Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Georgia was posted on July 28, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

HDPE Effluent Force Main Installation

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237120
New
SLED
Kiefer Landfill Gas Utilization Project
Solicitation # PLER2024-00137
Kiefer Landfill Generating III, LLC is proposing to develop a renewable natural gas facility at the Kiefer Landfill in Sacramento County with a production capacity of 8,000 standard cubic feet per minute. The project will capture and process landfill gas to remove moisture and impurities, upgrading it to pipeline-quality methane that meets air quality standards. A new pipeline will be constructed to transport the purified gas to existing Pacific Gas & Electric infrastructure, with two proposed routes both beginning at the landfill and traveling northwest along Kiefer Boulevard before turning north along Sunrise Boulevard to terminate near the intersection of Sunrise Boulevard and Douglas Road. Depending on the selected route, the pipeline will connect to PG&E’s system via either a compressor station or a metering and regulating station located near designated property parcels on Douglas Road. The pipeline alignment is planned to utilize public rights-of-way and existing private easements to minimize land use impacts. The project is being managed under Sacramento County’s oversight, with environmental coordination handled by Julie Newton, and key stakeholders including applicant Andrew Petric of NextEra Energy and Project Manager Kathalyn Tung of MBaker International. The initiative is part of broader efforts to advance renewable energy by converting landfill emissions into usable natural gas, supporting regional decarbonization goals. The facility and pipeline will be sited entirely within Sacramento County, with the final interconnection point targeting PG&E’s distribution or transmission system in the 95683 zip code area. The project was posted as a forecast on June 11, 2026, and is currently undergoing environmental review under California’s CEQA process, with no set-aside or NAICS classifications provided at this stage.
Sacramento County

POSTED

about 16 hours ago

DEADLINE

N/A
NAICS: 237120
Federal
Joint Base Langley Eustis Tank Repairs
Solicitation # W9128F27RA018
Solicitation W9128F27RA018 is a firm fixed-price, design-build construction project for API 653 tank repairs at Joint Base Langley-Eustis, Virginia, supporting the Defense Logistics Agency. This total small business set-aside, under NAICS 237120, has an estimated construction magnitude between 4 million and 8 million dollars and an estimated period of performance of 455 days. The scope of work is divided into repair and maintenance for Tank 2186, including the replacement of the tank roof, repair of various piping systems, replacement of spiral stairs, and application of new tank and piping coatings. Additionally, the project requires the procurement, installation, and commissioning of automatic tank gauging equipment and software for Tanks 2182 through 2187, with an optional CLIN for the disposal of asbestos-containing materials. The government will evaluate proposals based on technical approach, schedule, past performance, and price, with the technical approach and schedule weighted slightly more heavily than past performance. Key deliverables include 65 percent and 100 percent design submittals, a Contractor Quality Control plan, and Activity Hazard Analysis. The contractor must adhere to API 653 standards, Davis-Bacon prevailing wage rates, and strict environmental regulations regarding lead-based paint. Proposals must be submitted via PIEE in three separate files, including a technical volume, a past performance volume, and a pricing schedule in Excel format. Final acceptance requires a joint Contractor-Government turnover inspection and validation of laboratory samples by a DoD ELAP certified laboratory.
W071 Endist Omaha

POSTED

9 days ago

DEADLINE

in 4 days
NAICS: 237120
SLED
Construction of Compressed Natural Gas (CNG) Fueling Facility
Solicitation # RFP 2026-05
The Birmingham-Jefferson County Transit Authority (BJCTA) is soliciting proposals under RFP 2026-05 for the construction of a complete and operational Compressed Natural Gas (CNG) Fueling Facility located at 373 Forestdale Blvd, Birmingham, AL. The scope of work encompasses selective demolition of existing slabs and utilities, site grading for positive drainage, and the full installation and integration of CNG mechanical, electrical, controls, detection, ventilation, and safety systems. The project concludes with startup testing, commissioning, and the provision of training and O&M documentation. Proposals must be submitted electronically via the PlanetBids Vendor Portal by November 19, 2026, at 2:00 pm. Award will be granted to the responsible proposer determined to be most advantageous to BJCTA, with price serving as the single most heavily weighted individual factor, though combined non-price factors are more important overall. Evaluation is based on a 100-point scale, focusing heavily on relevant CNG and fleet fueling construction experience, technical complexity, and past performance on publicly or federally funded projects. Mandatory requirements, including Alabama contractor licensing, bonding capability, and debarment status, will be evaluated on a pass/fail basis. The contract is subject to stringent federal and state regulations, including Federal Transit Administration (FTA) requirements, the Build America, Buy America (BABA) Act, and the Davis-Bacon and Related Acts. Contractors must comply with 49 CFR Part 26 DBE requirements, EEO and civil rights certifications, and ADA Title I accessibility standards. Financial security is required via a 5% bid bond, with 100% performance and payment bonds required upon contract execution. Payment administration will utilize AIA Documents G702 and G703, with the Architect serving as the primary point of contact for certifying payments.
Procurement Department of Birmingham-Jefferson County Transit Authority

POSTED

11 days ago

DEADLINE

in about 1 month
NAICS: 237120
SLED
27-002 Gas Main Installer
Solicitation # RFP 27-002
The City of Commerce is soliciting proposals for a standby professional service provider to handle natural gas main installations and repairs within its service area. The contract is for an initial term of one year, with the option to renew annually for up to three years. The scope of work includes various installation tasks such as polyethylene gas main laying, boring, valve installation, and tie-ins for 2-inch and 4-inch mains, as well as rock removal. Proposals will be evaluated by a committee based on cost (40 points), proposal completeness (20 points), the quality of previous similar projects (20 points), project understanding (15 points), and the ability to meet timelines (5 points). Successful bidders must provide a bid bond equal to 5% of the base proposal and a performance bond equal to 100% of the contract amount upon award. Insurance requirements include general liability coverage of at least $1,000,000 per incident and Georgia-mandated workman's compensation. Contractors must comply with the laws of the State of Georgia, including the Illegal Immigration Reform and Enforcement Act of 2011 and E-Verify registration. Additionally, the contractor must provide operator qualifications for all employees and submit PHMSA drug and alcohol testing data to the City on a quarterly basis. Payment is processed 30 days after invoice or delivery, contingent upon the completion of all construction and successful testing of installed products. Proposals must be submitted in a sealed package by November 6, 2026, and must include an executive summary, at least three Georgia-based client references, a W-9, and a completed vendor master form. Submissions require two paper copies and one electronic copy in PDF or Word format, with technical requirements provided in Excel.
City of Commerce

POSTED

11 days ago

DEADLINE

in 21 days

AI Contract Overview

Show more

The contract involves the supply and installation of 2,170 linear feet of 4-inch high-density polyethylene effluent force main, encompassing all necessary fieldwork including trenching, fusion welding of pipe segments, pressure testing to ensure system integrity, and backfilling to restore the disturbed areas. The work must meet industry standards for material quality and installation practices to guarantee long-term performance under operational conditions. All activities are to be executed in accordance with relevant engineering specifications and safety protocols to prevent leaks, settlement issues, or other failures. The opportunity is classified as a subcontract under NAICS code 237120 for Water and Sewer Line and Related Structures Construction, issued by the River Valley Regional Commission in Georgia. The solicitation was posted on July 28, 2026, with a response deadline of September 3, 2026, at 7:00 PM Eastern Time. The place of performance and specific location details are not provided in the data, but the work is expected to occur within the jurisdiction served by the commission. Interested contractors must submit proposals by the deadline to be considered for award, with no set-asides specified for small or disadvantaged businesses. Further information can be accessed via the provided online link.

General Info

Supply and install 2,170 linear feet of 4-inch HDPE force main with trenching, welding, testing, and backfilling.

Documents

This scope was carved out of PE-33551-NONST-2027-000000058.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

City of Arabi Advertisement for Bids Sewer Improvements

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → River Valley Regional Commission
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supply and installation of 2,170 linear feet of 4-inch HDPE effluent force main including trenching, fusion welding, pressure testing, and backfilling.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS