Ramseyer Hall Renovation

Active
https://dam.assets.ohio.gov/image/upload/ofcc.ohio.gov/Project_Opportunities/RFQs/2026/RFQ-OSU-270009-AE.pdfState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Ohio State University has issued a Request for Qualifications for the renovation of Ramseyer Hall, an 87,452 gross-square-foot historic facility. The project aims to address critical deferred maintenance and modernize the building to accommodate the Salmon P. Chase Center for Civics, Culture, and Society, the Mathematics and Statistics Learning Center, and a Classroom Pool. The scope includes building systems upgrades, envelope improvements, accessibility enhancements, and interior reconfiguration to create flexible academic and collaborative spaces. A primary objective is the preservation of the building's architectural heritage and historic integrity. The project will be delivered using the Construction Manager at Risk method, with an estimated construction cost of 32 million dollars and a total project budget of 47.8 million dollars. The selected Architect/Engineer must adhere to strict University standards, including the use of a collaborative BIM-enabled environment, the Target Value Design framework, and the e-Builder Project Management System for closeout. Key deliverables include the Program of Requirements, Schematic Design, and a Basis of Design. The selection process is based on a point-scoring system evaluating firm location, qualifications, team experience, and commitment to the EDGE program, which has a 5 percent participation goal. Approval for construction is anticipated in June 2027, and the design team will be required to provide significant on-site construction administration services.

General Info

OSU seeks an architect for Ramseyer Hall renovation with a 47.8 million budget.

Place of Performance

Not specified

Set-Aside

NONE

Documents

(1)

OSU-270009 Ramseyer Hall Renovation RFQ

PDF•rfq

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyThe Ohio State University
Contacts1 person available
OfficeN/A
Organization / AgencyThe Ohio State University
Office AddressN/A
Contacts
Sara LytleProject Manager

Full Description

Show more
Project number: OSU-270009
Initially designed by University Architect Howard Dwight Smith, Ramseyer Hall is an approximately 87,452 gross-square- foot, four-story facility which currently contains a combination of instructional, office, and support spaces. Ramseyer Hall originated in 1932 as an experimental and progressive K-12 school administered through The Ohio State University's College of Education. In 1968, the facility was converted to university classrooms and administrative offices. Most recently, the building was occupied by the College of Education and Human Ecology, which has since relocated to the newly renovated Campbell Hall. Throughout its history, Ramseyer Hall has undergone numerous interior renovations and building system upgrades of varying scope. As the University plans the next phase of investment in the facility, preserving the building's historic character and architectural heritage will be a significant consideration in both the selection of the design team and the overall renovation approach. The Ohio State University’s motto, Disciplina in Civitatem, or “education for citizenship,” is not merely a slogan; it is an exhortation to remain focused on the responsibility to develop an informed, engaged, and civic-minded citizenry. It is essential to fulfilling Ohio State’s land-grant mission. The University intends to renovate Ramseyer Hall to serve this mission and accommodate the following programs: • Salmon P. Chase Center for Civics, Culture, and Society: The Chase Center’s mission is to educate the next generation of American citizens by exploring the fundamental questions of human flourishing, American constitutional history, and civic virtue. The Center seeks to foster a vibrant intellectual community through rigorous scholarship, classical education, the study of primary texts, and open, respectful debate across diverse viewpoints. • The College of Arts and Sciences Mathematics and Statistics Learning Center (MSLC): Mathematics and Statistics Learning Center supports student success and academic excellence at The Ohio State University by providing innovative, evidence-based learning support and fostering an inclusive environment where all students can develop proficiency, confidence, and independence in mathematics and statistics. • Classroom Pool: The Classroom Pool provides flexible, accessible, and technology-enabled learning environments that support high-quality instruction and enhance the student learning experience at The Ohio State University. The renovation will address critical deferred maintenance and equip Ramseyer Hall to support academic and student- focused functions while preserving the building’s character. The project is anticipated to include building systems upgrades, building envelope improvements, accessibility enhancements, and interior reconfiguration to create flexible office, teaching, and collaborative spaces. The project will be delivered using the Construction Manager at Risk (CMR) delivery method. Procurement of the CMR, including advertisement, interviews, and contract execution, will occur following the selection and engagement of the Architect/Engineer (A/E).
Scope of Services: The project and construction budget as listed in this RFQ is estimated. The budget will be further evaluated, validated, and managed throughout the design and preconstruction phases by the Architect/Engineer (A/E) team in coordination with the Construction Manager and the University. At this time, the project has been approved for design services only. Approval to proceed with construction is anticipated in June 2027. • Validate the findings and recommendations of the preliminary space allocation study and develop the project's Program of Requirements (POR). • Complete Schematic Design (SD) services that establish the project's scope, design direction, and budget alignment. • Develop a comprehensive Basis of Design (BOD) to support subsequent design phases, including Design Development (DD) and Construction Documents (CD). • Prepare a design solution that aligns with the approved construction budget and incorporates flexible design and cost alternatives consistent with the University's Target Value Design (TVD) framework. • Evaluate the existing building mechanical, electrical, plumbing, and life safety systems, and identify infrastructure upgrades required to support the proposed program. • Evaluate the existing building’s interior and envelope to (1) identify and document historically significant and contributing architectural features, materials, finishes, assemblies, and spatial configuration, and (2) to develop a strategy to maintain the building’s historical integrity and preserve its historic value, (3) while accommodating the project’s requirements. • Analyze and compare the life-cycle costs associated with: o Connecting the facility to the University's district chilled water system; and o Replacing the building's existing cooling equipment. • Coordinate all cooling system evaluations and recommendations with ENGIE and the University to ensure compatibility with campus utility infrastructure and long-term operational objectives. • Assist the University and Construction Manager with cost estimating, value analysis, phasing considerations, constructability reviews, and budget management throughout the design process. This project is required to be designed and delivered within a collaborative BIM-enabled environment following The Ohio State University BIM Project Delivery Standards. The Primary firm submitting for the project will be required to have the BIM expertise capable of meeting the aforementioned standards. The Ohio State University BIM Project Delivery Standards can be accessed via the OSU FOD website: BIM Project Delivery Standards. The minimum required BIM Use Cases for this project are noted below. Details on the BIM Uses Cases are outlined in Section 2 of the Ohio State University BIM Project Delivery Standards. Design BIM Use Case Required Additional Notes 2.3.1.1. Model Authoring – Design Intent BIMs (Required for the Architectural team and the Engineering team) X 2.3.2. Existing Conditions Documentation/Modeling X Existing conditions shall be documented and modeled to a level sufficient to identify and protect Ramseyer Hall's historically significant architectural, structural, and interior features. 2.3.3. Program of Requirements (PoR) Validation X 2.3.4. Site Design X 2.3.5. Model Based User Group Meetings/Reviews X 2.3.6. Sustainability (Energy Modeling/Simulation and Performance)/ Design Simulation/Analysis Preferred, not required 2.3.7. Clash Prevention X 2.3.8 Quantity Schedule Construct BIM Use Case Required Additional Notes 2.4.1. Model Authoring – Trade Coordination BIMs 2.4.2. Model Authoring – Shop/Fabrication BIMs X Design BIM Use Case Required Additional Notes 2.4.3. Clash Detection X 2.4.4. Model-based Scheduling (Sequencing/Simulation) X 2.4.5. Model-based Estimating (Quantification/Cost Estimating) 2.4.6. Site Analysis Planning The minimum required deliverables for this project are noted below. Details on the BIM deliverables are outlined in Section 4 of the Ohio State University BIM Project Delivery Standards Deliverable Required BIM Execution Plan X Design Intent BIMs X Revit Model Rule Set Results X Interim Architectural and Structural Conformed Design Intent BIMs X Project Base Point X Conformed Design Intent BIMs X Interim Asset Worksheet X Final Asset Worksheet X This project includes asset tagging. The Primary firm submitting for the project is required to have the expertise capable of meeting this prerequisite and is responsible to support their consultants to meet this requirement. The Asset Tagging Process Diagram, Asset Worksheet Template, and LOD Matrix can be accessed via the OSU FOD website (https://fod.osu.edu/resources) under Design Guidelines, Specifications, Standards; Specifications and Standards; Building Information Modeling (BIM). The project shall follow the applicable University Sustainability Standards: https://fod.osu.edu/sites/default/files/div_18.pdf. The selected A/E, as a portion of its required Scope of Services and prior to submitting its proposals, will discuss and clarify with the Owner and/or the Contracting Authority, the cost breakdown of the Architect/Engineer Agreement detailed cost components to address the Owner’s project requirements. Participate in the Encouraging Growth, Diversity & Equity (EDGE) Program as required by statute and the Agreement. Required Professional Liability Insurance will be per Exhibit A – A/E Terms and Conditions Article 7.2.6. As required by the Agreement, and as properly authorized, provide the following categories of services: Program Verification, Schematic Design, Design Development, Construction Document Preparation, Bid and Award Support, Conformed Documents, Construction Administration, Post-Construction, and Additional Services of all types. Refer to the Ohio Facilities Construction Manual for additional information about the type and extent of services required for each. A copy of the standard Agreement can be obtained at the OFCC website at https://ofcc.ohio.gov. The selected A/E will be required to sign the standard agreement. No modifications to the requirements in the agreement will be accepted. During the construction period, provide not less than 24 hours (excluding travel time) on-site construction administration services each week, including (1) attendance at progress meetings, (2) a written field report of each site visit, (3) on-site representation comprised of the A/E and its consultant staff involved in the primary design of the project, all having relevant and appropriate types of construction administration experience. The project team (Owner / A/E / Contractor) will be required to utilize the University’s Project Management System, for all compatible services required by the University. The Ohio State University is dedicated to providing a safe and healthy environment for students, patients, staff, visitors, and contractors. While not exclusive, guidelines governing safety expectations for construction/ renovation projects within Ohio State buildings are set forth in the Building Design Standards Appendix V and are summarized here: https://fod.osu.edu/resources, under the section titled “Construction Site Safety Requirements.” Closeout Services: The closeout for this project is required to be delivered in an electronic cloud-based format using the e-Builder Project Management System and adhere to The Ohio State University Project Closeout Standards. The Ohio State University Project Closeout Standards can be accessed via the OSU FOD vender resource website (https://fod.osu.edu/resources) under Post Construction / Close Out. For purposes of completing the Relevant Project Experience Matrix in Section F of the Statement of Qualifications (Form F110-330), below is a list of relevant scope of work requirements for this RFQ: 1. Experience completing major renovations of historically significant buildings within the past 15 years while preserving and respecting significant architectural features, materials, finishes, and spatial configurations. 2. Experience successfully integrating contemporary building systems and code requirements into historic buildings, including mechanical, electrical, plumbing, fire protection, technology, accessibility, structural, life-safety, and sustainability improvements, while minimizing adverse impacts to significant historic features and architectural character. 3. Demonstrated ability to utilize target value budgeting / target value design with financially constrained projects while maintaining project values inclusive of design quality and historic character. 4. Experience working with multiple stakeholders, project partners and funding sources 5. Experience with phased design and construction in an occupied building. 6. Experience working with State of Ohio administered projects and The Ohio State University. For the purpose of the selection of 10 Relevant Projects in Section F of the Statement of Qualification (Form F110-330), projects must be designed by the Lead Firm.

Similar Contracts

Same NAICS industry code

NAICS: 541310
New
SLED
ARCHITECT/ENGINEER (A/E) ARCHITECTURAL SERVICES
Solicitation # 060-2730-RFQ- AE-JC
The Orange County Sheriff-Coroner Department (OCSD) is soliciting Statements of Qualifications (SOQs) to establish a ranked slate of qualified firms to provide on-call Architect/Engineer (A/E) architectural services. This usage contract, with a total value not to exceed 1,500,000 dollars, supports project delivery for approximately 60 facilities, including jails, crime laboratories, and administrative offices. The scope of work encompasses capital improvement projects, rehabilitation, adaptive reuse of governmental facilities, and various miscellaneous small projects. Work is assigned via individual Contract Task Orders (CTOs) and is compensated through either not-to-exceed fixed fees or time and materials charges. Qualified respondents must have at least five years of business operations in California, experience performing similar work in Southern California, and an office located within two hours of the OCSD Research and Development Building in Orange. Project managers must be California licensed professionals with at least five years of experience. The selection process involves a numerical scoring method based on technical expertise, personnel, and project approach, followed by oral interviews for top-scoring firms. Finalists are recommended to the County Board of Supervisors for approval. Key administrative requirements include mandatory background checks and security clearances for all personnel accessing Sheriff facilities, compliance with California prevailing wage laws, and specific insurance minimums, including 1,000,000 dollars per occurrence for general liability. Submissions must be uploaded via the OpenGov portal by October 23, 2026, and must include a W-9, a campaign contribution disclosure form, and a statement of validity for 365 days. Preference is given to certified County of Orange Local Small Businesses and Disabled Veteran Business Enterprises, though the latter is not applicable to A-E construction projects.
Sheriff-Coroner

POSTED

about 18 hours ago

DEADLINE

in 25 days
View Details
NAICS: 541310
New
SLED
Architectural Services For Wasco Union Elementary School District
Solicitation # 20260925057
The Wasco Union Elementary School District is soliciting proposals from qualified architectural firms to provide comprehensive architectural, engineering, and construction administration services for various projects in Wasco, California. The scope of work covers the entire project lifecycle, including initial planning, schematic design, design development, final working drawings, bid phase support, construction observation, and project closeout. The selected firm will be responsible for design efficiency, cost and schedule control, and securing necessary approvals from the Division of State Architect and the State Department of Education. Services may be adapted for different delivery methods, such as Multi-Prime Construction Management, and must adhere to the highest professional standards, ADA requirements, and California law. Proposals are due by October 30, 2026, at 8:00 a.m. and must be submitted in a sealed container with five copies of the requested information. The evaluation process is subjective, focusing on firm and principal experience, personnel qualifications, budgetary ability, work quality, and fee proposals, with a preference for local consultants. Key requirements include compliance with Disabled Veteran Business Enterprise goals of at least 3 percent and the provision of specific insurance certificates. The contract period extends from the time of award through final project acceptance and any subsequent warranty periods. Selection may involve a short-list of firms invited to provide oral presentations to the evaluation committee.
Wasco Union Elementary School District

POSTED

about 18 hours ago

DEADLINE

in about 1 month
View Details

More opportunities from The Ohio State University

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS