Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Hazardous Material Testing and Design

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract opportunity with The Ohio State University involves providing hazardous materials testing and the design of remediation strategies for facility projects. The selected contractor will be responsible for conducting site sampling for lead, asbestos, and other contaminants using specialized laboratory and environmental equipment. To ensure compliance and safety, the project requires the use of certified hazardous materials inspectors who will deliver comprehensive survey reports and detailed remediation design documents. The solicitation is categorized under NAICS code 541620 and was posted on September 23, 2026. Interested parties must submit their responses by the deadline of October 9, 2026. Further details and application processes are managed through the Ohio Facilities Construction Commission project opportunities portal.

General Info

Ohio State University seeks hazardous materials testing and remediation design by October 9, 2026.

Place of Performance

Not specified

Set-Aside

NONE

Documents

This scope was carved out of OSU-270009.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Ramseyer Hall Renovation

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyThe Ohio State University
ContactsNo contacts available
OfficeN/A
Organization / AgencyThe Ohio State University
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs hazardous materials testing and designs remediation strategies for prime contractors on Ohio State University facility projects. Conducts site sampling for asbestos, lead, and contaminants using environmental sampling and laboratory equipment. Requires certified hazardous materials inspectors. Delivers hazardous materials survey reports and remediation design documents.

Similar Contracts

Same NAICS industry code

NAICS: 541620
New
SLED
Csa 13- Alpine Meadows Leach Field Defensible Space Project Rfp For Environmental Services
Solicitation # 207619
The Shasta County Department of Public Works is soliciting proposals for environmental and cultural services to support the CSA 13- Alpine Meadows Leach Field Defensible Space Project. Located within the Whispering Woods subdivision on County-owned property in Redding, California, the project requires the creation of defensible space around an existing leach field. The selected consultant will be responsible for delivering a Natural Environment Study compliant with NEPA, CEQA, and HCD requirements, conducting biological assessments and field surveys, managing Section 7 consultations, and updating aquatic resource delineations. Additionally, the scope includes cultural resource evaluations and potential on-site monitoring during construction and maintenance activities. Proposals are due by October 21, 2026, and must be submitted electronically via bidnetdirect.com in two separate envelopes: one for the technical proposal and one for the cost proposal. The award process is based on a technical review and ranking system, with scoring weighted by experience with similar work (25%), staff quality (20%), familiarity with state and federal procedures (20%), and conformity with the County's standard personal services agreement (10%). Following the technical ranking, the County will negotiate costs with the top-ranked respondent to identify the best-qualified firm at a reasonable cost. Key personnel requirements include a Principal-in-Charge, an organizational chart, and detailed qualifications for all staff and subconsultants involved.
Shasta County Department of Public Works

POSTED

about 17 hours ago

DEADLINE

in 23 days
View Details

More opportunities from The Ohio State University

Same awarding agency

NAICS: 541310
New
SLED
Ramseyer Hall Renovation
Solicitation # OSU-270009
The Ohio State University has issued a Request for Qualifications for the renovation of Ramseyer Hall, an 87,452 gross-square-foot historic facility. The project aims to address critical deferred maintenance and modernize the building to accommodate the Salmon P. Chase Center for Civics, Culture, and Society, the Mathematics and Statistics Learning Center, and a Classroom Pool. The scope includes building systems upgrades, envelope improvements, accessibility enhancements, and interior reconfiguration to create flexible academic and collaborative spaces. A primary objective is the preservation of the building's architectural heritage and historic integrity. The project will be delivered using the Construction Manager at Risk method, with an estimated construction cost of 32 million dollars and a total project budget of 47.8 million dollars. The selected Architect/Engineer must adhere to strict University standards, including the use of a collaborative BIM-enabled environment, the Target Value Design framework, and the e-Builder Project Management System for closeout. Key deliverables include the Program of Requirements, Schematic Design, and a Basis of Design. The selection process is based on a point-scoring system evaluating firm location, qualifications, team experience, and commitment to the EDGE program, which has a 5 percent participation goal. Approval for construction is anticipated in June 2027, and the design team will be required to provide significant on-site construction administration services.
Architectural Services

POSTED

6 days ago

DEADLINE

in 10 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS