constructs a double-lined storage area of minimum 22,000 sq ft with cover liner and erosion controls. Requires compliance with 8 CCR 1532.1 (p) for Cal/OSHA Lead-Work Pre-Job Notification. Delivers a secured, double-lined on-site storage area.

Similar Contracts

Same NAICS industry code

More opportunities from California → San Leandro City

Same awarding agency

NAICS: 238910
New
SLED
FIXED FILM REACTOR REMOVAL PROJECT
Solicitation # 26-27.003
The City of San Leandro, California, is soliciting sealed bids for the Fixed Film Reactor Removal Project (Project No. 2026.6010, Bid No. 26-27.003). The scope of work involves the dismantling and removal of existing fixed film reactors, including the demolition of steel structures, concrete foundations, slabs, piping, and conduits. A critical component of the project is the handling of approximately 4,900 cubic yards of lead-contaminated plastic filter media, which must be removed and stacked on-site within a contractor-constructed, double-lined storage area of at least 22,000 square feet. The project also requires site restoration, including backfilling voids to 95 percent relative density, regrading, and placing a rock lift over a 30,000 square foot area. The contract will be awarded to the lowest responsible bidder, with a 5 percent bid preference applied to qualified San Leandro businesses. Bids are due by 3:00 PM on October 28, 2026. The successful contractor must complete the work within 120 working days, with on-site time limited to 60 days. Required submissions include a 10 percent bid bond, a safety plan, and various certifications regarding local business status, non-collusion, and debarment. Performance, payment, and maintenance bonds are required upon award. The project is governed by the 2024 APWA Southern California Chapter Standard Specifications for Public Works Construction and requires compliance with California Labor Code prevailing wage rates and Cal/OSHA lead-work notifications.
Site Preparation Contractors

POSTED

about 12 hours ago

DEADLINE

in 21 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS