Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Ohio was posted on September 23, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Ramseyer Hall Renovation

Closed
OSU-270009State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541310
New
SLED
CCCRI A&E Services for The Workforce Innovation Center Addition Knight Campus
Solicitation # RFP27007132
The Community College of Rhode Island is soliciting architectural and engineering services for the Workforce Innovation Center addition at the Knight Campus in Warwick, Rhode Island. The project involves the design and construction of a new building located in the student parking lot, with a total construction budget not to exceed 54,329,000 dollars and an additional 5,000,000 dollar budget for furniture and equipment. The contract is expected to begin around March 2027 and span approximately 40 months. Key deliverables include a complete design based on a July 2025 feasibility study, a project narrative for timeline and construction scheduling, operational plans to maintain college functions during construction, and a ledge removal plan utilizing non-blasting methods. The selection process utilizes a combined scoring system where technical proposals must score at least 55 out of 70 points to proceed to cost evaluation. Scoring is weighted across a work plan, approach and methodology, staff qualifications, and vendor capability, with a separate 30-point allocation for the cost proposal and up to 6 bonus points for ISBE participation. Technical proposals are limited to six pages and must be submitted via the OSP portal. The project must adhere to the RI Green Buildings Act, the 2024 IECC energy code, and RIDEM requirements, while incorporating ADA-compliant bathrooms and a fully sprinkled system with an emergency diesel generator. Contractual requirements include the use of specific Rhode Island Custom AIA documents and the State's General Conditions of Purchase. The selected vendor must maintain comprehensive insurance, including 2,000,000 dollars in professional liability and 5,000,000 dollars in technology errors and omissions coverage. Performance will be monitored through weekly onsite inspections, with written reports due within two days of each visit to ensure workmanship meets design specifications.
State of Rhode Island

POSTED

about 4 hours ago

DEADLINE

in about 1 month
NAICS: 541310
New
SLED
RFP Architectural and Engineering Services Administration Building Renovations Advanced Water Treatment Facility (AWTF)
Solicitation # 2026-006
Capital Region Water is soliciting proposals for Architectural and Engineering services to renovate and modernize the Administration and Laboratory Building at the Advanced Water Treatment Facility in Harrisburg, Pennsylvania. The project focuses on improving building functionality, operational efficiency, and code compliance through the replacement of curtain wall and window systems, masonry restoration, and the construction of a new ADA-compliant entrance and canopy. The scope also includes the modernization of office and laboratory support spaces, along with comprehensive upgrades to structural, mechanical, electrical, plumbing, and life safety systems. The selected consultant will be responsible for evaluating existing conditions, developing design packages at 30, 60, and 90 percent completion, obtaining permits, and providing construction administration services. Proposals must be submitted electronically via the OpenGov portal by November 23, 2026. Submissions must include a technical proposal highlighting relevant experience, a project team organizational chart, and a separate cost proposal featuring a labor breakdown and a time and materials Not-to-Exceed project fee. Mandatory documentation includes a notarized Non-Collusion Affidavit, a Bidder Affidavit, a Bidder Questionnaire, and an Excel-based Bidder Acknowledgements form. While bid and performance bonds are not required, the contractor must maintain minimum insurance coverage at their own expense and comply with Pennsylvania non-discrimination and affirmative action regulations.
Procurement

POSTED

about 5 hours ago

DEADLINE

in 10 days
NAICS: 541310
New
SLED
Professional Architectural and Engineering Services
Solicitation # STC-27-001
Spindletop Center is soliciting Statements of Qualifications from licensed Texas architectural firms to provide lead architectural design and coordinated engineering services for the renovation of Building F in Beaumont, Texas. The project scope includes the renovation of the existing facility and the design of a kitchen and dining expansion, with comprehensive improvements to HVAC, electrical, plumbing, security, and safety systems. The design must specifically support psychiatric residential youth treatment and mental health respite functions, incorporating specialized behavioral health safety features such as anti-ligature and tamper-resistant elements, while adhering to Texas Accessibility Standards and relevant licensing requirements. The selection process is a qualifications-based solicitation where the most highly qualified firm will be chosen based on a 100-point scoring system. Evaluation criteria are weighted toward comparable healthcare and youth residential experience, team qualifications, project approach, renovation experience, and past performance. Professional fees and pricing must not be included in the initial submission; instead, the Center will negotiate a fair and reasonable scope and fee with the top-ranked firm. Proposals must be submitted as a single electronic PDF by November 30, 2026, at 2:00 p.m. CST. The established construction budget for the project is 2,500,000 dollars.
SPINDLETOP CENTER

POSTED

about 6 hours ago

DEADLINE

in 17 days
NAICS: 541310
New
SLED
UNC Charlotte
Solicitation # 68-UNCC-Study11132026
UNC Charlotte is soliciting study services for the East Campus Sector Assessment, a project focused on developing a comprehensive sector plan for the area bordered by the Botanical Garden, Martin Village Road, and Van Landingham Road. The scope of work involves integrating land use for several key facilities, including a new greenhouse to replace the McMillan Greenhouse, a community garden, parking for approximately 200 vehicles, a dining hall with auxiliary services and administrative offices, and student residential facilities, along with necessary infrastructure such as roads, pedestrian pathways, and utility corridors. The selected designer will be responsible for delivering a conceptual sector plan, conceptual cost estimates, project schedules, phasing plans, and high-level renderings of the greenhouse for fundraising purposes. The total budget for the assessment fee is 200,000 USD, which covers all design fees and reimbursable expenses. The project is scheduled to kick off on January 4, 2027, with a 90 percent draft report due by April 5, 2027, and the final report and presentation due by May 3, 2027. Proposals must be submitted as a single PDF file to Gracie Layman by November 30, 2026. The University's Designer Selection Committee will evaluate submittals based on specialized expertise in planning student life buildings and student unions, past performance on similar projects, staff experience, current workload, and the proposed project approach. Applicants must demonstrate familiarity with the North Carolina State Construction Office and UNC System requirements. Submittals are limited to a maximum of 30 pages and must include a cover sheet, supplemental information form, cover letter, and a detailed description of the team's approach and personnel qualifications.
Unc - System Office

POSTED

about 16 hours ago

DEADLINE

in 17 days

AI Contract Overview

Show more

The Ohio State University has issued a Request for Qualifications for the renovation of Ramseyer Hall, an 87,452 gross-square-foot historic facility. The project aims to address critical deferred maintenance and modernize the building to accommodate the Salmon P. Chase Center for Civics, Culture, and Society, the Mathematics and Statistics Learning Center, and a Classroom Pool. The scope includes building systems upgrades, envelope improvements, accessibility enhancements, and interior reconfiguration to create flexible academic and collaborative spaces. A primary objective is the preservation of the building's architectural heritage and historic integrity. The project will be delivered using the Construction Manager at Risk method, with an estimated construction cost of 32 million dollars and a total project budget of 47.8 million dollars. The selected Architect/Engineer must adhere to strict University standards, including the use of a collaborative BIM-enabled environment, the Target Value Design framework, and the e-Builder Project Management System for closeout. Key deliverables include the Program of Requirements, Schematic Design, and a Basis of Design. The selection process is based on a point-scoring system evaluating firm location, qualifications, team experience, and commitment to the EDGE program, which has a 5 percent participation goal. Approval for construction is anticipated in June 2027, and the design team will be required to provide significant on-site construction administration services.

General Info

OSU seeks an architect for Ramseyer Hall renovation with a 47.8 million budget.

Place of Performance

Not specified

Set-Aside

NONE

Documents

1
PDF, High priority: read this firstrfq
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyThe Ohio State University
Contacts1 person available
OfficeN/A
Organization / AgencyThe Ohio State University
Office AddressN/A

Full Description

Show more
Project number: OSU-270009
Initially designed by University Architect Howard Dwight Smith, Ramseyer Hall is an approximately 87,452 gross-square- foot, four-story facility which currently contains a combination of instructional, office, and support spaces. Ramseyer Hall originated in 1932 as an experimental and progressive K-12 school administered through The Ohio State University's College of Education. In 1968, the facility was converted to university classrooms and administrative offices. Most recently, the building was occupied by the College of Education and Human Ecology, which has since relocated to the newly renovated Campbell Hall. Throughout its history, Ramseyer Hall has undergone numerous interior renovations and building system upgrades of varying scope. As the University plans the next phase of investment in the facility, preserving the building's historic character and architectural heritage will be a significant consideration in both the selection of the design team and the overall renovation approach. The Ohio State University’s motto, Disciplina in Civitatem, or “education for citizenship,” is not merely a slogan; it is an exhortation to remain focused on the responsibility to develop an informed, engaged, and civic-minded citizenry. It is essential to fulfilling Ohio State’s land-grant mission. The University intends to renovate Ramseyer Hall to serve this mission and accommodate the following programs: • Salmon P. Chase Center for Civics, Culture, and Society: The Chase Center’s mission is to educate the next generation of American citizens by exploring the fundamental questions of human flourishing, American constitutional history, and civic virtue. The Center seeks to foster a vibrant intellectual community through rigorous scholarship, classical education, the study of primary texts, and open, respectful debate across diverse viewpoints. • The College of Arts and Sciences Mathematics and Statistics Learning Center (MSLC): Mathematics and Statistics Learning Center supports student success and academic excellence at The Ohio State University by providing innovative, evidence-based learning support and fostering an inclusive environment where all students can develop proficiency, confidence, and independence in mathematics and statistics. • Classroom Pool: The Classroom Pool provides flexible, accessible, and technology-enabled learning environments that support high-quality instruction and enhance the student learning experience at The Ohio State University. The renovation will address critical deferred maintenance and equip Ramseyer Hall to support academic and student- focused functions while preserving the building’s character. The project is anticipated to include building systems upgrades, building envelope improvements, accessibility enhancements, and interior reconfiguration to create flexible office, teaching, and collaborative spaces. The project will be delivered using the Construction Manager at Risk (CMR) delivery method. Procurement of the CMR, including advertisement, interviews, and contract execution, will occur following the selection and engagement of the Architect/Engineer (A/E).
Scope of Services: The project and construction budget as listed in this RFQ is estimated. The budget will be further evaluated, validated, and managed throughout the design and preconstruction phases by the Architect/Engineer (A/E) team in coordination with the Construction Manager and the University. At this time, the project has been approved for design services only. Approval to proceed with construction is anticipated in June 2027. • Validate the findings and recommendations of the preliminary space allocation study and develop the project's Program of Requirements (POR). • Complete Schematic Design (SD) services that establish the project's scope, design direction, and budget alignment. • Develop a comprehensive Basis of Design (BOD) to support subsequent design phases, including Design Development (DD) and Construction Documents (CD). • Prepare a design solution that aligns with the approved construction budget and incorporates flexible design and cost alternatives consistent with the University's Target Value Design (TVD) framework. • Evaluate the existing building mechanical, electrical, plumbing, and life safety systems, and identify infrastructure upgrades required to support the proposed program. • Evaluate the existing building’s interior and envelope to (1) identify and document historically significant and contributing architectural features, materials, finishes, assemblies, and spatial configuration, and (2) to develop a strategy to maintain the building’s historical integrity and preserve its historic value, (3) while accommodating the project’s requirements. • Analyze and compare the life-cycle costs associated with: o Connecting the facility to the University's district chilled water system; and o Replacing the building's existing cooling equipment. • Coordinate all cooling system evaluations and recommendations with ENGIE and the University to ensure compatibility with campus utility infrastructure and long-term operational objectives. • Assist the University and Construction Manager with cost estimating, value analysis, phasing considerations, constructability reviews, and budget management throughout the design process. This project is required to be designed and delivered within a collaborative BIM-enabled environment following The Ohio State University BIM Project Delivery Standards. The Primary firm submitting for the project will be required to have the BIM expertise capable of meeting the aforementioned standards. The Ohio State University BIM Project Delivery Standards can be accessed via the OSU FOD website: BIM Project Delivery Standards. The minimum required BIM Use Cases for this project are noted below. Details on the BIM Uses Cases are outlined in Section 2 of the Ohio State University BIM Project Delivery Standards. Design BIM Use Case Required Additional Notes 2.3.1.1. Model Authoring – Design Intent BIMs (Required for the Architectural team and the Engineering team) X 2.3.2. Existing Conditions Documentation/Modeling X Existing conditions shall be documented and modeled to a level sufficient to identify and protect Ramseyer Hall's historically significant architectural, structural, and interior features. 2.3.3. Program of Requirements (PoR) Validation X 2.3.4. Site Design X 2.3.5. Model Based User Group Meetings/Reviews X 2.3.6. Sustainability (Energy Modeling/Simulation and Performance)/ Design Simulation/Analysis Preferred, not required 2.3.7. Clash Prevention X 2.3.8 Quantity Schedule Construct BIM Use Case Required Additional Notes 2.4.1. Model Authoring – Trade Coordination BIMs 2.4.2. Model Authoring – Shop/Fabrication BIMs X Design BIM Use Case Required Additional Notes 2.4.3. Clash Detection X 2.4.4. Model-based Scheduling (Sequencing/Simulation) X 2.4.5. Model-based Estimating (Quantification/Cost Estimating) 2.4.6. Site Analysis Planning The minimum required deliverables for this project are noted below. Details on the BIM deliverables are outlined in Section 4 of the Ohio State University BIM Project Delivery Standards Deliverable Required BIM Execution Plan X Design Intent BIMs X Revit Model Rule Set Results X Interim Architectural and Structural Conformed Design Intent BIMs X Project Base Point X Conformed Design Intent BIMs X Interim Asset Worksheet X Final Asset Worksheet X This project includes asset tagging. The Primary firm submitting for the project is required to have the expertise capable of meeting this prerequisite and is responsible to support their consultants to meet this requirement. The Asset Tagging Process Diagram, Asset Worksheet Template, and LOD Matrix can be accessed via the OSU FOD website (https://fod.osu.edu/resources) under Design Guidelines, Specifications, Standards; Specifications and Standards; Building Information Modeling (BIM). The project shall follow the applicable University Sustainability Standards: https://fod.osu.edu/sites/default/files/div_18.pdf. The selected A/E, as a portion of its required Scope of Services and prior to submitting its proposals, will discuss and clarify with the Owner and/or the Contracting Authority, the cost breakdown of the Architect/Engineer Agreement detailed cost components to address the Owner’s project requirements. Participate in the Encouraging Growth, Diversity & Equity (EDGE) Program as required by statute and the Agreement. Required Professional Liability Insurance will be per Exhibit A – A/E Terms and Conditions Article 7.2.6. As required by the Agreement, and as properly authorized, provide the following categories of services: Program Verification, Schematic Design, Design Development, Construction Document Preparation, Bid and Award Support, Conformed Documents, Construction Administration, Post-Construction, and Additional Services of all types. Refer to the Ohio Facilities Construction Manual for additional information about the type and extent of services required for each. A copy of the standard Agreement can be obtained at the OFCC website at https://ofcc.ohio.gov. The selected A/E will be required to sign the standard agreement. No modifications to the requirements in the agreement will be accepted. During the construction period, provide not less than 24 hours (excluding travel time) on-site construction administration services each week, including (1) attendance at progress meetings, (2) a written field report of each site visit, (3) on-site representation comprised of the A/E and its consultant staff involved in the primary design of the project, all having relevant and appropriate types of construction administration experience. The project team (Owner / A/E / Contractor) will be required to utilize the University’s Project Management System, for all compatible services required by the University. The Ohio State University is dedicated to providing a safe and healthy environment for students, patients, staff, visitors, and contractors. While not exclusive, guidelines governing safety expectations for construction/ renovation projects within Ohio State buildings are set forth in the Building Design Standards Appendix V and are summarized here: https://fod.osu.edu/resources, under the section titled “Construction Site Safety Requirements.” Closeout Services: The closeout for this project is required to be delivered in an electronic cloud-based format using the e-Builder Project Management System and adhere to The Ohio State University Project Closeout Standards. The Ohio State University Project Closeout Standards can be accessed via the OSU FOD vender resource website (https://fod.osu.edu/resources) under Post Construction / Close Out. For purposes of completing the Relevant Project Experience Matrix in Section F of the Statement of Qualifications (Form F110-330), below is a list of relevant scope of work requirements for this RFQ: 1. Experience completing major renovations of historically significant buildings within the past 15 years while preserving and respecting significant architectural features, materials, finishes, and spatial configurations. 2. Experience successfully integrating contemporary building systems and code requirements into historic buildings, including mechanical, electrical, plumbing, fire protection, technology, accessibility, structural, life-safety, and sustainability improvements, while minimizing adverse impacts to significant historic features and architectural character. 3. Demonstrated ability to utilize target value budgeting / target value design with financially constrained projects while maintaining project values inclusive of design quality and historic character. 4. Experience working with multiple stakeholders, project partners and funding sources 5. Experience with phased design and construction in an occupied building. 6. Experience working with State of Ohio administered projects and The Ohio State University. For the purpose of the selection of 10 Relevant Projects in Section F of the Statement of Qualification (Form F110-330), projects must be designed by the Lead Firm.

More opportunities from The Ohio State University

Same awarding agency

NAICS: 541330
New
SLED
Ohio Stadium - HVAC Replacement
Solicitation # OSU-270103
The Ohio State University Athletics Department is soliciting professional services for project OSU-270103 to conduct a comprehensive study for the replacement of the HVAC, boiler, and chiller systems at Ohio Stadium. The current systems have reached the end of their useful life, and the selected consultant will be responsible for evaluating optimal equipment locations and delivering a detailed report, written narrative, and cost information. This planning phase, budgeted at 30,000 USD, is intended to transition into a full project; if approved by the Board of Trustees, the contract may be amended to include full AE design services. The period of performance for planning services is scheduled from November 26 through February 27. Qualified firms must demonstrate expertise in sports arena mechanical design, HVAC design capabilities, and familiarity with University Sustainability Standards. The selection process utilizes a weighted scoring matrix evaluating firm size, location, staff qualifications, and past performance. All consultants must utilize the e-Builder project management system and participate in the Encouraging Growth, Diversity & Equity (EDGE) Program, with a participation goal of 5% of the initial total planning fee. Submissions must be delivered as a single PDF not exceeding 25 MB by November 30, 2026, and must include the Statement of Qualifications Form F110-330 along with required EDGE documentation.
Engineering Services

POSTED

about 16 hours ago

DEADLINE

in 16 days
View Details
NAICS: 236220
New
SLED
Schumaker Complex - Nutrition Offices
Solicitation # OSU-270003
Project OSU-270003 involves the renovation of the W1210 locker room suite within the Schumaker Complex at The Ohio State University into a new office area for Nutrition Services staff. The scope includes the complete demolition of existing locker and restroom facilities, reconfiguration of HVAC, electrical, and fire alarm systems, and the installation of a new roll-up door for the W1210B storage room. The final space will feature at least three private offices with acoustic insulation and ACT ceilings to ensure a functional environment for confidential consultations. Because the project is located within an active athletics environment, the contractor must coordinate closely with building occupants to maintain safety and minimize operational disruptions. The project will be delivered via a Construction Manager (CM) at Risk contract with an estimated total project cost of 495,000 dollars, of which 337,350 dollars is allocated for construction. The selection process is a two-stage approach consisting of a qualifications-based RFQ to create a short list of at least three candidates, followed by a best-value RFP process evaluating qualifications and fees. The CM is responsible for both preconstruction services, including the development of a Guaranteed Maximum Price (GMP) and constructability reviews, and construction services using an open-book pricing method for subcontracts. Key requirements include adherence to OSU Sustainability Standards, participation in the EDGE program with a 5.0 percent goal, and the use of the e-Builder project management system for all compatible services and closeout.
Commercial and Institutional Building Construction

POSTED

5 days ago

DEADLINE

in 11 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS