The Remedial Action for Lower Maumee River Sway Bridge project, funded by a US Environmental Protection Agency grant and managed by the Toledo-Lucas County Port Authority, involves the removal and disposal of approximately 124,000 cubic yards of contaminated sediment and debris. The scope of work includes mechanical dredging, the installation of erosion and turbidity controls, and the use of specialized instrumentation to protect existing structures. Dredged materials will be transported to the Toledo-Lucas County Port Authority Confined Disposal Facility or an approved commercial landfill. Additional requirements include the removal of shipwrecks, the installation of temporary steel sheet piling for shoreline stability, bathymetric surveys, and post-dredging verification sampling. The contractor is also responsible for residual dredging, placing amended residual covers, and installing engineered subaqueous backfill to ensure slope stability. Optional tasks may include organoclay layer placement for NAPL isolation, structural inspection diving, and additional sediment removal beyond base quantities. The total engineer's estimate for the base bid and approved optional work is approximately $22,612,100.00, with responses due by December 8, 2026.
General Info
Place of Performance
OH, USASet-Aside
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Response Deadline
Organization & Contact Information
Full Description
Optional Work only as directed by TLCPA may include placement of an organoclay layer to isolate non-aqueous phase liquid (NAPL) materials; structural inspection diving services; NAPL sheen mitigation within the CDF cell; CDF cell drawdown activities; and additional quantities of sediment and debris removal, transportation, and disposal beyond the base contract quantities.
The total engineer's estimate for the base bid and approved optional work is approximately $22,612,100.00
Similar Contracts
Same NAICS industry code
Earlier notices in this NAICS code
Posted before this notice, open and closed
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS